+
BPCL Invites Bids For One MW Solar Project At Sanghvi Pumping Station
POWER & RENEWABLE ENERGY

BPCL Invites Bids For One MW Solar Project At Sanghvi Pumping Station

Bharat Petroleum Corporation Limited (BPCL) has invited open tenders for the construction of one megawatt (MW) solar power project at the Sanghvi Pumping Station. Mecon Limited is managing the tender process on behalf of BPCL under the Works category for the Exploration and Production, Pipeline Projects department. The project forms part of capacity augmentation work for the Manmad-Mangalia pipeline section under the MMBPL pipeline project. The notice was published on August 4, 2026, with downloads starting later that evening.\n\nBidders are not required to pay any tender fee to access or download bid documents, though an earnest money deposit (EMD) of Rs 0.5 mn is required as part of the submission. The tender reference is 1000450003_MECDEL. BPCL has set August 25, 2026 at 2:00 PM as the final deadline for downloading documents and submitting technical and financial bids, and technical bids are scheduled to be opened at 3:00 PM on the same day. The procurement has been issued for work located in Mumbai.\n\nEligible contractors and engineering firms with prior experience in similar infrastructure and solar projects are expected to participate in the competitive bidding process. Interested parties must submit proposals through the official online procurement portal and ensure compliance with the eligibility criteria set out in the tender documents. The scope includes design, supply, installation and commissioning for the Sanghvi site and bidders are advised to review technical specifications carefully. The process is being administered by Mecon to ensure technical and commercial compliance.\n\nThe project is expected to strengthen BPCL’s renewable energy portfolio while supporting cleaner operations across its pipeline infrastructure and aligns with broader public sector adoption of solar power to reduce carbon emissions and improve long term operational sustainability. This tender follows similar moves by state and central entities to incorporate renewables into energy intensive assets. Prospective bidders can access full tender documents and submit technical and financial proposals before the closing date to be considered. The company has provided contact and portal details in the official notice for procedural queries.

Bharat Petroleum Corporation Limited (BPCL) has invited open tenders for the construction of one megawatt (MW) solar power project at the Sanghvi Pumping Station. Mecon Limited is managing the tender process on behalf of BPCL under the Works category for the Exploration and Production, Pipeline Projects department. The project forms part of capacity augmentation work for the Manmad-Mangalia pipeline section under the MMBPL pipeline project. The notice was published on August 4, 2026, with downloads starting later that evening.\n\nBidders are not required to pay any tender fee to access or download bid documents, though an earnest money deposit (EMD) of Rs 0.5 mn is required as part of the submission. The tender reference is 1000450003_MECDEL. BPCL has set August 25, 2026 at 2:00 PM as the final deadline for downloading documents and submitting technical and financial bids, and technical bids are scheduled to be opened at 3:00 PM on the same day. The procurement has been issued for work located in Mumbai.\n\nEligible contractors and engineering firms with prior experience in similar infrastructure and solar projects are expected to participate in the competitive bidding process. Interested parties must submit proposals through the official online procurement portal and ensure compliance with the eligibility criteria set out in the tender documents. The scope includes design, supply, installation and commissioning for the Sanghvi site and bidders are advised to review technical specifications carefully. The process is being administered by Mecon to ensure technical and commercial compliance.\n\nThe project is expected to strengthen BPCL’s renewable energy portfolio while supporting cleaner operations across its pipeline infrastructure and aligns with broader public sector adoption of solar power to reduce carbon emissions and improve long term operational sustainability. This tender follows similar moves by state and central entities to incorporate renewables into energy intensive assets. Prospective bidders can access full tender documents and submit technical and financial proposals before the closing date to be considered. The company has provided contact and portal details in the official notice for procedural queries.

Related Stories

Gold Stories

Next Story
Equipment

ELGi Showcases Portable Air Solutions at bauma CONEXPO India

Elgi Equipments is showcasing its range of portable compressed air solutions for construction, mining and infrastructure applications at bauma CONEXPO India 2026, being held at the India Expo Centre, Greater Noida.Under the theme ‘Engineering Sustainable Performance Worldwide’, ELGi is presenting equipment designed to support productivity, reliability, operating efficiency and uptime across demanding mining, quarrying, drilling and construction environments.The portfolio on display includes the PG 90E electric portable compressor, developed for crawler drilling applications across granite,..

Next Story
Infrastructure Urban

DDA Holds Consultations on MPD 2047 Implementation

The Delhi Development Authority (DDA) held its second and third stakeholder consultations on Thursday on implementing the Master Plan for Delhi (MPD) 2047. The meetings brought together government agencies, civic bodies and heritage conservation organisations to discuss coordination and the practical implementation of the plan. The consultations were conducted in line with directions from Delhi Lieutenant Governor Taranjit Singh Sandhu. The DDA said its focus was on ensuring that MPD 2047 provisions are translated into tangible benefits for residents across the capital. The discussions were in..

Next Story
Building Material

Tata Steel Commissions India’s First Coke Oven Gas Injection Project

Tata Steel has commissioned India’s first coke oven gas (COG) injection project at its Meramandali steel plant in Odisha’s Dhenkanal district. The initiative is intended to reduce fossil-fuel consumption and carbon emissions from conventional blast-furnace ironmaking while improving the use of gases generated within the integrated steel plant. COG is a hydrogen- and hydrocarbon-rich byproduct of coke production. It contains more than 55 per cent hydrogen and methane and is typically used for power generation, heating or flaring. Under the new project, the gas is cleaned to remove harmful t..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code