Amara Raja bags order to set up green hydrogen fueling station
POWER & RENEWABLE ENERGY

Amara Raja bags order to set up green hydrogen fueling station

National Thermal Power Corporation Limited (NTPC) has awarded a green hydrogen project to Amara Raja Power Systems to set up India's first green hydrogen fueling station in Leh, Ladakh.

The company said that the project aims at introducing emission-free transport in and around Leh with a plan to test five hydrogen fuel cell buses in the entire region.

This pilot project will generate nearly 80 kg daily of 99.97% pure hydrogen, which will be compressed, stored, and dispensed. Here, green hydrogen is formed by splitting water into hydrogen and oxygen through the process of electrolysis powered by electricity generated by renewable energy sources.

NTPC Renewable Energy will be responsible for installing a dedicated 1.25 MW solar power plant to power the newly proposed hydrogen fueling station.

Amara Raja Power Systems is undertaking complete engineering, procurement and construction (EPC) project to set up a standalone green hydrogen fuel station, including parking spaces, a control room, amenities, fuel storage and dispensing system.

The company has undertaken operations and maintenance (O&M) activities for three years from the proposed date of project commissioning.

The company told the media that the pilot project would be set up in extreme conditions at 3,600 m height above sea level with a temperature variation of -14 degrees to +20 degrees C.

The project is part of India’s National Hydrogen Energy Mission and will be a precursor to large-scale green hydrogen mobility and storage projects. The project will be valuable for studying and deploying multiple fueling stations across the country.

Image Source

Also read: Electrolyser PLI to boost green hydrogen output

National Thermal Power Corporation Limited (NTPC) has awarded a green hydrogen project to Amara Raja Power Systems to set up India's first green hydrogen fueling station in Leh, Ladakh. The company said that the project aims at introducing emission-free transport in and around Leh with a plan to test five hydrogen fuel cell buses in the entire region. This pilot project will generate nearly 80 kg daily of 99.97% pure hydrogen, which will be compressed, stored, and dispensed. Here, green hydrogen is formed by splitting water into hydrogen and oxygen through the process of electrolysis powered by electricity generated by renewable energy sources. NTPC Renewable Energy will be responsible for installing a dedicated 1.25 MW solar power plant to power the newly proposed hydrogen fueling station. Amara Raja Power Systems is undertaking complete engineering, procurement and construction (EPC) project to set up a standalone green hydrogen fuel station, including parking spaces, a control room, amenities, fuel storage and dispensing system. The company has undertaken operations and maintenance (O&M) activities for three years from the proposed date of project commissioning. The company told the media that the pilot project would be set up in extreme conditions at 3,600 m height above sea level with a temperature variation of -14 degrees to +20 degrees C. The project is part of India’s National Hydrogen Energy Mission and will be a precursor to large-scale green hydrogen mobility and storage projects. The project will be valuable for studying and deploying multiple fueling stations across the country. Image Source Also read: Electrolyser PLI to boost green hydrogen output

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->