Aqua Line of Noida Metro will include 8 stations
RAILWAYS & METRO RAIL

Aqua Line of Noida Metro will include 8 stations

Instead of five metro stations, the proposed Noida Metro's Aqua Line between Sector 142 and the Botanical Garden is expected to include eight. The Noida-Greater Noida Expressway's service roads will be followed by the metro line. The metro line will give the infrastructure a much-needed boost, directly benefiting people who travel to and from Delhi for work.

Following a recent meeting between NMRC and Greater Noida Authority representatives, it was decided to reduce the number of stations from 11 to 8. This has not yet been decided in its entirety.

In order to ensure that the greatest number of people can access the metro line, the Noida Authority and metro officials have developed a plan for station construction. They

To choose the site of the metro stations, they are consulting consultants.

There will be built footover bridges to improve accessibility. One FOB will link regions on the other side of the Noida-Greater Noida Expressway to the metro route. The opposite party will follow suit for the sectors on the opposing side. The metro line will be useful for the thousands of people that travel between Noida and Delhi from Greater Noida.

Sector 142, Sector 125, Sector 97, Sector 98, Sector 91, and Botanical Garden will all be connected by this route.

Also read:
L&T’s TBM Urja achieves third breakthrough of Bengaluru Pink Line
PM Modi to inaugurate Navi Mumbai Metro’s 5.96-km stretch


Instead of five metro stations, the proposed Noida Metro's Aqua Line between Sector 142 and the Botanical Garden is expected to include eight. The Noida-Greater Noida Expressway's service roads will be followed by the metro line. The metro line will give the infrastructure a much-needed boost, directly benefiting people who travel to and from Delhi for work. Following a recent meeting between NMRC and Greater Noida Authority representatives, it was decided to reduce the number of stations from 11 to 8. This has not yet been decided in its entirety. In order to ensure that the greatest number of people can access the metro line, the Noida Authority and metro officials have developed a plan for station construction. They To choose the site of the metro stations, they are consulting consultants. There will be built footover bridges to improve accessibility. One FOB will link regions on the other side of the Noida-Greater Noida Expressway to the metro route. The opposite party will follow suit for the sectors on the opposing side. The metro line will be useful for the thousands of people that travel between Noida and Delhi from Greater Noida. Sector 142, Sector 125, Sector 97, Sector 98, Sector 91, and Botanical Garden will all be connected by this route. Also read: L&T’s TBM Urja achieves third breakthrough of Bengaluru Pink Line PM Modi to inaugurate Navi Mumbai Metro’s 5.96-km stretch

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?