Inox Wind bags 100 MW wind power project in Gujarat
POWER & RENEWABLE ENERGY

Inox Wind bags 100 MW wind power project in Gujarat

Inox Wind, the top wind energy solutions provider in India, has secured a contract to develop a 100 MW wind power project from ABEnergia Renewables Pvt Ltd (ABEnergia), an Independent Power Producer.

According to a regulatory filing, Inox Wind will be responsible for the supply and installation of cutting-edge 3.3 MW wind turbine generators with a rotor diameter of 145 m and a hub height of 120 m. The project, located at the Dayapar site in Gujarat's Kutch district, will be executed on a turnkey basis and is expected to be operational by 2024.

Expressing his satisfaction, Kailash Tarachandani, CEO of Inox Wind, stated, "This order not only reaffirms Inox Wind Limited's position as the leading provider of wind energy solutions but also highlights the favorable conditions driving the sector's growth." He further commented, "This achievement sets the stage for our ambitious expansion plans. I am confident that with the industry's momentum and our advanced 3.3 MW turbines, IWL will experience exponential growth going forward."

Inox Wind, the top wind energy solutions provider in India, has secured a contract to develop a 100 MW wind power project from ABEnergia Renewables Pvt Ltd (ABEnergia), an Independent Power Producer.According to a regulatory filing, Inox Wind will be responsible for the supply and installation of cutting-edge 3.3 MW wind turbine generators with a rotor diameter of 145 m and a hub height of 120 m. The project, located at the Dayapar site in Gujarat's Kutch district, will be executed on a turnkey basis and is expected to be operational by 2024.Expressing his satisfaction, Kailash Tarachandani, CEO of Inox Wind, stated, This order not only reaffirms Inox Wind Limited's position as the leading provider of wind energy solutions but also highlights the favorable conditions driving the sector's growth. He further commented, This achievement sets the stage for our ambitious expansion plans. I am confident that with the industry's momentum and our advanced 3.3 MW turbines, IWL will experience exponential growth going forward.

Next Story
Infrastructure Transport

Tunnelling Begins for Thane, Borivali twin tunnel project

Tunnelling work has commenced for the 11.84-km Thane–Borivali Twin Tunnel, set to be India’s longest urban road tunnel, marking a key milestone in Mumbai’s infrastructure development.As per a post shared by Mumbai Metropolitan Region Development Authority on social media platform X, the tunnel boring machine (TBM) ‘Nayak’—the country’s largest single-shield hard rock TBM for an urban tunnel—was launched by Devendra Fadnavis on Tuesday. The event was attended by Eknath Shinde and Sunetra Pawar, among other dignitaries. A second TBM, ‘Arjuna’, is expected to be launched so..

Next Story
Infrastructure Transport

Large Format Store Planned At M G Road Metro Station

M G Road station in Bengaluru is set to host the city’s first large-format commercial and experience space, with planning led by Bangalore Metro Rail Corporation Limited. BMRCL has invited proposals to develop and operate a central business district destination at the Purple?Pink Line interchange. The plan positions the station as a commercial hub designed to serve a broad commuter base across the city. The proposal is part of a broader effort to activate transit nodes commercially. Tender documents set a minimum monthly rental of Rs 0.944 million (mn), inclusive of GST, for the large-format..

Next Story
Infrastructure Energy

Government Cancels Auction Of Eleven Critical Mineral Blocks

The government has cancelled the auction of 11 critical and strategic mineral blocks after receiving a poor investor response and failing to attract a sufficient number of qualified bidders. The decision represents a setback to plans to ramp up domestic exploration and production of critical minerals amid global supply chain disruptions and rising demand for materials used in clean energy and advanced technologies. The mines ministry issued an annulment notice setting out the reasons for the cancellations. The annulment notice indicated that the auction process for five mineral blocks was canc..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement