Gujarat’s new Greenfield airport completes 95 per cent of earth work
AVIATION & AIRPORTS

Gujarat’s new Greenfield airport completes 95 per cent of earth work

From railways to aviation, the country's infrastructure development is accelerating. Prime Minister Narendra Modi has made it a priority to provide world-class infrastructure and transportation facilities across the country. Airport transformation and expansion have been undertaken from time to time by the Airports Authority of India (AAI) and other Airport Developers in this context.

AAI has recently begun work on the construction of a new greenfield airport in Gujarat. The new airport is about 30 kilometres from Rajkot and on the Rajkot-Ahmadabad highway. The new airport will cost Rs 1,405 crores to build. More than 95% of the earthwork has been completed.

The airport, which spans 1,025 hectares, is being built with cutting-edge technology to improve the passenger experience. The airport will be operational by December 2023.

Terminal building
During peak hours, the new Greenfield Airport terminal building will be able to handle over 1,700 passengers. The building's facade design is inspired by Rajkot's existing palaces, such as the Ranjit Vilas Palace, and incorporates traditional elements into a modern form. Aside from that, the terminal building will feature various art forms such as dandiya dance.

The terminal will have a total built-up area of 23,000 sqm and will be outfitted with cutting-edge passenger amenities such as 20 check-in counters, three conveyor belts, and four passenger boarding bridges. The most recent firefighting equipment and a fire alarm system will also be installed.

Runway
Rajkot's new Greenfield airport's runway will be 3,040 meters long. It will be able to serve Airbus-321 aircraft, and the apron will be large enough to accommodate 14 aircraft.

About Rajkot
Gujarat's fourth-largest city is Rajkot. Once completed, the new Greenfield airport will help the neighborhood's businesses, bringing economic prosperity to the entire nation. It will shorten travel time and improve the region's air traffic flow.

See also:
Greenfield Airport in Rajkot to be operational by 2023 end
Centre 'in-principle' approves six greenfield airports


From railways to aviation, the country's infrastructure development is accelerating. Prime Minister Narendra Modi has made it a priority to provide world-class infrastructure and transportation facilities across the country. Airport transformation and expansion have been undertaken from time to time by the Airports Authority of India (AAI) and other Airport Developers in this context. AAI has recently begun work on the construction of a new greenfield airport in Gujarat. The new airport is about 30 kilometres from Rajkot and on the Rajkot-Ahmadabad highway. The new airport will cost Rs 1,405 crores to build. More than 95% of the earthwork has been completed. The airport, which spans 1,025 hectares, is being built with cutting-edge technology to improve the passenger experience. The airport will be operational by December 2023. Terminal building During peak hours, the new Greenfield Airport terminal building will be able to handle over 1,700 passengers. The building's facade design is inspired by Rajkot's existing palaces, such as the Ranjit Vilas Palace, and incorporates traditional elements into a modern form. Aside from that, the terminal building will feature various art forms such as dandiya dance. The terminal will have a total built-up area of 23,000 sqm and will be outfitted with cutting-edge passenger amenities such as 20 check-in counters, three conveyor belts, and four passenger boarding bridges. The most recent firefighting equipment and a fire alarm system will also be installed. Runway Rajkot's new Greenfield airport's runway will be 3,040 meters long. It will be able to serve Airbus-321 aircraft, and the apron will be large enough to accommodate 14 aircraft. About Rajkot Gujarat's fourth-largest city is Rajkot. Once completed, the new Greenfield airport will help the neighborhood's businesses, bringing economic prosperity to the entire nation. It will shorten travel time and improve the region's air traffic flow. See also: Greenfield Airport in Rajkot to be operational by 2023 endCentre 'in-principle' approves six greenfield airports

Next Story
Building Material

Trishakti Industries Secures Major Tata Steel Order

Trishakti Industries Limited has secured a significant order from Tata Steel Ltd for the deployment of advanced machinery and skilled manpower at one of the steel major’s flagship project sites.The contract, awarded domestically, involves the hiring of machines along with manpower, with execution set to be completed by 20th September 2025. The initial contract period is 12 months. The total fresh capital expenditure for the project is approximately Rs 1.5 million, while the overall contract value is expected to exceed Rs 5 million inclusive of taxes.This order marks a reinforcement of top-ti..

Next Story
Real Estate

Kalpataru Projects Secures Rs 27.2 Billion in New Orders

Kalpataru Projects International Limited (KPIL), a leading EPC player in the power transmission and distribution (T&D) and civil infrastructure sector, along with its international subsidiaries, has received new orders and notifications for projects worth approximately Rs 27.2 billion.The projects include:Power Transmission & Distribution (T&D) initiatives in India and overseas.Buildings and Factories (B&F) projects in India.Manish Mohnot, MD & CEO of KPIL, said, “We are delighted with the strong ordering momentum in our T&D and B&F businesses. The orders include ..

Next Story
Infrastructure Energy

ACME Solar Secures Rs 38.92 Billion Financing for Barmer Project

ACME Solar Holdings rose 2.05 per cent to Rs 308.50 after its wholly owned subsidiary, ACME Venus Urja, secured long-term project financing of Rs 38.92 billion from the State Bank of India (SBI).The funds will be utilised for the development and construction of a 400 MW Firm and Dispatchable Renewable Energy (FDRE) project in Barmer, Rajasthan. The loan repayment is structured over 19 years.The Barmer-based FDRE project is contracted with NHPC at a tariff of Rs 4.64 per unit. It will integrate solar power generation with a Battery Energy Storage System (BESS) to ensure higher reliability and d..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?