Maharashtra CM Flags Off Trial Run on Mumbai Metro Line 4
AVIATION & AIRPORTS

Maharashtra CM Flags Off Trial Run on Mumbai Metro Line 4

Maharashtra chief minister Devendra Fadnavis flagged off the first trial run of Mumbai Metro Line 4, marking a significant milestone in the city’s expanding metro network. The corridor, spanning 32.3 km from Wadala to Kasarvadavali, will extend further under Line 4A up to Gaimukh, bringing the total length to 35.1 km with 32 stations.

The initial trial run was carried out on a 4.4 km priority stretch between Gaimukh and Vijay Garden, covering four stations. This section forms part of the first phase of the project, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA).

Metro Line 4 extends 35.2 km from Wadala to Kasarvadavali, with an estimated cost of Rs 145.49 billion. Line 4A, a 2.88 km extension from Kasarvadavali to Gaimukh, is expected to cost approximately Rs 9.49 billion. Together, these lines will improve mobility across several densely populated areas and offer seamless integration with existing and planned metro lines.

A potential interchange with the proposed Mumbai Metro Line 11 will further connect Wadala to CSMT, creating a unified 58-km elevated corridor — the longest of its kind in India.

Speaking on the occasion, Deputy Chief Minister Eknath Shinde said, “More than 172 years after the inauguration of the railway in Thane, the city is now being served by a modern metro system, which is a historic moment for Thane.” He added that the integrated 58-km corridor would significantly ease traffic congestion and enhance connectivity across the Mumbai Metropolitan Region.

The Mumbai Metro Line 4 project aims to provide sustainable, eco-friendly, and efficient transport solutions while reducing road congestion and improving daily commute times for millions of passengers.

News source: Metro Rail News


Maharashtra chief minister Devendra Fadnavis flagged off the first trial run of Mumbai Metro Line 4, marking a significant milestone in the city’s expanding metro network. The corridor, spanning 32.3 km from Wadala to Kasarvadavali, will extend further under Line 4A up to Gaimukh, bringing the total length to 35.1 km with 32 stations.The initial trial run was carried out on a 4.4 km priority stretch between Gaimukh and Vijay Garden, covering four stations. This section forms part of the first phase of the project, being implemented by the Mumbai Metropolitan Region Development Authority (MMRDA).Metro Line 4 extends 35.2 km from Wadala to Kasarvadavali, with an estimated cost of Rs 145.49 billion. Line 4A, a 2.88 km extension from Kasarvadavali to Gaimukh, is expected to cost approximately Rs 9.49 billion. Together, these lines will improve mobility across several densely populated areas and offer seamless integration with existing and planned metro lines.A potential interchange with the proposed Mumbai Metro Line 11 will further connect Wadala to CSMT, creating a unified 58-km elevated corridor — the longest of its kind in India.Speaking on the occasion, Deputy Chief Minister Eknath Shinde said, “More than 172 years after the inauguration of the railway in Thane, the city is now being served by a modern metro system, which is a historic moment for Thane.” He added that the integrated 58-km corridor would significantly ease traffic congestion and enhance connectivity across the Mumbai Metropolitan Region.The Mumbai Metro Line 4 project aims to provide sustainable, eco-friendly, and efficient transport solutions while reducing road congestion and improving daily commute times for millions of passengers.News source: Metro Rail News

Next Story
Infrastructure Energy

Coal Gasification Mission Aims for 100 MT by 2030, Says Union Minister

Union Coal and Mines Minister G Kishan Reddy announced that India’s Coal Gasification Mission is targeting 100 million tonnes by 2030, supported by an Rs 8,500 crore incentive scheme, as the country balances rising energy demand with sustainability goals.Speaking at the Energy Leadership Summit organised by the Economic Times, Reddy highlighted that India’s domestic coal production surpassed 1 billion tonnes in 2024-25 and is expected to reach 1.6 billion tonnes by 2030.“To meet growing energy demand sustainably, coal is being transformed into a driver of green growth,” Reddy said, add..

Next Story
Infrastructure Urban

Microsoft Partners with Stegra for Green Hydrogen Steel in Data Centres

Microsoft has signed a seven-year agreement with Swedish green hydrogen-based steel producer Stegra to use its steel in Microsoft’s data centres, marking a step toward reducing the company’s Scope 3 emissions.Under the deal, Microsoft will not purchase the steel directly. Instead, it will acquire Environmental Attribute Certificates (EACs), allowing the tech giant to account for lower indirect carbon emissions in its sustainability reporting.Suppliers of Microsoft’s data centre equipment will be encouraged to purchase Stegra’s steel at the same price as conventional blast furnace steel..

Next Story
Infrastructure Transport

Chennai Metro TBM ‘Flamingo’ Awaits CRS Nod

Chennai Metro Rail’s tunnel boring machine (TBM) Flamingo, currently drilling from Light House, will reach Thirumayilai MRTS station only after receiving approval from the Commissioner of Railway Safety (CRS), ensuring the safety of nearby structures.The Phase II project of Chennai Metro Rail includes three corridors: Madhavaram–SIPCOT (Corridor 3), Light House–Poonamallee (Corridor 4), and Madhavaram–Sholinganallur (Corridor 5). Several stations along these corridors intersect with suburban railway lines, MRTS stations, and Phase I metro lines. Thirumayilai is a key location where the..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?