Adani plans world's largest hybrid energy plant in Gujarat
POWER & RENEWABLE ENERGY

Adani plans world's largest hybrid energy plant in Gujarat

Adani Group will build the world's largest hybrid power bank in the Khavda desert which is in Gujarat's Kutch district. Making this announcement, the company has reiterated its plan to create 45 GW of renewable energy capacity by 2030. When operational, the park will produce 20 GW of green energy.

Elaborating on the plans to build the hybrid power bank, Adani Group's Chairman said, "We are now building the largest hybrid renewables park in the world — right in the middle of the desert — in Khavda. It will be the most complex and ambitious project that we have ever executed."

The company intends to build the facility faster than any project in its execution history, Gautam Adani added. The project will be developed under Adani Green Energy Limited (AGEL).

Adani Group will build the world's largest hybrid power bank in the Khavda desert which is in Gujarat's Kutch district. Making this announcement, the company has reiterated its plan to create 45 GW of renewable energy capacity by 2030. When operational, the park will produce 20 GW of green energy.Elaborating on the plans to build the hybrid power bank, Adani Group's Chairman said, We are now building the largest hybrid renewables park in the world — right in the middle of the desert — in Khavda. It will be the most complex and ambitious project that we have ever executed.The company intends to build the facility faster than any project in its execution history, Gautam Adani added. The project will be developed under Adani Green Energy Limited (AGEL).

Next Story
Infrastructure Energy

Sigenergy Launches AI Agent for Renewable Energy

Sigenergy has introduced SigenAgent, an all-domain AI agent designed for the renewable energy industry. Unveiled at the company’s ‘AI in All’ event, the system aims to turn solar and storage hardware into autonomous, goal-driven energy systems for homes and businesses.SigenAgent works through a continuous cycle of perception, reasoning and action. It analyses real-time factors such as weather conditions, electricity prices and grid status to automatically determine the most efficient operating path. Users can set broader goals such as lowering energy bills or securing backup power, while..

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->