Centre Auctions Six Coal Blocks To Generate Nearly Rs 20 bn
COAL & MINING

Centre Auctions Six Coal Blocks To Generate Nearly Rs 20 bn

The Coal Ministry said it has auctioned six coal blocks under the fifteenth round and the second attempt of the thirteenth round of commercial coal mine auctions, launched in April and concluded in August through forward bidding. The mines together hold geological reserves of about 1,503.93 mn t and have a cumulative peak rated production capacity of 11.62 mn t per annum. Of the six blocks awarded, four are fully explored and two are partially explored, the ministry stated.

Among the successful bidders, The Singareni Collieries Company Limited secured the Dip Side Extension of the PKOC block in Telangana while Gallantt Ispat Limited won the Dongeri Tal-II block in Madhya Pradesh. Jharkhand Exploration and Mining Corporation Limited was the successful bidder for both the Margo West and Margo East blocks in Jharkhand, and CG Syn-Gas and Chemicals Limited won the Tara Revised block in Chhattisgarh. Qube Commercial Private Limited secured the Mandla South block in Madhya Pradesh.

The ministry indicated the newly auctioned blocks are expected to generate annual revenue of about Rs 19.83 billion (bn) for coal-bearing states, attract capital investment of nearly Rs 17.43 bn and create around 15,710 employment opportunities once operational. The Tara Revised coal block attracted the highest bid premium at 37.5 per cent, significantly above premiums for the other five mines. The auctions were launched on April seventeenth and concluded with forward bidding on August third and fourth.

The latest round advances the government commercial coal mining programme that began in 2020, bringing the total number of successfully auctioned blocks to 147. Those mines together have an annual production capacity of 377.974 mn t and are projected to generate annual revenue of Rs 482.15 bn, mobilise investments worth Rs 543.15 bn and create nearly 0.49 mn jobs after becoming operational. The ministry said the auctions have so far helped expand capacity and investment in the sector.

The Coal Ministry said it has auctioned six coal blocks under the fifteenth round and the second attempt of the thirteenth round of commercial coal mine auctions, launched in April and concluded in August through forward bidding. The mines together hold geological reserves of about 1,503.93 mn t and have a cumulative peak rated production capacity of 11.62 mn t per annum. Of the six blocks awarded, four are fully explored and two are partially explored, the ministry stated. Among the successful bidders, The Singareni Collieries Company Limited secured the Dip Side Extension of the PKOC block in Telangana while Gallantt Ispat Limited won the Dongeri Tal-II block in Madhya Pradesh. Jharkhand Exploration and Mining Corporation Limited was the successful bidder for both the Margo West and Margo East blocks in Jharkhand, and CG Syn-Gas and Chemicals Limited won the Tara Revised block in Chhattisgarh. Qube Commercial Private Limited secured the Mandla South block in Madhya Pradesh. The ministry indicated the newly auctioned blocks are expected to generate annual revenue of about Rs 19.83 billion (bn) for coal-bearing states, attract capital investment of nearly Rs 17.43 bn and create around 15,710 employment opportunities once operational. The Tara Revised coal block attracted the highest bid premium at 37.5 per cent, significantly above premiums for the other five mines. The auctions were launched on April seventeenth and concluded with forward bidding on August third and fourth. The latest round advances the government commercial coal mining programme that began in 2020, bringing the total number of successfully auctioned blocks to 147. Those mines together have an annual production capacity of 377.974 mn t and are projected to generate annual revenue of Rs 482.15 bn, mobilise investments worth Rs 543.15 bn and create nearly 0.49 mn jobs after becoming operational. The ministry said the auctions have so far helped expand capacity and investment in the sector.

Next Story
Real Estate

BXB Estates Sets AED 110 Million Jumeirah Golf Estates Record

BXB Estates has completed an AED 110 million residential transaction at Jumeirah Golf Estates, setting a new sales record for the prestigious Dubai residential community.Negotiated by Alfie Tabrez, Managing Partner of BXB Estates, the deal surpassed the previous record of AED 58 million for a completed ready villa in the development.The six-bedroom residence offers 21,714 sq ft of built-up space on a 15,873-sq-ft plot. It features nine bathrooms, four living lounges, a home office, bar lounge, private cinema and rooftop terrace.The property also includes a dedicated wellness area comprising a ..

Next Story
Infrastructure Urban

SECR Floats Rs 6,019 Mn EPC Tender For Paradol Nagpur Link

South East Central Railway (SECR) has invited bids for an Engineering, Procurement and Construction (EPC) contract to build a new broad gauge single line between Paradol Takeoff Point and Nagpur Road Station in Chhattisgarh. The contract carries an estimated cost of Rs 6,019.0 mn and requires an earnest money deposit of Rs 120.4 mn. The work is framed as an EPC assignment intended to strengthen regional rail infrastructure. The tender, issued under number CAO-C-BSP-26-27-15, specifies a completion period of 730 days and a bid validity of 180 days. Two pre-bid meetings are scheduled for 24 Augu..

Next Story
Infrastructure Transport

Indian Railways Reports Nine Per Cent Rise In July Freight Loading

Indian Railways handled 141.3 million tonnes (141.3 mn t) of freight in July, marking a rise of nine per cent year on year. Freight loading maintained a positive trajectory across the network compared with the same month last year. Passenger traffic also increased in July, contributing to higher overall network utilisation. The July outcome continued a pattern of steady monthly gains, reflecting gradual improvement in industrial and logistics activity. The growth in freight volumes reflected stronger demand across multiple sectors and improvements in logistics and train turnarounds. Enhanced r..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement