Cop28 tripling renewable capacity pledge aims 11,000 gw of green power
POWER & RENEWABLE ENERGY

Cop28 tripling renewable capacity pledge aims 11,000 gw of green power

Tripling global renewable energy capacity by 2030, as pledged in COP28, poses a significant challenge, according to the International Energy Agency (IEA). Despite impressive progress, with global renewable capacity additions reaching nearly 560 GW in 2023, a 64% increase from 2022, the world remains 30% short of the target of 11,000 GW.

Only 14 out of 194 Nationally Determined Contributions (NDCs) explicitly mention targets for total renewable power capacity by 2030, with China alone contributing over 90% of the mentioned capacity. While China leads in renewable capacity installations, adding almost 350 GW in 2023, other countries must accelerate their annual growth by 36% to meet national aspirations.

India plays a crucial role, aiming for 500 GW of non-fossil fuel capacity, including 485 GW of renewables, by 2030. To achieve this, India focuses on developing hybrid renewable power projects, large auction volumes, and repowering existing wind farms. Advanced economies are expected to double their renewable capacity by 2030, with the Asia-Pacific region contributing 15% to the global total.

To meet ambitious goals, well-designed policies are essential, including streamlining permitting processes, accelerating integration of variable renewables, and reducing financing costs. The COP28 pledge is a significant step towards sustainability, but achieving it requires concerted efforts, technological advancements, and increased annual investments in clean energy.

According to the IEA and International Finance Corporation, annual investments in clean energy must triple from $770 billion in 2022 to approximately $2.2-2.8 trillion per year by early 2030 to meet energy demand while aligning with the Paris Agreement goals.

(Source: Mercom)

Tripling global renewable energy capacity by 2030, as pledged in COP28, poses a significant challenge, according to the International Energy Agency (IEA). Despite impressive progress, with global renewable capacity additions reaching nearly 560 GW in 2023, a 64% increase from 2022, the world remains 30% short of the target of 11,000 GW. Only 14 out of 194 Nationally Determined Contributions (NDCs) explicitly mention targets for total renewable power capacity by 2030, with China alone contributing over 90% of the mentioned capacity. While China leads in renewable capacity installations, adding almost 350 GW in 2023, other countries must accelerate their annual growth by 36% to meet national aspirations. India plays a crucial role, aiming for 500 GW of non-fossil fuel capacity, including 485 GW of renewables, by 2030. To achieve this, India focuses on developing hybrid renewable power projects, large auction volumes, and repowering existing wind farms. Advanced economies are expected to double their renewable capacity by 2030, with the Asia-Pacific region contributing 15% to the global total. To meet ambitious goals, well-designed policies are essential, including streamlining permitting processes, accelerating integration of variable renewables, and reducing financing costs. The COP28 pledge is a significant step towards sustainability, but achieving it requires concerted efforts, technological advancements, and increased annual investments in clean energy. According to the IEA and International Finance Corporation, annual investments in clean energy must triple from $770 billion in 2022 to approximately $2.2-2.8 trillion per year by early 2030 to meet energy demand while aligning with the Paris Agreement goals. (Source: Mercom)

Next Story
Infrastructure Energy

J&K CM Rules Out Power Privatisation, Focuses on Sector Reform

Jammu and Kashmir Chief Minister Omar Abdullah has dismissed speculation regarding privatisation of electricity in the Union Territory, emphasising that his priority is to strengthen and reform the power sector.“We are not discussing privatisation. By reducing losses, improving billing efficiency, and enhancing revenue, there will be no need for it. My vision is to strengthen and reform the power sector in J&K,” Abdullah stated.He addressed the gathering at the 58th Engineers’ Day at SKICC on Monday evening, an event honouring Bharat Ratna Sir M Visvesvaraya for his pioneering contri..

Next Story
Infrastructure Urban

Mumbai’s Sassoon Dock to Get Tech-Driven Modernisation with Finland

The Maharashtra government, in collaboration with Finland, will modernise Mumbai’s historic Sassoon Dock using advanced technology, state minister Nitesh Rane announced on Wednesday.Rane met a delegation of Finnish officials and representatives of Finnish companies at the dock to discuss strategic plans for upgrading the facility in south Mumbai, according to an official statement.Built in the 19th century, Sassoon Dock is one of Mumbai’s oldest and busiest fishing harbours. Operations currently exceed its original capacity, raising concerns over hygiene, odour, fish handling standards, an..

Next Story
Infrastructure Energy

Agarwal Industrial Wins Rs 3.3 Billion IOCL Bitumen Tender

Agarwal Industrial Corporation rose 3.84 per cent to Rs 945.65 after announcing it had secured a prestigious tender from Indian Oil Corporation (IOCL) worth Rs 3.3 billion.In a regulatory filing during market hours, the company confirmed it had won the tender to supply Bulk Bitumen (VG-30 and VG-40 grades) to IOCL’s Kakinada locations.The firm quantity under the award totals around 60,500 tonnes across 11 parcels, while the optional quantity is approximately 33,000 tonnes across six parcels. This brings the total awarded quantity to roughly 93,500 tonnes. At current market prices, the firm o..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?