Maharashtra CM Flags Off Trial Run on Mumbai Metro Line 4
AVIATION & AIRPORTS

Maharashtra CM Flags Off Trial Run on Mumbai Metro Line 4

Maharashtra chief minister Devendra Fadnavis flagged off the first trial run of Mumbai Metro Line 4, marking a significant milestone in the city’s expanding metro network. The corridor, spanning 32.3 km from Wadala to Kasarvadavali, will extend further under Line 4A up to Gaimukh, bringing the total length to 35.1 km with 32 stations.

The initial trial run was carried out on a 4.4 km priority stretch between Gaimukh and Vijay Garden, covering four stations. This section forms part of the first phase of the project, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA).

Metro Line 4 extends 35.2 km from Wadala to Kasarvadavali, with an estimated cost of Rs 145.49 billion. Line 4A, a 2.88 km extension from Kasarvadavali to Gaimukh, is expected to cost approximately Rs 9.49 billion. Together, these lines will improve mobility across several densely populated areas and offer seamless integration with existing and planned metro lines.

A potential interchange with the proposed Mumbai Metro Line 11 will further connect Wadala to CSMT, creating a unified 58-km elevated corridor — the longest of its kind in India.

Speaking on the occasion, Deputy Chief Minister Eknath Shinde said, “More than 172 years after the inauguration of the railway in Thane, the city is now being served by a modern metro system, which is a historic moment for Thane.” He added that the integrated 58-km corridor would significantly ease traffic congestion and enhance connectivity across the Mumbai Metropolitan Region.

The Mumbai Metro Line 4 project aims to provide sustainable, eco-friendly, and efficient transport solutions while reducing road congestion and improving daily commute times for millions of passengers.

News source: Metro Rail News


Maharashtra chief minister Devendra Fadnavis flagged off the first trial run of Mumbai Metro Line 4, marking a significant milestone in the city’s expanding metro network. The corridor, spanning 32.3 km from Wadala to Kasarvadavali, will extend further under Line 4A up to Gaimukh, bringing the total length to 35.1 km with 32 stations.The initial trial run was carried out on a 4.4 km priority stretch between Gaimukh and Vijay Garden, covering four stations. This section forms part of the first phase of the project, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA).Metro Line 4 extends 35.2 km from Wadala to Kasarvadavali, with an estimated cost of Rs 145.49 billion. Line 4A, a 2.88 km extension from Kasarvadavali to Gaimukh, is expected to cost approximately Rs 9.49 billion. Together, these lines will improve mobility across several densely populated areas and offer seamless integration with existing and planned metro lines.A potential interchange with the proposed Mumbai Metro Line 11 will further connect Wadala to CSMT, creating a unified 58-km elevated corridor — the longest of its kind in India.Speaking on the occasion, Deputy Chief Minister Eknath Shinde said, “More than 172 years after the inauguration of the railway in Thane, the city is now being served by a modern metro system, which is a historic moment for Thane.” He added that the integrated 58-km corridor would significantly ease traffic congestion and enhance connectivity across the Mumbai Metropolitan Region.The Mumbai Metro Line 4 project aims to provide sustainable, eco-friendly, and efficient transport solutions while reducing road congestion and improving daily commute times for millions of passengers.News source: Metro Rail News

Next Story
Infrastructure Urban

TBO Tek Q2 Profit Climbs 12%, Revenue Surges 26% YoY

TBO Tek Limited one of the world’s largest travel distribution platforms, reported a solid performance for Q2 FY26 with a 26 per cent year-on-year increase in revenue to Rs 5.68 billion, reflecting broad-based growth and improving profitability.The company recorded a Gross Transaction Value (GTV) of Rs 8,901 crore, up 12 per cent YoY, driven by strong performance across Europe, MEA, and APAC regions. Adjusted EBITDA before acquisition-related costs stood at Rs 1.04 billion, up 16 per cent YoY, translating into an 18.32 per cent margin compared to 16.56 per cent in Q1 FY26. Profit after tax r..

Next Story
Infrastructure Energy

Northern Graphite, Rain Carbon Secure R&D Grant for Greener Battery Materials

Northern Graphite Corporation and Rain Carbon Canada Inc, a subsidiary of Rain Carbon Inc, have jointly received up to C$860,000 (€530,000) in funding under the Canada–Germany Collaborative Industrial Research and Development Programme to develop sustainable battery anode materials.The two-year, C$2.2 million project aims to transform natural graphite processing by-products into high-performance, battery-grade anode material (BAM). Supported by the National Research Council of Canada Industrial Research Assistance Programme (NRC IRAP) and Germany’s Federal Ministry for Economic Affairs a..

Next Story
Infrastructure Urban

Antony Waste Q2 Revenue Jumps 16%; Subsidiary Wins Rs 3,200 Cr WtE Projects

Antony Waste Handling Cell Limited (AWHCL), a leading player in India’s municipal solid waste management sector, announced a 16 per cent year-on-year increase in total operating revenue to Rs 2.33 billion for Q2 FY26. The growth was driven by higher waste volumes, escalated contracts, and strong operational execution.EBITDA rose 18 per cent to Rs 570 million, with margins steady at 21.6 per cent, while profit after tax stood at Rs 173 million, up 13 per cent YoY. Revenue from Municipal Solid Waste Collection and Transportation (MSW C&T) reached Rs 1.605 billion, and MSW Processing re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement