+
Warehousing witnessed over 50% growth YoY, almost 32 mn sq ft in 2018
Real Estate

Warehousing witnessed over 50% growth YoY, almost 32 mn sq ft in 2018

The year 2018 saw India’s warehousing and logistics sector coming of age, outshining some conventional real estate asset classes and attracting the attention of global investors.

Indeed, the year witnessed a 22-per-cent, year-on-year (YoY) growth in total stock in Grade A and B warehousing space in the top eight cities, while total inventory in these cities evolved to 169 million sq ft in 2018 from 138 million sq ft a year ago. Interestingly, according to JLL, the absorption in total warehousing space also witnessed over 50 per cent growth YoY, reaching almost 32 million sq ft in 2018. Built-to-suit developments constituted 26 per cent of the absorption last year. Clearly, demand is outstripping supply significantly, with vacancies dropping below 10 per cent for the first time ever.

 Source: JLL Industrial Research 2019 for Grade-A & B spaces in top 8 cities in India 

               *includes BTS spaces


Cities Driving Opportunities

City

2018 warehousing absorption (million sq ft)

Delhi-NCR

9.8

Bengaluru

4.6

Pune

3.9

Mumbai

3.6

Kolkata

3.4

Chennai

2.7

Ahmedabad

2.6

Hyderabad

1.2

Source: JLL India

  • India’s top eight cities are driving warehousing opportunities.
  • Delhi-NCR remained buoyant, with over 25 per cent of total absorption.
  • There is a growing focus in Tier-II cities, including Coimbatore, Guwahati, Jaipur, Lucknow, Nagpur and Ludhiana.
  • SERAPHINA D’SOUZA

    The year 2018 saw India’s warehousing and logistics sector coming of age, outshining some conventional real estate asset classes and attracting the attention of global investors. Indeed, the year witnessed a 22-per-cent, year-on-year (YoY) growth in total stock in Grade A and B warehousing space in the top eight cities, while total inventory in these cities evolved to 169 million sq ft in 2018 from 138 million sq ft a year ago. Interestingly, according to JLL, the absorption in total warehousing space also witnessed over 50 per cent growth YoY, reaching almost 32 million sq ft in 2018. Built-to-suit developments constituted 26 per cent of the absorption last year. Clearly, demand is outstripping supply significantly, with vacancies dropping below 10 per cent for the first time ever.  Source: JLL Industrial Research 2019 for Grade-A & B spaces in top 8 cities in India                *includes BTS spacesCities Driving Opportunities City2018 warehousing absorption (million sq ft)Delhi-NCR9.8Bengaluru4.6Pune3.9Mumbai3.6Kolkata3.4Chennai2.7Ahmedabad2.6Hyderabad1.2Source: JLL India India’s top eight cities are driving warehousing opportunities. Delhi-NCR remained buoyant, with over 25 per cent of total absorption. There is a growing focus in Tier-II cities, including Coimbatore, Guwahati, Jaipur, Lucknow, Nagpur and Ludhiana.SERAPHINA D’SOUZA

    Next Story
    Infrastructure Transport

    MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

    The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

    Next Story
    Infrastructure Transport

    CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

    Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

    Next Story
    Infrastructure Transport

    Maha-Metro Invites Pune Metro Civil Maintenance Bids

    Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

    Advertisement

    Subscribe to Our Newsletter

    Get daily newsletters around different themes from Construction world.

    STAY CONNECTED

    Advertisement

    Advertisement

    Advertisement

    Open In App