A Feather  in the glory of Indian railways
RAILWAYS & METRO RAIL

A Feather in the glory of Indian railways

The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country.

The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur.

On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as "a feather in the glory of Indian railways" by former vice president M Venkaiah Naidu.

An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present.

Features of Longest Electrified Train Tunnel –
(a) The tunnel is ‘Horse Shoe’ shaped.
(b) New Australian Tunneling Method(NATM) was followed during construction.
(c) The LED lighting provided at a distance of 10 metres inside the tunnel.
(d) The height of the tunnel is 6.5 metres (rail level to roof).
(e) The height of contact wire is maintained at 5.2 metres.
(f) The thickness of the full length lining is 300 mm.

This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast.

The Railways are developing a plan to become the largest "Green Railways" in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23.

Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express.

See also:
Railways releases energy-efficiency plan to reach 2030 net-zero goal
India's first indigenous hydrogen train to be operational in 2023


The longest electrified tunnel in Indian Railways has changed the way that freight is transported throughout the nation significantly. In 2019, the tunnel connecting the Cherlopalli and Rapuru stations of South Central Railways was dedicated to the country. The 113 km long Obulavaripalli-Venkatachalam-Krishnapatnam Port railway line includes the 6.6 km long tunnel. The tunnel, a feat of engineering, has cut the distance for trains travelling from Krishnapatnam to Guntakal Division by 72 km. Additionally, it lessens traffic volume in the section between Obulavaripalli and Renigunta and Gudur. On June 25, 2019, the longest electrified tunnel in the country began full-scale operation. The tunnel was described as a feather in the glory of Indian railways by former vice president M Venkaiah Naidu. An estimated $437 billion was spent on the tunnel's construction. 14 Cross Passages and 44 Trolley Refuges are present. Features of Longest Electrified Train Tunnel – (a) The tunnel is ‘Horse Shoe’ shaped. (b) New Australian Tunneling Method(NATM) was followed during construction. (c) The LED lighting provided at a distance of 10 metres inside the tunnel. (d) The height of the tunnel is 6.5 metres (rail level to roof). (e) The height of contact wire is maintained at 5.2 metres. (f) The thickness of the full length lining is 300 mm. This tunnel improves the South Central Railway's freight capacity while enabling direct and practical connectivity between the South Coast and West Coast. The Railways are developing a plan to become the largest Green Railways in the world with zero carbon emissions by 2030. A total of 4,100 TKM were electrified during the Financial Year 2022–23. Prime Minister Narendra Modi stated last week that 20,000 route kilometres of rail lines were electrified in the first 70 years of Independence while introducing the nation's seventh Vande Bharat Express. See also: Railways releases energy-efficiency plan to reach 2030 net-zero goalIndia's first indigenous hydrogen train to be operational in 2023

Next Story
Infrastructure Urban

Panasonic Showcases Connected Display Solutions

Panasonic Life Solutions India showcased its integrated display, projection, broadcast and communication technologies at Panasonic Tech Summit 2026 in New Delhi. Hosted through its System Solutions Division, the two-day event highlighted connected technology solutions for education, healthcare, retail, transportation, corporate offices and entertainment.The summit, themed ‘Turning Technology into Value’, featured experience-led zones covering QSR, retail, transit, corporate offices, healthcare, education, security, projection, home theatre and professional displays. Panasonic also introduc..

Next Story
Infrastructure Transport

Kapsch to Deliver India’s First C-ITS Project

"Kapsch TrafficCom will deliver India’s first Cooperative Intelligent Transport Systems project on a key expressway near New Delhi. The project will be implemented with Superwave Communication And Infrasolution Limited to demonstrate how connected mobility can improve road safety and traffic efficiency.The pilot will use real-time connectivity and AI-enabled situational awareness to support road users, especially in high-risk areas such as temporary work zones. Drivers will receive alerts on roadworks, maintenance vehicles, hazardous locations, traffic queues and temporary virtual signage di..

Next Story
Infrastructure Urban

Eurobond Net Profit Rises 44 Per Cent

Euro Panel Products, the parent company of Eurobond, reported a 44.13 per cent year-on-year rise in net profit for FY25–26. The company’s revenue from operations grew 18.91 per cent to Rs 503.20 crore, compared to Rs 423.18 crore in the previous financial year.The company’s full-year EBITDA stood at Rs 56.67 crore, marking a 31.82 per cent increase. Profit after tax rose to Rs 26.56 crore, while net worth increased 20.15 per cent to Rs 160.07 crore. Earnings per share for the year stood at Rs 10.84.Divyam Rajesh Shah, Whole Time Director and CFO, Euro Panel Products, said the company’s..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->