SECR Floats Rs 6,019 Mn EPC Tender For Paradol Nagpur Link
ECONOMY & POLICY

SECR Floats Rs 6,019 Mn EPC Tender For Paradol Nagpur Link

South East Central Railway (SECR) has invited bids for an Engineering, Procurement and Construction (EPC) contract to build a new broad gauge single line between Paradol Takeoff Point and Nagpur Road Station in Chhattisgarh. The contract carries an estimated cost of Rs 6,019.0 mn and requires an earnest money deposit of Rs 120.4 mn. The work is framed as an EPC assignment intended to strengthen regional rail infrastructure.

The tender, issued under number CAO-C-BSP-26-27-15, specifies a completion period of 730 days and a bid validity of 180 days. Two pre-bid meetings are scheduled for 24 August 2026 and 16 September 2026, with the submission window closing on 27 November 2026 at 3:00 PM. The tender documentation outlines technical and commercial conditions for civil, track and associated works. Interested contractors are expected to review the requirements and prepare bids in line with the stipulated timelines.

The scope covers construction of the new single line commencing at Paradol Takeoff Point at km 947.257 and terminating at Nagpur Road Station at km 964.820, together with slewing of the existing Boridand-Chirmiri line between km 946.640 and km 947.257. The alignment and slewing works form part of efforts to improve operational flexibility on the corridor. The project is located within the SECR zone and will interface with existing network assets.

Railway authorities have positioned the project as a means to improve train movement, operational efficiency and capacity for passenger and freight services. The new link is expected to support future traffic growth and to enhance access to industrial and mining areas, contributing to regional economic development. Contractors successful in the EPC bid will be responsible for delivering civil works, track laying and associated signalling arrangements within the prescribed period. Project delivery will follow standard Indian Railways technical specifications and safety norms and applicable environmental requirements.

South East Central Railway (SECR) has invited bids for an Engineering, Procurement and Construction (EPC) contract to build a new broad gauge single line between Paradol Takeoff Point and Nagpur Road Station in Chhattisgarh. The contract carries an estimated cost of Rs 6,019.0 mn and requires an earnest money deposit of Rs 120.4 mn. The work is framed as an EPC assignment intended to strengthen regional rail infrastructure. The tender, issued under number CAO-C-BSP-26-27-15, specifies a completion period of 730 days and a bid validity of 180 days. Two pre-bid meetings are scheduled for 24 August 2026 and 16 September 2026, with the submission window closing on 27 November 2026 at 3:00 PM. The tender documentation outlines technical and commercial conditions for civil, track and associated works. Interested contractors are expected to review the requirements and prepare bids in line with the stipulated timelines. The scope covers construction of the new single line commencing at Paradol Takeoff Point at km 947.257 and terminating at Nagpur Road Station at km 964.820, together with slewing of the existing Boridand-Chirmiri line between km 946.640 and km 947.257. The alignment and slewing works form part of efforts to improve operational flexibility on the corridor. The project is located within the SECR zone and will interface with existing network assets. Railway authorities have positioned the project as a means to improve train movement, operational efficiency and capacity for passenger and freight services. The new link is expected to support future traffic growth and to enhance access to industrial and mining areas, contributing to regional economic development. Contractors successful in the EPC bid will be responsible for delivering civil works, track laying and associated signalling arrangements within the prescribed period. Project delivery will follow standard Indian Railways technical specifications and safety norms and applicable environmental requirements.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code