Oberoi Realty to Develop 81.05 Acre of Land in Alibaug
Real Estate

Oberoi Realty to Develop 81.05 Acre of Land in Alibaug

Oberoi Realty has entered into an agreement for the development of land measuring approximately 81.05 acre (3,28,010 sq metres), located at village Tekali, Alibaug.

Of this land, approximately 8.6 acre (34,803 sq metres) will be designated and transferred to the company for the construction of a high-end luxury star hotel or resort, with a Floor Space Index (FSI) of about 30,000 sq metres.

For the remaining land, which spans approximately 72.45 acre (2,93,207 sq metres), the company plans to develop around 150 high-end, fully serviced, branded residential villas, utilising an FSI of approximately 1,20,000 sq metres.

Oberoi Realty has entered into an agreement for the development of land measuring approximately 81.05 acre (3,28,010 sq metres), located at village Tekali, Alibaug. Of this land, approximately 8.6 acre (34,803 sq metres) will be designated and transferred to the company for the construction of a high-end luxury star hotel or resort, with a Floor Space Index (FSI) of about 30,000 sq metres. For the remaining land, which spans approximately 72.45 acre (2,93,207 sq metres), the company plans to develop around 150 high-end, fully serviced, branded residential villas, utilising an FSI of approximately 1,20,000 sq metres.

Next Story
Infrastructure Energy

Adani Power To Build 2,400 MW Plant in Bihar

Adani Power on Saturday (September 13, 2025) announced plans to set up a 2,400 MW ultra super-critical power plant in Bihar at an investment of $3 billion (around Rs 26.48 billion).The company has signed a 25-year Power Supply Agreement (PSA) with Bihar State Power Generation Company Ltd (BSPGCL) to supply electricity from the project, which will be located at Pirpainti in Bhagalpur district.The PSA follows a Letter of Award issued by BSPGCL to Adani Power on behalf of North Bihar Power Distribution Company Ltd (NBPDCL) and South Bihar Power Distribution Company Ltd (SBPDCL) in August. Adani P..

Next Story
Infrastructure Energy

NTPC Plans Nuclear Power Projects Via JV and Standalone Routes

Power major NTPC is planning to develop nuclear power projects both through joint ventures and on a standalone basis, CMD Gurdeep Singh has said.The company is collaborating with nuclear technology providers and state governments to explore individual nuclear projects, Singh added.Currently, the NTPC Group has an installed capacity of 82,926 MW across 53 NTPC-owned stations and 53 joint venture or subsidiary stations, drawing power from coal, liquid fuel, hydro, and solar sources.In December 2024, Singh had announced NTPC’s ambitious plan to enter the nuclear energy sector, a move expected t..

Next Story
Infrastructure Transport

RVNL Wins $21.6 Million Bhopal Division Traction Substation

Rail Vikas Nigam (RVNL) has been declared the lowest bidder for a $21.6 million traction substation contract awarded by the West Central Railway.The project covers the design, modification, supply, erection, testing, and commissioning of a 220/132kV/2×25kV Scott-connected traction substation, switching posts, Auto-Transformer installations, and Supervisory Control and Data Acquisition (SCADA) systems in the Bina–RTA section of the Bhopal Division. The execution period is set at 540 days.In a regulatory filing, RVNL stated that the order was secured in the ordinary course of business and doe..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?