OREDA Floats Tender For Rooftop Solar At Odisha Universities
POWER & RENEWABLE ENERGY

OREDA Floats Tender For Rooftop Solar At Odisha Universities

The Odisha Renewable Energy Development Agency (OREDA) has issued a tender to invite eligible bidders for the implementation of on-grid rooftop photovoltaic (PV) projects across government universities in the state. The initiative aims to accelerate adoption of renewable energy within higher education infrastructure and to reduce reliance on conventional grid power. The tender is presented as part of the state strategy to expand distributed solar generation across public institutions.

The selected contractor will be responsible for design and engineering, supply and installation, and for testing and commissioning of the rooftop systems. The scope also requires comprehensive operation and maintenance for a period of 10 years to ensure sustained performance and asset reliability. Bidders must meet the technical specifications and qualification criteria set out in the tender documents on OREDA's e-procurement portal. Financial and warranty obligations are to be defined in the contract documents to secure long term performance.

Capacity allocations will be determined on the basis of individual institution consumption profiles and rooftop feasibility, with specific sites referenced including Biju Patnaik University of Technology in Rourkela and institutions in Berhampur. The tender clarifies that installations will be roof top solar PV on-grid systems compliant with prescribed standards and that bidders must adhere strictly to the prescribed norms. Detailed parameters and documentation are available with the technical bid package. Stakeholders will monitor and report performance.

A virtual pre bid meeting is scheduled for February 21, 2026, and the deadline for online bid submission is February 27, 2026, by 5:00 PM, with hard copies due by March 5, 2026, by 5:00 PM. The notice includes a tentative technical bid opening date that appears inconsistent with other timelines and may reflect a typographical error. The process is intended to bolster renewable uptake within campuses while promoting long term sustainability of energy assets.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The Odisha Renewable Energy Development Agency (OREDA) has issued a tender to invite eligible bidders for the implementation of on-grid rooftop photovoltaic (PV) projects across government universities in the state. The initiative aims to accelerate adoption of renewable energy within higher education infrastructure and to reduce reliance on conventional grid power. The tender is presented as part of the state strategy to expand distributed solar generation across public institutions. The selected contractor will be responsible for design and engineering, supply and installation, and for testing and commissioning of the rooftop systems. The scope also requires comprehensive operation and maintenance for a period of 10 years to ensure sustained performance and asset reliability. Bidders must meet the technical specifications and qualification criteria set out in the tender documents on OREDA's e-procurement portal. Financial and warranty obligations are to be defined in the contract documents to secure long term performance. Capacity allocations will be determined on the basis of individual institution consumption profiles and rooftop feasibility, with specific sites referenced including Biju Patnaik University of Technology in Rourkela and institutions in Berhampur. The tender clarifies that installations will be roof top solar PV on-grid systems compliant with prescribed standards and that bidders must adhere strictly to the prescribed norms. Detailed parameters and documentation are available with the technical bid package. Stakeholders will monitor and report performance. A virtual pre bid meeting is scheduled for February 21, 2026, and the deadline for online bid submission is February 27, 2026, by 5:00 PM, with hard copies due by March 5, 2026, by 5:00 PM. The notice includes a tentative technical bid opening date that appears inconsistent with other timelines and may reflect a typographical error. The process is intended to bolster renewable uptake within campuses while promoting long term sustainability of energy assets.

Next Story
Infrastructure Urban

VECV Sales Rise 7.8 Per Cent In May 2026

VE Commercial Vehicles recorded sales of 7,978 units in May 2026, compared to 7,401 units in May 2025, registering growth of 7.8 per cent. This included 7,789 units from the Eicher brand and 189 units from the Volvo brand.Eicher branded trucks and buses reported sales of 7,789 units during the month, up 7.3 per cent from 7,258 units a year earlier. In the domestic commercial vehicle market, Eicher sales rose 9.1 per cent to 7,375 units from 6,758 units in May 2025.Exports declined 17.2 per cent to 414 units from 500 units in the corresponding month last year. Volvo Trucks and Volvo Buses recor..

Next Story
Infrastructure Urban

Table Space Strengthens DESYN Leadership Team

Table Space has announced strategic leadership appointments within DESYN, its integrated Design and Build business, as it looks to strengthen operations across key enterprise and GCC markets in India. DESYN was launched as a strategic extension of Table Space’s workspace solutions portfolio to meet rising demand for agile, high-quality and rapidly deployable enterprise workspaces.Shruti Ookabhoy has joined DESYN as Executive Director and will lead the Design vertical, focusing on design capability, operational excellence and team development across markets. She brings over 22 years of experi..

Next Story
Infrastructure Transport

Concord Associate Bags Rs 2.79 Bn Kavach Order

Concord Control Systems said its associate company, Progota India, has received a Rs 2.79 bn domestic order from Indian Railways for the supply, installation, testing and commissioning of on-board Kavach 4.0 loco equipment.The order is scheduled for execution within 12 months and strengthens Concord’s role in India’s railway safety and signalling ecosystem. Kavach is India’s indigenous automatic train protection system, designed to improve operational safety by helping prevent signal passing at danger and reducing collision risks.Gaurav Lath, Joint Managing Director, Concord Control Syst..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement