Indian Army Rolls Out First Overhauled ARV VT-72B with JCBL Group Partnership
DEFENSE

Indian Army Rolls Out First Overhauled ARV VT-72B with JCBL Group Partnership

The Indian Army has commissioned its first overhauled Armoured Recovery Vehicle (ARV) VT-72B from the 512 Army Base Workshop, Pune, with Airbornics Defence & Space (ADSL), a subsidiary of JCBL Group, as the sole industry partner. The project underscores successful industry–defence collaboration and advanced engineering support for India’s armed forces.

On September 17, 2025, the Indian Army flagged off its first overhauled ARV VT-72B, marking a significant milestone in defence modernisation. ADSL was responsible for overhauling the Utility Portion of the vehicle, including dismantling, replacing critical components, and repairing or substituting Major Unit Assemblies (MUAs). The company’s engineering team worked closely with Army personnel at 512 ABW to ensure precision, quality, and operational readiness at every stage.

Lt Gen Amardeep Singh Aujla, Master General Sustenance, lauded the Corps of EME for their exemplary work and acknowledged the contribution of JCBL Group and ADSL as the Army’s industry partner in the project.

Rishi Aggarwal, Managing Director, JCBL Group, said, “We are honoured to partner with the Indian Army for the overhaul of the VT-72B. This collaboration reflects our commitment to supporting India’s defence readiness with world-class engineering expertise and infrastructure.”

The ceremonial flag-off was attended by senior Indian Army leaders, including MGEME Southern Command, Lt Gen JS Sidana, Director General of the Corps of Electronics and Mechanical Engineers, Maj Gen Lalit Kapoor, Maj Gen PS Bindra, Commander Base Workshop Group, along with Sanjeev Babbar, Director, JCBL Group, and Col. Rajwinder Singh (Retd), COO, JCBL Group (ADSL).

The Indian Army has commissioned its first overhauled Armoured Recovery Vehicle (ARV) VT-72B from the 512 Army Base Workshop, Pune, with Airbornics Defence & Space (ADSL), a subsidiary of JCBL Group, as the sole industry partner. The project underscores successful industry–defence collaboration and advanced engineering support for India’s armed forces.On September 17, 2025, the Indian Army flagged off its first overhauled ARV VT-72B, marking a significant milestone in defence modernisation. ADSL was responsible for overhauling the Utility Portion of the vehicle, including dismantling, replacing critical components, and repairing or substituting Major Unit Assemblies (MUAs). The company’s engineering team worked closely with Army personnel at 512 ABW to ensure precision, quality, and operational readiness at every stage.Lt Gen Amardeep Singh Aujla, Master General Sustenance, lauded the Corps of EME for their exemplary work and acknowledged the contribution of JCBL Group and ADSL as the Army’s industry partner in the project.Rishi Aggarwal, Managing Director, JCBL Group, said, “We are honoured to partner with the Indian Army for the overhaul of the VT-72B. This collaboration reflects our commitment to supporting India’s defence readiness with world-class engineering expertise and infrastructure.”The ceremonial flag-off was attended by senior Indian Army leaders, including MGEME Southern Command, Lt Gen JS Sidana, Director General of the Corps of Electronics and Mechanical Engineers, Maj Gen Lalit Kapoor, Maj Gen PS Bindra, Commander Base Workshop Group, along with Sanjeev Babbar, Director, JCBL Group, and Col. Rajwinder Singh (Retd), COO, JCBL Group (ADSL).

Next Story
Infrastructure Urban

SCLR Extension Nears Completion Linking BKC With Signal-Free Route

The Santacruz-Chembur Link Road (SCLR) extension towards Bandra-Kurla Complex (BKC) via the Mumbai University campus has entered its final stage, bringing motorists closer to a direct, signal-free connection between the Western Express Highway and the city’s commercial district. The elevated connector is being built as an arm from the SCLR alignment and will link the western suburbs with BKC without surface signals. The link is designed to reduce journey times for commuters travelling from the western suburbs to BKC and to improve access to eastern Mumbai. By carrying through traffic above s..

Next Story
Infrastructure Transport

Raiganj MP Seeks Bengal Only Highway Link To Siliguri

Raiganj Member of Parliament Kartik Chandra Paul met Union Minister for Road Transport and Highways Nitin Gadkari in New Delhi to press for a new stretch of national highway in North Dinajpur district. He urged approval for a Bengal-to-Bengal link that would connect National Highways 12 and 27 to allow vehicles bound for Siliguri to avoid the current route through Kishanganj in neighbouring Bihar. He also submitted a proposed alignment of the new road to the ministry for consideration. At present vehicles from Raiganj travel along NH-12 and join NH-27 at Purnia More in Dalkhola, a route that p..

Next Story
Infrastructure Transport

Airport Kilambakkam Metro Line To Be Extended To Chengalpattu

Chennai Metro Rail (CMRL) has invited tenders for two detailed project reports that would extend its rail network to Chengalpattu in the south and extend Corridor-5 to Wimco Nagar in the north as part of a second wave of expansion beyond the operator's corridors under construction. The move signals an acceleration of planning for suburban links and interchange nodes. The larger of the two studies covers a roughly 27km extension from the planned Kilambakkam metro station to Chengalpattu under Corridor-1, Phase I. CMRL floated the tender at an estimated cost of Rs 21.6 mn. The proposed line woul..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement