Adani Ports & SEZ to foray into West Bengal’s maritime sector
PORTS & SHIPPING

Adani Ports & SEZ to foray into West Bengal’s maritime sector

Adani Ports and Special Economic Zone (APSEZ) is set to make its foray into West Bengal’s maritime sector as the company has won the right to operate a berth at Haldia Dock Complex.

The company has won the right to operate a berth at Haldia Dock Complex as the highest bidder.

The scope of work includes providing end-to-end mechanisation at the berth, which must be completed within two years of the contract being awarded by the port authorities. The project will have an investment of Rs 300 crore.

The berth will be able to handle roughly 3.5 to 4 million tonnes of cargo per year. This could be Adani Group's foray into the port and shipping industry in the state and will strengthen the company's position in the industry.

Gujarat, Maharashtra, Goa, Kerala, Andhra Pradesh, Tamil Nadu, and Odisha are among the other seven maritime states where it has a presence.

Adani had emerged as the highest bidder for the end-to-end mechanisation of berth number 2 at Haldia, according to Vinit Kumar, Chairman of Shyama Prasad Mukherjee (SMP), Kolkata, which manages port operations at Kolkata and Haldia.

As per the tender terms, the concession will be granted for 30 years.

The project will be part of the National Infrastructure Pipeline, which will identify and develop opportunities in at least nine infrastructure verticals, including roads and bridges, railway tracks, and ports, among others.

Kumar added that Adani is also among a group of shortlisted bidders for a berth in the Calcutta Dock System.

The Adani Group has been steadily expanding its presence in Bengal. It operates an edible oil plant in Haldia under the Adani Wilmar banner. It has also won the right to distribute city gas in the Burdwan district in a joint venture with the Indian Oil Corporation.

The company's infrastructure arm has been awarded the contract to expand the Durgapur-Pulsit stretch of the national highway to six lanes.

Image Source

Also read: Andhra Pradesh Government nods Adani Ports’ bid to buy stake in Gangavaram Port

Adani Ports and Special Economic Zone (APSEZ) is set to make its foray into West Bengal’s maritime sector as the company has won the right to operate a berth at Haldia Dock Complex. The company has won the right to operate a berth at Haldia Dock Complex as the highest bidder. The scope of work includes providing end-to-end mechanisation at the berth, which must be completed within two years of the contract being awarded by the port authorities. The project will have an investment of Rs 300 crore. The berth will be able to handle roughly 3.5 to 4 million tonnes of cargo per year. This could be Adani Group's foray into the port and shipping industry in the state and will strengthen the company's position in the industry. Gujarat, Maharashtra, Goa, Kerala, Andhra Pradesh, Tamil Nadu, and Odisha are among the other seven maritime states where it has a presence. Adani had emerged as the highest bidder for the end-to-end mechanisation of berth number 2 at Haldia, according to Vinit Kumar, Chairman of Shyama Prasad Mukherjee (SMP), Kolkata, which manages port operations at Kolkata and Haldia. As per the tender terms, the concession will be granted for 30 years. The project will be part of the National Infrastructure Pipeline, which will identify and develop opportunities in at least nine infrastructure verticals, including roads and bridges, railway tracks, and ports, among others. Kumar added that Adani is also among a group of shortlisted bidders for a berth in the Calcutta Dock System. The Adani Group has been steadily expanding its presence in Bengal. It operates an edible oil plant in Haldia under the Adani Wilmar banner. It has also won the right to distribute city gas in the Burdwan district in a joint venture with the Indian Oil Corporation. The company's infrastructure arm has been awarded the contract to expand the Durgapur-Pulsit stretch of the national highway to six lanes. Image Source Also read: Andhra Pradesh Government nods Adani Ports’ bid to buy stake in Gangavaram Port

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->