Mahindra Logistics Leases 4.75 Lakh Sq Ft Space Rs 730 Mn
WAREHOUSING & LOGISTICS

Mahindra Logistics Leases 4.75 Lakh Sq Ft Space Rs 730 Mn

Mahindra Logistics Limited has leased 4.75 lakh sq ft of warehousing and logistics space in Khed near Pune for a rent of around Rs 730 million over five years, according to the property registration documents accessed by CRE Matrix. According to the documents, the 4.75 lakh sq ft of built-up space is located in Karanje Emerald Industrial Park in Khed, Pune.

The space was taken on rent from Karanje Emerald Logistics Park Pvt Ltd, for which the transaction was registered on January 20, 2025.

According to the documents, the security deposit for the transaction is Rs 34.5 billion, and a stamp duty of over Rs 18 lakh was paid along with a Rs 10 billion registration fee.

According to the documents, the monthly rent for the first 24 months is Rs 115 million, along with an annual escalation clause. The lock-in period for the transaction is five years.

The rent payment commencement date is April 3, 2025. While Karanji Emerald Logistics Park Pvt Ltd could not be reached for comment. Mahindra Logistics Limited (MLL) announced last year that it would invest Rs 1.7 billion in a warehousing facility in Phaltan, near Pune.

Mahindra Logistics Limited has leased 4.75 lakh sq ft of warehousing and logistics space in Khed near Pune for a rent of around Rs 730 million over five years, according to the property registration documents accessed by CRE Matrix. According to the documents, the 4.75 lakh sq ft of built-up space is located in Karanje Emerald Industrial Park in Khed, Pune.The space was taken on rent from Karanje Emerald Logistics Park Pvt Ltd, for which the transaction was registered on January 20, 2025.According to the documents, the security deposit for the transaction is Rs 34.5 billion, and a stamp duty of over Rs 18 lakh was paid along with a Rs 10 billion registration fee.According to the documents, the monthly rent for the first 24 months is Rs 115 million, along with an annual escalation clause. The lock-in period for the transaction is five years.The rent payment commencement date is April 3, 2025. While Karanji Emerald Logistics Park Pvt Ltd could not be reached for comment. Mahindra Logistics Limited (MLL) announced last year that it would invest Rs 1.7 billion in a warehousing facility in Phaltan, near Pune.

Next Story
Infrastructure Urban

Pune To Get AC Smart Toilets At Key Entry Points

Even as the Pune Municipal Corporation (PMC) grapples with the poor upkeep of 11 high-tech e-toilets installed under the Swachh Bharat Abhiyan, it has now approved a Rs 43.1 million plan to construct air-conditioned “smart toilets” at major city entry points and the Pune railway station. These new facilities will feature modern amenities such as WiFi and charging ports for mobiles and laptops—akin to those in shopping malls.The existing e-toilets, introduced at prominent spots like Jangli Maharaj Road, Model Colony, Bhandarkar Road, Senapati Bapat Road, Viman Nagar, and Taljai Tekdi, wer..

Next Story
Infrastructure Transport

Ganga Expressway Adopts AI for Real-Time Road Quality Checks

The Yogi Adityanath government has partnered with ETH Zurich and RTDT Laboratories AG to deploy artificial intelligence and sensor-based technology on the Ganga Expressway. This system enables real-time monitoring of construction quality, enhancing both safety and ride comfort.Spanning five hundred and ninety-four kilometres across twelve districts from Meerut to Prayagraj, the Ganga Expressway will be India’s longest. A specially designed Innova vehicle fitted with seven accelerometers now scans all six lanes for surface uniformity and elevation consistency.Unlike traditional methods conduc..

Next Story
Infrastructure Transport

Bihar Approves Rs 330 Billion Road Upgrade Plan for FY26

The Ministry of Road Transport and Highways has approved Bihar’s Rs 330 Bn road development plan for financial year twenty twenty-six. The announcement was made by Road Construction Minister Nitin Naveen, outlining projects aimed at boosting infrastructure and economic growth.Detailed Project Reports have been prepared for works worth Rs 180 to 190 Bn, with construction expected to begin before 15 August upon central approval. Around Rs 199.81 Bn will be spent to upgrade five hundred and twenty-six kilometres of roads to two-lane and four-lane highways.Eight major roads have been approved, i..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?