Eastern Power Distribution Company Of A.P Limited has released a tender for Design, Supply and Installation of UG Cabling and Covered Conductor works in Disaster Prone areas under EPC mode.

The tender seeks electrical works worth Rs 8,25,61,99,432 crore to be completed in 24 months. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on April 12, 2023 and will end on April 26, 2023.

Detailed scope of work-
Design, Supply and Installation of UG Cabling and Covered Conductor works in Disaster Prone areas of Srikakulam, Vizianagaram, Visakhapatnam, Rajamahendravaram & Eluru Circles of Eastern Power Distribution Company of Andhra Pradesh Limited under Loss Reduction Distribution Infrastructure works on Partial Turn Key Basis (RMUs will be supplied by APEPDCL) under Revamped Distribution Sector Scheme (RDSS) Revamped Distribution Sector Scheme (RDSS).

The work is to be executed on turnkey basis, the scope of which includes survey, network design, supply, manufacturer’s quality assurance, testing (where specified/ required), transportation, storage, erection, including all civil/ structural works, site testing, commissioning of all items & materials including all associated activities though not exclusively specified herein and are required for the completion and satisfactory performance of the entire works as intended.

As per the schedule the bidder shall submit a preliminary implementation plan along with the bid.

The complete BID document can be viewed and downloaded from the e-procurement portal at https://tender.apeprocurement.gov.in/login.html

Essential details:

Project Estimated Value: ₹ 8,25,61,99,432
Product Category: Electrical Works
Form of Contract: Tender
Bid Validity (Days): 120
Period of Work: 24 Months
Tender ID - 608498
Tender Ref. No.: RFB No.CGM/Projects /APEPDCL/RDSS-UGC Works/01/2023-24
Payment mode: Online Payment,Challan Generation,BG

Eastern Power Distribution Company Of A.P Limited has released a tender for Design, Supply and Installation of UG Cabling and Covered Conductor works in Disaster Prone areas under EPC mode. The tender seeks electrical works worth Rs 8,25,61,99,432 crore to be completed in 24 months. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on April 12, 2023 and will end on April 26, 2023. Detailed scope of work- Design, Supply and Installation of UG Cabling and Covered Conductor works in Disaster Prone areas of Srikakulam, Vizianagaram, Visakhapatnam, Rajamahendravaram & Eluru Circles of Eastern Power Distribution Company of Andhra Pradesh Limited under Loss Reduction Distribution Infrastructure works on Partial Turn Key Basis (RMUs will be supplied by APEPDCL) under Revamped Distribution Sector Scheme (RDSS) Revamped Distribution Sector Scheme (RDSS). The work is to be executed on turnkey basis, the scope of which includes survey, network design, supply, manufacturer’s quality assurance, testing (where specified/ required), transportation, storage, erection, including all civil/ structural works, site testing, commissioning of all items & materials including all associated activities though not exclusively specified herein and are required for the completion and satisfactory performance of the entire works as intended. As per the schedule the bidder shall submit a preliminary implementation plan along with the bid. The complete BID document can be viewed and downloaded from the e-procurement portal at https://tender.apeprocurement.gov.in/login.html Essential details: Project Estimated Value: ₹ 8,25,61,99,432 Product Category: Electrical Works Form of Contract: Tender Bid Validity (Days): 120 Period of Work: 24 Months Tender ID - 608498 Tender Ref. No.: RFB No.CGM/Projects /APEPDCL/RDSS-UGC Works/01/2023-24 Payment mode: Online Payment,Challan Generation,BG

Next Story
Infrastructure Urban

TBO Tek Q2 Profit Climbs 12%, Revenue Surges 26% YoY

TBO Tek Limited one of the world’s largest travel distribution platforms, reported a solid performance for Q2 FY26 with a 26 per cent year-on-year increase in revenue to Rs 5.68 billion, reflecting broad-based growth and improving profitability.The company recorded a Gross Transaction Value (GTV) of Rs 8,901 crore, up 12 per cent YoY, driven by strong performance across Europe, MEA, and APAC regions. Adjusted EBITDA before acquisition-related costs stood at Rs 1.04 billion, up 16 per cent YoY, translating into an 18.32 per cent margin compared to 16.56 per cent in Q1 FY26. Profit after tax r..

Next Story
Infrastructure Energy

Northern Graphite, Rain Carbon Secure R&D Grant for Greener Battery Materials

Northern Graphite Corporation and Rain Carbon Canada Inc, a subsidiary of Rain Carbon Inc, have jointly received up to C$860,000 (€530,000) in funding under the Canada–Germany Collaborative Industrial Research and Development Programme to develop sustainable battery anode materials.The two-year, C$2.2 million project aims to transform natural graphite processing by-products into high-performance, battery-grade anode material (BAM). Supported by the National Research Council of Canada Industrial Research Assistance Programme (NRC IRAP) and Germany’s Federal Ministry for Economic Affairs a..

Next Story
Infrastructure Urban

Antony Waste Q2 Revenue Jumps 16%; Subsidiary Wins Rs 3,200 Cr WtE Projects

Antony Waste Handling Cell Limited (AWHCL), a leading player in India’s municipal solid waste management sector, announced a 16 per cent year-on-year increase in total operating revenue to Rs 2.33 billion for Q2 FY26. The growth was driven by higher waste volumes, escalated contracts, and strong operational execution.EBITDA rose 18 per cent to Rs 570 million, with margins steady at 21.6 per cent, while profit after tax stood at Rs 173 million, up 13 per cent YoY. Revenue from Municipal Solid Waste Collection and Transportation (MSW C&T) reached Rs 1.605 billion, and MSW Processing re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement