OREDA Floats Tender For Rooftop Solar At Odisha Universities
POWER & RENEWABLE ENERGY

OREDA Floats Tender For Rooftop Solar At Odisha Universities

The Odisha Renewable Energy Development Agency (OREDA) has issued a tender to invite eligible bidders for the implementation of on-grid rooftop photovoltaic (PV) projects across government universities in the state. The initiative aims to accelerate adoption of renewable energy within higher education infrastructure and to reduce reliance on conventional grid power. The tender is presented as part of the state strategy to expand distributed solar generation across public institutions.

The selected contractor will be responsible for design and engineering, supply and installation, and for testing and commissioning of the rooftop systems. The scope also requires comprehensive operation and maintenance for a period of 10 years to ensure sustained performance and asset reliability. Bidders must meet the technical specifications and qualification criteria set out in the tender documents on OREDA's e-procurement portal. Financial and warranty obligations are to be defined in the contract documents to secure long term performance.

Capacity allocations will be determined on the basis of individual institution consumption profiles and rooftop feasibility, with specific sites referenced including Biju Patnaik University of Technology in Rourkela and institutions in Berhampur. The tender clarifies that installations will be roof top solar PV on-grid systems compliant with prescribed standards and that bidders must adhere strictly to the prescribed norms. Detailed parameters and documentation are available with the technical bid package. Stakeholders will monitor and report performance.

A virtual pre bid meeting is scheduled for February 21, 2026, and the deadline for online bid submission is February 27, 2026, by 5:00 PM, with hard copies due by March 5, 2026, by 5:00 PM. The notice includes a tentative technical bid opening date that appears inconsistent with other timelines and may reflect a typographical error. The process is intended to bolster renewable uptake within campuses while promoting long term sustainability of energy assets.

The Odisha Renewable Energy Development Agency (OREDA) has issued a tender to invite eligible bidders for the implementation of on-grid rooftop photovoltaic (PV) projects across government universities in the state. The initiative aims to accelerate adoption of renewable energy within higher education infrastructure and to reduce reliance on conventional grid power. The tender is presented as part of the state strategy to expand distributed solar generation across public institutions. The selected contractor will be responsible for design and engineering, supply and installation, and for testing and commissioning of the rooftop systems. The scope also requires comprehensive operation and maintenance for a period of 10 years to ensure sustained performance and asset reliability. Bidders must meet the technical specifications and qualification criteria set out in the tender documents on OREDA's e-procurement portal. Financial and warranty obligations are to be defined in the contract documents to secure long term performance. Capacity allocations will be determined on the basis of individual institution consumption profiles and rooftop feasibility, with specific sites referenced including Biju Patnaik University of Technology in Rourkela and institutions in Berhampur. The tender clarifies that installations will be roof top solar PV on-grid systems compliant with prescribed standards and that bidders must adhere strictly to the prescribed norms. Detailed parameters and documentation are available with the technical bid package. Stakeholders will monitor and report performance. A virtual pre bid meeting is scheduled for February 21, 2026, and the deadline for online bid submission is February 27, 2026, by 5:00 PM, with hard copies due by March 5, 2026, by 5:00 PM. The notice includes a tentative technical bid opening date that appears inconsistent with other timelines and may reflect a typographical error. The process is intended to bolster renewable uptake within campuses while promoting long term sustainability of energy assets.

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->