Ports and shipping minister launches projects at New Mangalore Port
PORTS & SHIPPING

Ports and shipping minister launches projects at New Mangalore Port

Minister of Ports, Shipping and Waterways Sarbananda Sonowal inaugurated and laid the foundation stone for three projects at the New Mangalore Port.

He was accompanied by Nalin Kumar Kateel, MP, and Dr A V Ramana, Chairman of the New Mangalore Port Trust (NMPT). The projects include laying the groundwork for a truck parking terminal, modifying the US Mallya Gate, and dedicating the newly constructed business development centre to the nation.

Sonowal cited that an additional 17,000 square metre truck parking area will be built at a cost of Rs 1.9 crore. By 2022-23, a concrete pavement, a gatehouse, a restaurant, and a dormitory will be installed in the truck terminal at a cost of Rs 5 crore.

He said that the Mallya Gate in the United States will be modified for Rs 3.22 crore and is expected to be finished by March 2022. The Business Development Centre will provide all facilities to the EXIM trade community under one roof.

Container and other general cargo traffic are increasing at this Port, according to the Minister, due to improved hinterland connectivity.

Every day, nearly 500 trucks commute to and from the New Mangalore Port to transport cargo from the port to destinations outside of the Dakshina Kannada district and Karnataka State.

According to Dr A V Ramana, Chairman of the NMPT, the proposed modification of the East gate complex of the NMPT has dimensions of 46.6 m in length and 13.5 m in width.

The gated complex has separate lanes for trucks, four-wheeled passenger vehicles, two-wheelers, and pedestrians, as well as RFID systems, radiological monitoring equipment, boom barriers, and other amenities.

He asserted that the Business Development Centre and Testing Centre will be built on 2.80 acres on the western side of NH 66, next to the IOC retail outlet.

The Business Development Centre is a stilt, ground, three-story building with a total carpet area of 6,300 sq m and a 1,200 sq m test centre.

The Business Development Centre for Export and Testing Centre is estimated to cost Rs 24.57 crore to build. It also has a conference hall, post office, restaurant, and banks, among other amenities.

Image Source


Also read: Visakhapatnam Port Trust to ramp up cargo handling capacity

Minister of Ports, Shipping and Waterways Sarbananda Sonowal inaugurated and laid the foundation stone for three projects at the New Mangalore Port. He was accompanied by Nalin Kumar Kateel, MP, and Dr A V Ramana, Chairman of the New Mangalore Port Trust (NMPT). The projects include laying the groundwork for a truck parking terminal, modifying the US Mallya Gate, and dedicating the newly constructed business development centre to the nation. Sonowal cited that an additional 17,000 square metre truck parking area will be built at a cost of Rs 1.9 crore. By 2022-23, a concrete pavement, a gatehouse, a restaurant, and a dormitory will be installed in the truck terminal at a cost of Rs 5 crore. He said that the Mallya Gate in the United States will be modified for Rs 3.22 crore and is expected to be finished by March 2022. The Business Development Centre will provide all facilities to the EXIM trade community under one roof. Container and other general cargo traffic are increasing at this Port, according to the Minister, due to improved hinterland connectivity. Every day, nearly 500 trucks commute to and from the New Mangalore Port to transport cargo from the port to destinations outside of the Dakshina Kannada district and Karnataka State. According to Dr A V Ramana, Chairman of the NMPT, the proposed modification of the East gate complex of the NMPT has dimensions of 46.6 m in length and 13.5 m in width. The gated complex has separate lanes for trucks, four-wheeled passenger vehicles, two-wheelers, and pedestrians, as well as RFID systems, radiological monitoring equipment, boom barriers, and other amenities. He asserted that the Business Development Centre and Testing Centre will be built on 2.80 acres on the western side of NH 66, next to the IOC retail outlet. The Business Development Centre is a stilt, ground, three-story building with a total carpet area of 6,300 sq m and a 1,200 sq m test centre. The Business Development Centre for Export and Testing Centre is estimated to cost Rs 24.57 crore to build. It also has a conference hall, post office, restaurant, and banks, among other amenities.Image Source Also read: Visakhapatnam Port Trust to ramp up cargo handling capacity

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code