NER Invites Bids for 10 MW Rooftop Solar Projects in Uttar Pradesh
POWER & RENEWABLE ENERGY

NER Invites Bids for 10 MW Rooftop Solar Projects in Uttar Pradesh

The Varanasi division (electrical) of Northeastern Railway has recently issued four tenders for a total of 10.4 MW on-grid rooftop solar systems to be installed at various buildings in Gorakhpur, Uttar Pradesh. The tenders include different project capacities, with submission deadlines set between January 31 and February 3, 2025. Bidders are required to submit earnest money deposits (EMDs) ranging from Rs 0.89 million to Rs 1.2 million depending on the tender, with the expected project costs varying between Rs 148 million and Rs 174.08 million.

The selected contractors will be tasked with supplying, installing, testing, and commissioning Mono PERC half-cut solar panels in accordance with the guidelines provided by the Solar Energy Corporation of India and the Ministry of New and Renewable Energy. The systems will be installed on building terraces, platform sheds, and pathways, and bidders must also supply associated components such as inverters, UV-protected flexible conduits, copper DC cables, long barrel lugs, bus bars, and data logger facilities. The completion deadline for each project is within six months from the award, with regular cleaning of the solar systems every 15 days.

Additionally, bidders must meet specific requirements regarding their average annual contractual turnover and demonstrate experience in similar projects. For tenders above Rs 5 million, bidders need to have completed relevant projects over the past seven years, with conditions on the value and number of such projects.

Earlier in October 2024, Northeastern Railways had invited tenders for a total of 2.21 MW of on-grid rooftop solar systems in the Izzatnagar division of Uttar Pradesh, further reinforcing the region's push towards sustainable energy solutions.

The Varanasi division (electrical) of Northeastern Railway has recently issued four tenders for a total of 10.4 MW on-grid rooftop solar systems to be installed at various buildings in Gorakhpur, Uttar Pradesh. The tenders include different project capacities, with submission deadlines set between January 31 and February 3, 2025. Bidders are required to submit earnest money deposits (EMDs) ranging from Rs 0.89 million to Rs 1.2 million depending on the tender, with the expected project costs varying between Rs 148 million and Rs 174.08 million. The selected contractors will be tasked with supplying, installing, testing, and commissioning Mono PERC half-cut solar panels in accordance with the guidelines provided by the Solar Energy Corporation of India and the Ministry of New and Renewable Energy. The systems will be installed on building terraces, platform sheds, and pathways, and bidders must also supply associated components such as inverters, UV-protected flexible conduits, copper DC cables, long barrel lugs, bus bars, and data logger facilities. The completion deadline for each project is within six months from the award, with regular cleaning of the solar systems every 15 days. Additionally, bidders must meet specific requirements regarding their average annual contractual turnover and demonstrate experience in similar projects. For tenders above Rs 5 million, bidders need to have completed relevant projects over the past seven years, with conditions on the value and number of such projects. Earlier in October 2024, Northeastern Railways had invited tenders for a total of 2.21 MW of on-grid rooftop solar systems in the Izzatnagar division of Uttar Pradesh, further reinforcing the region's push towards sustainable energy solutions.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App