A Feather  in the glory of Indian railways
RAILWAYS & METRO RAIL

A Feather in the glory of Indian railways

The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country.

The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur.

On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as "a feather in the glory of Indian railways" by former vice president M Venkaiah Naidu.

An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present.

Features of Longest Electrified Train Tunnel –
(a) The tunnel is ‘Horse Shoe’ shaped.
(b) New Australian Tunneling Method(NATM) was followed during construction.
(c) The LED lighting provided at a distance of 10 metres inside the tunnel.
(d) The height of the tunnel is 6.5 metres (rail level to roof).
(e) The height of contact wire is maintained at 5.2 metres.
(f) The thickness of the full length lining is 300 mm.

This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast.

The Railways are developing a plan to become the largest "Green Railways" in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23.

Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express.

See also:
Railways releases energy-efficiency plan to reach 2030 net-zero goal
India's first indigenous hydrogen train to be operational in 2023


The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country. The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur. On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as a feather in the glory of Indian railways by former vice president M Venkaiah Naidu. An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present. Features of Longest Electrified Train Tunnel – (a) The tunnel is ‘Horse Shoe’ shaped. (b) New Australian Tunneling Method(NATM) was followed during construction. (c) The LED lighting provided at a distance of 10 metres inside the tunnel. (d) The height of the tunnel is 6.5 metres (rail level to roof). (e) The height of contact wire is maintained at 5.2 metres. (f) The thickness of the full length lining is 300 mm. This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast. The Railways are developing a plan to become the largest Green Railways in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23. Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express. See also: Railways releases energy-efficiency plan to reach 2030 net-zero goalIndia's first indigenous hydrogen train to be operational in 2023

Next Story
Infrastructure Transport

Shivraj Chouhan Launches PMGSY IV and Announces Package for Madhya Pradesh

Union Minister Shivraj Singh Chouhan launched the Pradhan Mantri Gram Sadak Yojana (PMGSY) IV at Bhairunda in Sehore district during the 25 year celebrations and announced a development package for Madhya Pradesh. The programme was organised by the Union Ministry of Rural Development and attended by Chief Minister Dr Mohan Yadav, ministers of state, state ministers, legislators and senior officials from the centre and the state. The minister said the central government under the Prime Minister is committed to strengthening rural livelihoods through improved connectivity, housing and women's in..

Next Story
Infrastructure Urban

DMR Engineering Reports FY 25-26 Financial Results

DMR Engineering reported its half year results for the financial year ended 31 March 2026 and published full year figures on a standalone basis. Standalone revenue from operations decreased by 2.01 per cent year-over-year to Rs 102.58 million (mn), while profit after tax declined by 43.94 per cent to nine point five six mn, leaving a profit after tax margin of nine point zero five per cent. Earnings per share stood at Rs zero point nine two, a fall of 44.71 per cent year-over-year. The company attributed part of the decline to one-off provisioning for bad debts and additional financing charges..

Next Story
Infrastructure Urban

Atlanta Electricals Posts Strong FY26 Growth And Debt Free Finish

Atlanta Electricals reported audited consolidated results for the quarter and year ended 31 March 2026. The company recorded significant year-on-year revenue growth driven by capacity ramp-up at new facilities and higher utilisation at legacy plants. The announcement summarised operating improvements and strategic milestones achieved during the year. For Q4 the company reported revenue of Rs 7.48 bn and for FY26 revenue of Rs 18.52 bn, representing robust growth versus the prior year. EBITDA in Q4 was Rs. 1.49 bn and Rs. 3.44 bn for the full year, with margins expanding to 20 per cent in the q..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement