A Feather  in the glory of Indian railways
RAILWAYS & METRO RAIL

A Feather in the glory of Indian railways

The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country.

The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur.

On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as "a feather in the glory of Indian railways" by former vice president M Venkaiah Naidu.

An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present.

Features of Longest Electrified Train Tunnel –
(a) The tunnel is ‘Horse Shoe’ shaped.
(b) New Australian Tunneling Method(NATM) was followed during construction.
(c) The LED lighting provided at a distance of 10 metres inside the tunnel.
(d) The height of the tunnel is 6.5 metres (rail level to roof).
(e) The height of contact wire is maintained at 5.2 metres.
(f) The thickness of the full length lining is 300 mm.

This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast.

The Railways are developing a plan to become the largest "Green Railways" in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23.

Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express.

See also:
Railways releases energy-efficiency plan to reach 2030 net-zero goal
India's first indigenous hydrogen train to be operational in 2023


The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country. The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur. On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as a feather in the glory of Indian railways by former vice president M Venkaiah Naidu. An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present. Features of Longest Electrified Train Tunnel – (a) The tunnel is ‘Horse Shoe’ shaped. (b) New Australian Tunneling Method(NATM) was followed during construction. (c) The LED lighting provided at a distance of 10 metres inside the tunnel. (d) The height of the tunnel is 6.5 metres (rail level to roof). (e) The height of contact wire is maintained at 5.2 metres. (f) The thickness of the full length lining is 300 mm. This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast. The Railways are developing a plan to become the largest Green Railways in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23. Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express. See also: Railways releases energy-efficiency plan to reach 2030 net-zero goalIndia's first indigenous hydrogen train to be operational in 2023

Next Story
Infrastructure Urban

Mount Invests Rs 250 Cr, Adds PUF & PEB Plants, 400+ Jobs

TUMKUR, Karnataka, January 8, 2025 - Mount Roofing & Structures Private Limited, one of India's  fastest-growing manufacturers in PUF and a leading solutions provider across Pre-Engineered Building  (PEB) and Polycarbonate sheets, simultaneously inaugurated its second fully automated continuous  Sandwich Panel manufacturing line and a new PEB manufacturing plant at its integrated campus in  Tumkur." The milestone expansion, part of a total investment of INR 250 crores, marks a significant  advancement in the company's commitment to engineered performance, manu..

Next Story
Infrastructure Urban

Titan Intech Strengthens UltraLED Push With Global LED Veteran

Titan Intech has announced the induction of global LED industry veteran Su Piow Ko to its Board of Directors, marking a strategic step in strengthening its UltraLED Displays roadmap and building globally competitive LED display solutions from India.The appointment aligns with Titan Intech’s ambition to position India as a hub for advanced, high-quality LED display manufacturing. With an increased focus on UltraLED Displays, the company aims to enhance technical governance, raise manufacturing standards and expand its presence across global markets.Su Piow Ko brings over three decades of inte..

Next Story
Infrastructure Urban

Dun & Bradstreet Flags New Growth Engines in India 2026 Outlook

Dun & Bradstreet has released its India 2026: D&B’s Perspective report, projecting a stable macroeconomic environment underpinned by fresh opportunities for productivity-led and inclusive growth. The report outlines how India’s next growth phase will be driven by digitised logistics, trusted data ecosystems, clean energy and rising city vitality.According to the outlook, India’s GDP growth is expected to reach around 6.6 per cent by FY2027, supported by resilient consumer demand and sustained public investment. Manufacturing is seen entering a new phase, moving beyond scale towar..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App