Printing a Post Office!
Real Estate

Printing a Post Office!

India’s first 3D-printed post office building was constructed in Cambridge Layout, Halasuru, Bengaluru, by L&T Construction, B&F Fast. To learn more, CW’s R SRINIVASAN spoke to Rajkumar Murali, Chief Architect, B&F Fast, L&T Construction. He said, “The post office building was constructed using a 180-mm solid wall design, adhering to the approved structural design and in compliance with Indian codes. The wall thickness was divided into three parts: an external wall portion of 60 mm, an inside wall portion of 60 mm, and a void of 60 mm in between. During the 3D printing process, horizontal reinforcement was seamlessly integrated into the structure using 5-mm weld mesh. This reinforcement was strategically placed within the walls as the printing progressed. Once the 3D printing reached the full height, vertical reinforcement bars were inserted through the central void created earlier. Subsequently, the entire void space was filled with 3D printable concrete, ensuring a robust and reinforced structure.”

He added, “By adopting this methodology, we successfully integrated both vertical reinforcement bars and horizontal distributors into the 3D printing process. The usage of welded mesh for horizontal reinforcement and the insertion of vertical reinforcement bars complied with the requirements of the structural design and Indian codes, guaranteeing a reliable and durable post office building.”

To read full article: Click here

India’s first 3D-printed post office building was constructed in Cambridge Layout, Halasuru, Bengaluru, by L&T Construction, B&F Fast. To learn more, CW’s R SRINIVASAN spoke to Rajkumar Murali, Chief Architect, B&F Fast, L&T Construction. He said, “The post office building was constructed using a 180-mm solid wall design, adhering to the approved structural design and in compliance with Indian codes. The wall thickness was divided into three parts: an external wall portion of 60 mm, an inside wall portion of 60 mm, and a void of 60 mm in between. During the 3D printing process, horizontal reinforcement was seamlessly integrated into the structure using 5-mm weld mesh. This reinforcement was strategically placed within the walls as the printing progressed. Once the 3D printing reached the full height, vertical reinforcement bars were inserted through the central void created earlier. Subsequently, the entire void space was filled with 3D printable concrete, ensuring a robust and reinforced structure.”He added, “By adopting this methodology, we successfully integrated both vertical reinforcement bars and horizontal distributors into the 3D printing process. The usage of welded mesh for horizontal reinforcement and the insertion of vertical reinforcement bars complied with the requirements of the structural design and Indian codes, guaranteeing a reliable and durable post office building.”To read full article: Click here

Next Story
Infrastructure Urban

India Expands Semiconductor Training To 500 Institutions

Under the Chips to Startups programme of the India Semiconductor Mission, the Union minister responsible for Railways, Information and Broadcasting, and Electronics and IT reported notable progress in talent development. He indicated that over the past four years substantial steps have been taken towards a 10-year target of training 85,000 engineers in semiconductor design. World-class EDA tools have been deployed in 315 academic institutions across the country to provide students with practical exposure to chip design. These EDA tools are supported by leading global firms and are accessible t..

Next Story
Infrastructure Urban

Delhi Institutions Support India Semiconductor Mission

The Government of India has prioritised talent development through training, upskilling and workforce development under the Chips to Startups initiative of the India Semiconductor Mission, with officials noting progress in four years towards a 10-year target of training 85,000 engineers in semiconductor design. Electronic design automation tools provided by Synopsys, Cadence, Siemens, Renesas, Ansys and AMD have been deployed in 315 academic institutions, enabling students to gain practical chip design experience. Chips have been fabricated and tested at the Semiconductor Laboratory, Mohali, a..

Next Story
Infrastructure Urban

NHA Announces Winners Of NHCX Hackathon At IIT Hyderabad

The National Health Authority (NHA) has concluded the NHCX Hackathon under the Ayushman Bharat Digital Mission (ABDM) to stimulate innovation around the National Health Claims Exchange (NHCX). The winning teams presented their solutions at the NHCX Innovation Meet held at IIT Hyderabad during a two-day event in March 2026 that also served as the hackathon grand finale. The hackathon itself ran from 22 to 28 February 2026 and aimed to accelerate paperless, transparent claims processing across India. The event was organised with a range of ecosystem partners, including the Insurance Regulatory a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement