Adani Power Wins Rs 20 Billion Project to Supply 1,500 MW to UP
POWER & RENEWABLE ENERGY

Adani Power Wins Rs 20 Billion Project to Supply 1,500 MW to UP

Adani Power Limited has secured a project worth Rs 20 Bn to supply 1,500 megawatts of thermal power to Uttar Pradesh, emerging as the lowest bidder in a competitive tender. The power will be delivered at a levelised tariff of Rs 5.383 per unit.

The supply will come from a greenfield ultra-supercritical thermal power plant with a two-by-eight hundred megawatt configuration, resulting in 1,500 megawatts of net capacity. The facility will be established in the state under the Design, Build, Finance, Own, and Operate (DBFOO) model.

The project, approved earlier this month by the Uttar Pradesh cabinet, involves an estimated investment of approximately Rs 166 Bn ($2 Bn). Adani Power is expected to sign a long-term Power Supply Agreement with Uttar Pradesh Power Corporation Limited.

Construction is projected to create direct and indirect employment for eight thousand to nine thousand people, with around two thousand permanent roles post-completion. The plant is expected to begin supplying power by financial year twenty thirty.

This marks Adani Power’s second major win in the past year, following a composite 6,600 megawatt award in Maharashtra, which has since been converted into a Power Supply Agreement.

Source:CNBC-TV18

Adani Power Limited has secured a project worth Rs 20 Bn to supply 1,500 megawatts of thermal power to Uttar Pradesh, emerging as the lowest bidder in a competitive tender. The power will be delivered at a levelised tariff of Rs 5.383 per unit.The supply will come from a greenfield ultra-supercritical thermal power plant with a two-by-eight hundred megawatt configuration, resulting in 1,500 megawatts of net capacity. The facility will be established in the state under the Design, Build, Finance, Own, and Operate (DBFOO) model.The project, approved earlier this month by the Uttar Pradesh cabinet, involves an estimated investment of approximately Rs 166 Bn ($2 Bn). Adani Power is expected to sign a long-term Power Supply Agreement with Uttar Pradesh Power Corporation Limited.Construction is projected to create direct and indirect employment for eight thousand to nine thousand people, with around two thousand permanent roles post-completion. The plant is expected to begin supplying power by financial year twenty thirty.This marks Adani Power’s second major win in the past year, following a composite 6,600 megawatt award in Maharashtra, which has since been converted into a Power Supply Agreement.Source:CNBC-TV18

Next Story
Real Estate

BXB Estates Sets AED 110 Million Jumeirah Golf Estates Record

BXB Estates has completed an AED 110 million residential transaction at Jumeirah Golf Estates, setting a new sales record for the prestigious Dubai residential community.Negotiated by Alfie Tabrez, Managing Partner of BXB Estates, the deal surpassed the previous record of AED 58 million for a completed ready villa in the development.The six-bedroom residence offers 21,714 sq ft of built-up space on a 15,873-sq-ft plot. It features nine bathrooms, four living lounges, a home office, bar lounge, private cinema and rooftop terrace.The property also includes a dedicated wellness area comprising a ..

Next Story
Infrastructure Urban

SECR Floats Rs 6,019 Mn EPC Tender For Paradol Nagpur Link

South East Central Railway (SECR) has invited bids for an Engineering, Procurement and Construction (EPC) contract to build a new broad gauge single line between Paradol Takeoff Point and Nagpur Road Station in Chhattisgarh. The contract carries an estimated cost of Rs 6,019.0 mn and requires an earnest money deposit of Rs 120.4 mn. The work is framed as an EPC assignment intended to strengthen regional rail infrastructure. The tender, issued under number CAO-C-BSP-26-27-15, specifies a completion period of 730 days and a bid validity of 180 days. Two pre-bid meetings are scheduled for 24 Augu..

Next Story
Infrastructure Transport

Indian Railways Reports Nine Per Cent Rise In July Freight Loading

Indian Railways handled 141.3 million tonnes (141.3 mn t) of freight in July, marking a rise of nine per cent year on year. Freight loading maintained a positive trajectory across the network compared with the same month last year. Passenger traffic also increased in July, contributing to higher overall network utilisation. The July outcome continued a pattern of steady monthly gains, reflecting gradual improvement in industrial and logistics activity. The growth in freight volumes reflected stronger demand across multiple sectors and improvements in logistics and train turnarounds. Enhanced r..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement