+
NREDCAP Awards 64.5 MWp Rooftop Solar Project
POWER & RENEWABLE ENERGY

NREDCAP Awards 64.5 MWp Rooftop Solar Project

The New & Renewable Energy Development Corporation of Andhra Pradesh Ltd has awarded a letter of award to Sadbhav Futuretech Limited for the development of 64.5 MWp of grid-connected rooftop solar plants across Andhra Pradesh.

The project covers the design, engineering, supply, installation, testing, commissioning and five-year operation and maintenance of rooftop solar systems. It will benefit 32,249 Scheduled Caste and Scheduled Tribe consumers under the PM-Surya Ghar: Muft Bijli Yojana through the utility-led aggregation model on a capital expenditure basis across APDISCOMs.

The initiative forms part of a larger state-wide programme to deploy 1,198.21 MWp of rooftop solar capacity for around 599,105 SC and ST beneficiaries in Andhra Pradesh. Officials said the programme aims to expand access to clean and affordable electricity while supporting inclusive energy transition goals.

NREDCAP said it followed a comprehensive bidding process, including tender notifications, e-tendering and CAPEX rate negotiations. Based on this process, the joint venture led by Sadbhav Futuretech emerged as the successful bidder. The project is expected to accelerate rooftop solar adoption and deliver long-term clean energy benefits to rural and underserved communities.

The scope of the awarded project includes detailed design and engineering of the 64.5 MWp rooftop solar plants, supply and installation of all equipment, testing and commissioning, and a five-year O&M period to ensure system performance, efficiency and reliability.

The New & Renewable Energy Development Corporation of Andhra Pradesh Ltd has awarded a letter of award to Sadbhav Futuretech Limited for the development of 64.5 MWp of grid-connected rooftop solar plants across Andhra Pradesh. The project covers the design, engineering, supply, installation, testing, commissioning and five-year operation and maintenance of rooftop solar systems. It will benefit 32,249 Scheduled Caste and Scheduled Tribe consumers under the PM-Surya Ghar: Muft Bijli Yojana through the utility-led aggregation model on a capital expenditure basis across APDISCOMs. The initiative forms part of a larger state-wide programme to deploy 1,198.21 MWp of rooftop solar capacity for around 599,105 SC and ST beneficiaries in Andhra Pradesh. Officials said the programme aims to expand access to clean and affordable electricity while supporting inclusive energy transition goals. NREDCAP said it followed a comprehensive bidding process, including tender notifications, e-tendering and CAPEX rate negotiations. Based on this process, the joint venture led by Sadbhav Futuretech emerged as the successful bidder. The project is expected to accelerate rooftop solar adoption and deliver long-term clean energy benefits to rural and underserved communities. The scope of the awarded project includes detailed design and engineering of the 64.5 MWp rooftop solar plants, supply and installation of all equipment, testing and commissioning, and a five-year O&M period to ensure system performance, efficiency and reliability.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App