Development Of Distribution Infrastructure At Ri Bhoi Of Meghalaya
POWER & RENEWABLE ENERGY

Development Of Distribution Infrastructure At Ri Bhoi Of Meghalaya

Meghalaya Power Distribution Corporation Limited (hereinafter also referred to as the Employer Or the MePDCL) invites online Bids for Development of Distribution Infrastructure at Ri-Bhoi in Meghalaya under Revamped Reforms-based and Results- linked. 2. Bidding will be conducted through national open competitive e-procurement.

The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the following works in the Ri-Bhoi which inter-alia include :

Loss Reduction

  • Reconductoring works,
  • Cabling in natural disaster prone areas,
  • HVDS
  • The tender seeks electrical works worth roughly Rs 1,33,58,51,000 crore to be completed in 540 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period will start on May 7, 2023 and will end on May 12, 2023.

    The complete BID document can be viewed and downloaded from the e-procurement portal of NHAI at https://meghalayatenders.gov.in/nicgep/app

    Essential details:

    Project Estimated Value: ₹ 1,33,58,51,000
    Product Category: Electrical works
    Bid Validity (Days): 120
    Period of Work: 540 days
    Tender ID - 2023_MeECL_1394_1
    Tender Ref. No.:CEP/T-226RDSSLR/22-23/75/
    Payment mode: Offline
    Form of contract: Turn-key

    Meghalaya Power Distribution Corporation Limited (hereinafter also referred to as the Employer Or the MePDCL) invites online Bids for Development of Distribution Infrastructure at Ri-Bhoi in Meghalaya under Revamped Reforms-based and Results- linked. 2. Bidding will be conducted through national open competitive e-procurement. The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material required to complete the following works in the Ri-Bhoi which inter-alia include : Loss Reduction Reconductoring works, Cabling in natural disaster prone areas, HVDS The tender seeks electrical works worth roughly Rs 1,33,58,51,000 crore to be completed in 540 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period will start on May 7, 2023 and will end on May 12, 2023. The complete BID document can be viewed and downloaded from the e-procurement portal of NHAI at https://meghalayatenders.gov.in/nicgep/app Essential details: Project Estimated Value: ₹ 1,33,58,51,000 Product Category: Electrical works Bid Validity (Days): 120 Period of Work: 540 days Tender ID - 2023_MeECL_1394_1 Tender Ref. No.:CEP/T-226RDSSLR/22-23/75/ Payment mode: Offline Form of contract: Turn-key

    Next Story
    Infrastructure Transport

    JNPA Becomes First Indian Port to Cross 10 Million TEU Capacity

    The Jawaharlal Nehru Port Authority (JNPA), located at Uran in Navi Mumbai, has become the first port in India to achieve over 10 million TEUs (twenty-foot equivalent units) in container handling capacity.With the recent expansion, the port now operates five container terminals with a combined capacity of 10.4 million TEUs, alongside two liquid and two general cargo terminals.Handling more than half of India’s container traffic, JNPA processed 7.05 million TEUs in 2024 and has moved 15.39 million tonnes of containers and 16.64 million tonnes of total cargo in the first two months of FY 2025â..

    Next Story
    Infrastructure Transport

    Nod for Rs. 36.26 billion Expansion of Pune Metro Line 2

    The Union Cabinet has approved the Rs.36.26 billion expansion of Pune Metro Line 2, adding 12.75 km of track and 13 new stations to improve east–west connectivity across the city.The project aims to link Pune’s urban core with rapidly growing suburbs, supporting the city’s rising demand for efficient and sustainable transport solutions. This expansion is part of Corridor 2 of the Pune Metro and includes two key routes: Vanaz to Chandani Chowk (Corridor 2A) and Ramwadi to Wagholi/Vitthalwadi (Corridor 2B).It will connect residential, IT, and educational hubs in areas such as Bavdhan, Koth..

    Next Story
    Infrastructure Transport

    Assembly begins for ‘Nayak’ TBM on Thane– Borivali Twin Tunnel Project

    The assembly of ‘Nayak’, the first of four Tunnel Boring Machines (TBMs) for the Thane–Borivali Twin Tube Tunnel Project, has commenced at the Thane site. Built by German firm Herrenknecht AG and deployed by Megha Engineering & Infrastructure (MEIL), the TBM marks a key milestone in Mumbai’s ambitious 11.8-km underground road corridor beneath Sanjay Gandhi National Park.The twin tunnels will reduce the Thane–Borivali travel distance by 12 km and decongest Thane Ghodbunder Road. ‘Nayak’, with a 13.2-metre diameter, is designed to bore through challenging geological conditions ..

    Advertisement

    Advertisement

    Subscribe to Our Newsletter

    Get daily newsletters around different themes from Construction world.

    STAY CONNECTED

    Advertisement

    Advertisement

    Advertisement

    Advertisement

    Talk to us?