Modi set to inaugurate NTPC power plant
POWER & RENEWABLE ENERGY

Modi set to inaugurate NTPC power plant

According to Union minister and Telangana state BJP chief G Kishan Reddy, it was stated that Prime Minister Narendra Modi is likely to visit Telangana later in the month to dedicate the NTPC power project, which was constructed with a cost of Rs 100 billion. Additionally, during his visit, the PM will also dedicate various projects of national highways, civil aviation, and health to the nation.

After a preparatory meeting for the ensuing Lok Sabha elections in Telangana, Kishan Reddy addressed the media. He mentioned that the PM's schedule is yet to be finalised. The Union minister highlighted that the meeting followed a previous one with Union minister Amit Shah. He mentioned that the state unit has finalised an action plan with a focus on winning a maximum number of LS seats in Telangana.

The meeting involved a review of the voting at the polling booth level during the Assembly elections, and an action plan was chalked out to prepare the rank and file of the party for the upcoming general elections. Kishan Reddy noted that 90 per cent of the youth across the country want Modi to come back to power. The party will pay special attention to bringing youth at the village and mandal level into the party fold, and programs for the same will be organised.

As part of the action plan, 17 in-charges have been appointed for various parliamentary constituencies, and Parliament conveners and organisation in-charges will be announced in the next two days. The party plans to launch its poll campaign with the slogan 'Teesri Bar Modi Sarkar.' Kishan Reddy stated that, given the current political scenario, the electoral fight will be between the BJP and the Congress in the Lok Sabha elections, with the BRS not being a factor in these polls.

In response to a call given by PM Modi and the Rama Tirtha Kshetra Trust, Ayodhya, the BJP has decided to observe Swachh Abhiyan in all the temples from Sankrathi to January 22. This is the day when the Prana Prastishta will be held at Grand Ram Mandir in Ayodhya. Kishan Reddy mentioned that the program will be telecast live in 150 countries, including at the iconic Times Square in New York, and all the villages in the country.

According to Union minister and Telangana state BJP chief G Kishan Reddy, it was stated that Prime Minister Narendra Modi is likely to visit Telangana later in the month to dedicate the NTPC power project, which was constructed with a cost of Rs 100 billion. Additionally, during his visit, the PM will also dedicate various projects of national highways, civil aviation, and health to the nation. After a preparatory meeting for the ensuing Lok Sabha elections in Telangana, Kishan Reddy addressed the media. He mentioned that the PM's schedule is yet to be finalised. The Union minister highlighted that the meeting followed a previous one with Union minister Amit Shah. He mentioned that the state unit has finalised an action plan with a focus on winning a maximum number of LS seats in Telangana. The meeting involved a review of the voting at the polling booth level during the Assembly elections, and an action plan was chalked out to prepare the rank and file of the party for the upcoming general elections. Kishan Reddy noted that 90 per cent of the youth across the country want Modi to come back to power. The party will pay special attention to bringing youth at the village and mandal level into the party fold, and programs for the same will be organised. As part of the action plan, 17 in-charges have been appointed for various parliamentary constituencies, and Parliament conveners and organisation in-charges will be announced in the next two days. The party plans to launch its poll campaign with the slogan 'Teesri Bar Modi Sarkar.' Kishan Reddy stated that, given the current political scenario, the electoral fight will be between the BJP and the Congress in the Lok Sabha elections, with the BRS not being a factor in these polls. In response to a call given by PM Modi and the Rama Tirtha Kshetra Trust, Ayodhya, the BJP has decided to observe Swachh Abhiyan in all the temples from Sankrathi to January 22. This is the day when the Prana Prastishta will be held at Grand Ram Mandir in Ayodhya. Kishan Reddy mentioned that the program will be telecast live in 150 countries, including at the iconic Times Square in New York, and all the villages in the country.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code