+
EAC-PM Urges India to Boost Grid-Scale Battery Storage
POWER & RENEWABLE ENERGY

EAC-PM Urges India to Boost Grid-Scale Battery Storage

The Economic Advisory Council to the Prime Minister (EAC-PM) has said India must scale up its grid-scale battery capacity as the country moves from a problem of generation to one of timing and flexibility. The council set out its findings in a working paper titled The Duck and The Camel: Tracing the Net Load on the Indian Power Grid, which argued that the most direct remedy is to store energy when it is abundant and release it when it is scarce. It noted that storage is overwhelmingly a battery gap.

The paper observed that grid-scale battery deployment remains well short of the national target even as pumped hydro has very nearly reached its mark, and that recent build-out is significant but insufficient. It said a large-scale battery build-out can effectively flatten net loads rather than being a mere conjecture. The council cited the California example where a battery fleet large enough to discharge over 10 GW charges into the midday surplus and discharges into the evening.

The report described how that fleet converts an evening net-load swing of nearly 28 GW into about 10 GW after accounting for discharge, and stated that this capability will be necessary as India’s solar fleet expands. It emphasised that India’s demand for power is not only large but extremely volatile even within a single day. The paper highlighted that at three forty-five pm on May 21, 2026 India’s power grid set an all-time record when peak demand met reached 270.8 GW.

The council added that the regulatory foundation is being re-laid with draft legislation and rules that write energy storage into the Act and into the definition of power system, and that market reforms aim to deepen the power market. Measures referenced include contracts for difference, a nationally floored non-fossil obligation backed by a monetary penalty, demand response and deadlines for time-of-day tariffs. The study concluded that scaling grid batteries will be critical to ensuring flexibility and reliability.

The Economic Advisory Council to the Prime Minister (EAC-PM) has said India must scale up its grid-scale battery capacity as the country moves from a problem of generation to one of timing and flexibility. The council set out its findings in a working paper titled The Duck and The Camel: Tracing the Net Load on the Indian Power Grid, which argued that the most direct remedy is to store energy when it is abundant and release it when it is scarce. It noted that storage is overwhelmingly a battery gap. The paper observed that grid-scale battery deployment remains well short of the national target even as pumped hydro has very nearly reached its mark, and that recent build-out is significant but insufficient. It said a large-scale battery build-out can effectively flatten net loads rather than being a mere conjecture. The council cited the California example where a battery fleet large enough to discharge over 10 GW charges into the midday surplus and discharges into the evening. The report described how that fleet converts an evening net-load swing of nearly 28 GW into about 10 GW after accounting for discharge, and stated that this capability will be necessary as India’s solar fleet expands. It emphasised that India’s demand for power is not only large but extremely volatile even within a single day. The paper highlighted that at three forty-five pm on May 21, 2026 India’s power grid set an all-time record when peak demand met reached 270.8 GW. The council added that the regulatory foundation is being re-laid with draft legislation and rules that write energy storage into the Act and into the definition of power system, and that market reforms aim to deepen the power market. Measures referenced include contracts for difference, a nationally floored non-fossil obligation backed by a monetary penalty, demand response and deadlines for time-of-day tariffs. The study concluded that scaling grid batteries will be critical to ensuring flexibility and reliability.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Emiza Expands Bhiwandi Fulfilment Capacity by 2.32 Lakh Sq Ft

Emiza, a leading third-party logistics (3PL) provider, has expanded its Mumbai operations with the launch of two new fulfilment facilities in Bhiwandi, adding a combined capacity of 2.32 lakh sq ft to its network.The new facilities, spread across 75,000 sq ft and 1,57,000 sq ft, mark Emiza’s fifth and sixth warehouses in the Mumbai region. The expansion strengthens the company’s fulfilment infrastructure in Western India amid the rapid growth of India’s digital commerce ecosystem.With increasing online consumption, wider product categories and rising customer expectations for faster deli..

Next Story
Infrastructure Urban

Ingersoll Rand Showcases Air Solutions for Semiconductor Sector

Ingersoll Rand will showcase its advanced compressed air solutions for India’s growing semiconductor ecosystem at SEMICON India 2026, scheduled from September 17–19 at Yashobhoomi, New Delhi.The company will display its portfolio of oil-free compressors, centrifugal compression technologies and advanced air treatment systems at Stall No. 1156, Hall No. 1. The solutions are designed to address the stringent air quality, reliability and efficiency requirements of semiconductor manufacturing applications.With India accelerating investments across semiconductor manufacturing, packaging, equipm..

Next Story
Infrastructure Energy

RECPDCL Transfers Musalgaon Transmission SPV to MSETCL

REC Power Development and Consultancy Limited (RECPDCL), a wholly owned subsidiary of REC Limited, has handed over Musalgaon Power Transmission Limited, a project-specific Special Purpose Vehicle (SPV), to Maharashtra State Electricity Transmission Company Limited (MSETCL).MSETCL emerged as the successful bidder through the Tariff-Based Competitive Bidding (TBCB) process conducted by RECPDCL, the Bid Process Coordinator, for developing Maharashtra’s intra-state transmission project on a Build, Own, Operate and Transfer (BOOT) basis.The SPV was handed over by Shri Ratnesh Kumar, General Manag..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code