LiuGong introduces 936F excavator for heavy-duty digging
Equipment

LiuGong introduces 936F excavator for heavy-duty digging

The company announced that the new excavators had been introduced the previous year. It was mentioned that the 936F weighed 85,538 pounds (38 metric tonne) and was powered by a 314-horsepower Cummins engine. It was pointed out that the excavator featured three new power modes: Power, Standard, and Eco. The information provided indicated that the new engine offered 5% more torque in comparison to high torque at low speeds, along with a 23% increase in slew torque. According to LiuGong, the fuel consumption had been reduced by 10% compared to the earlier E Series excavators. Additionally, it was highlighted that the digging depth of the 936F was 24.1 feet, and its bucket capacity was 2.3 cubic yards.

LiuGong had made the excavator's counterweight 1,534 pounds heavier, and adjustments had been made to the undercarriage, resulting in a longer and more robust design with bilateral supported upper rollers. These changes were intended to enhance support and decrease wear. The company had also reinforced the boom and arm of the excavator, a modification that was claimed to lower stress on the machine by 25%. The incorporation of deeper side beams was noted to improve impact resistance and facilitate the addition of more impact plates.

Additional features were listed, including the utilisation of Kawasaki electro-hydraulic controls and a larger hydraulic pump to achieve an 11% increase in flow. The excavator was reported to include boom float technology aimed at preventing excessive pressure during breaking operations, thereby reducing fuel consumption during tasks involving smooth levelling and deep excavation. The presence of attachment flow and pressure control was mentioned, as well as a 360-degree camera that provided a panoramic view around the excavator.

Improvements in guard rails and tread plates were detailed, with the goal of preventing slipping. Furthermore, the intervals for oil changes had been extended to 5,000 hours.

Also read:
Irish Cranes installs four Raimondi flat-tops in Dublin
Data exchange with B&R Automation PC Mobile 3100


"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The company announced that the new excavators had been introduced the previous year. It was mentioned that the 936F weighed 85,538 pounds (38 metric tonne) and was powered by a 314-horsepower Cummins engine. It was pointed out that the excavator featured three new power modes: Power, Standard, and Eco. The information provided indicated that the new engine offered 5% more torque in comparison to high torque at low speeds, along with a 23% increase in slew torque. According to LiuGong, the fuel consumption had been reduced by 10% compared to the earlier E Series excavators. Additionally, it was highlighted that the digging depth of the 936F was 24.1 feet, and its bucket capacity was 2.3 cubic yards. LiuGong had made the excavator's counterweight 1,534 pounds heavier, and adjustments had been made to the undercarriage, resulting in a longer and more robust design with bilateral supported upper rollers. These changes were intended to enhance support and decrease wear. The company had also reinforced the boom and arm of the excavator, a modification that was claimed to lower stress on the machine by 25%. The incorporation of deeper side beams was noted to improve impact resistance and facilitate the addition of more impact plates. Additional features were listed, including the utilisation of Kawasaki electro-hydraulic controls and a larger hydraulic pump to achieve an 11% increase in flow. The excavator was reported to include boom float technology aimed at preventing excessive pressure during breaking operations, thereby reducing fuel consumption during tasks involving smooth levelling and deep excavation. The presence of attachment flow and pressure control was mentioned, as well as a 360-degree camera that provided a panoramic view around the excavator. Improvements in guard rails and tread plates were detailed, with the goal of preventing slipping. Furthermore, the intervals for oil changes had been extended to 5,000 hours. Also read: Irish Cranes installs four Raimondi flat-tops in DublinData exchange with B&R Automation PC Mobile 3100

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement