Portescap’s 40EC-Pro PT Revolutionises Industrial Power Tools
POWER & RENEWABLE ENERGY

Portescap’s 40EC-Pro PT Revolutionises Industrial Power Tools

Portescap is excited to introduce its latest innovation for the industrial power tools market: the 40EC-Pro PowerTool (PT) brushless slotless motor. This motor comes in two lengths, the 40EC-Pro PT 44 at 44mm and the 40EC-Pro PT 55 at 55mm. Notably, the 40EC-Pro PT 55 is Portescap’s first motor to feature an integrated fan, which actively cools the motor and boosts its continuous power from 150W to 425W. Both models are cost-optimised through an innovative assembly process, ensuring premium performance at an affordable price.

With its slotless design, the 40EC-Pro PT achieves speeds up to 30,000 rpm, ensuring high performance even at low voltage. The advanced electromagnetic design allows it to sustain a peak torque of up to 1.1 Nm for 2 seconds. Weighing just 230 grams and having a compact 40mm diameter, it not only supports application miniaturisation but also enhances tool ergonomics.

Compatible with R32 and R40 gearheads and the M-Sense encoder, the 4-pole BLDC motor offers higher torque at lower speeds and more accurate positioning. Portescap also provides customisation of the motor’s electrical parameters and mechanical interface to meet specific application requirements.

Battery-powered hand tools, especially those using 18V batteries, benefit immensely from the 40EC-Pro PT motor. This includes nut runners, tightening tools, and strapping, stapling, riveting, crimping, and cutting hand tools. The 40EC-Pro PT motor facilitates the transition from manual to powered devices and supports the shift from brushed to brushless technologies.

Portescap is excited to introduce its latest innovation for the industrial power tools market: the 40EC-Pro PowerTool (PT) brushless slotless motor. This motor comes in two lengths, the 40EC-Pro PT 44 at 44mm and the 40EC-Pro PT 55 at 55mm. Notably, the 40EC-Pro PT 55 is Portescap’s first motor to feature an integrated fan, which actively cools the motor and boosts its continuous power from 150W to 425W. Both models are cost-optimised through an innovative assembly process, ensuring premium performance at an affordable price.With its slotless design, the 40EC-Pro PT achieves speeds up to 30,000 rpm, ensuring high performance even at low voltage. The advanced electromagnetic design allows it to sustain a peak torque of up to 1.1 Nm for 2 seconds. Weighing just 230 grams and having a compact 40mm diameter, it not only supports application miniaturisation but also enhances tool ergonomics.Compatible with R32 and R40 gearheads and the M-Sense encoder, the 4-pole BLDC motor offers higher torque at lower speeds and more accurate positioning. Portescap also provides customisation of the motor’s electrical parameters and mechanical interface to meet specific application requirements.Battery-powered hand tools, especially those using 18V batteries, benefit immensely from the 40EC-Pro PT motor. This includes nut runners, tightening tools, and strapping, stapling, riveting, crimping, and cutting hand tools. The 40EC-Pro PT motor facilitates the transition from manual to powered devices and supports the shift from brushed to brushless technologies.

Next Story
Infrastructure Transport

Pune To Build Nine Km Link Road Between Highways

The Pune Municipal Corporation (PMC) has decided to appoint an expert to plan the development of a nine km long, 60 metre wide road from Khadi Machine chowk to Wadki chowk as an extension to the Katraj-Kondhwa road to link the Mumbai-Satara and Pune-Solapur national highways. The scheme is intended to divert heavy vehicle traffic away from the city and improve access between the two arterial routes. The project has been prioritised by the PMC and forms part of a larger set of schemes in which 19 roads have been identified for development at a combined cost of Rs 9.82 billion (bn) to address c..

Next Story
Infrastructure Transport

Barabanki Bahraich Six Lane Highway Approved in Uttar Pradesh

The Uttar Pradesh government has approved construction of a new six-lane highway linking Barabanki and Bahraich as part of National Highway 927, and the cabinet has cleared the project. The alignment will pass through Mustafabad and Kaiserganj and extend for about 101.5 km, creating a key corridor for local and long-distance movement. The National Highways Authority of India will oversee the work and has signalled the scheme is intended to strengthen regional connectivity and cross-border access to Nepal. The project carries an estimated total cost of Rs 69,690 million, equivalent to Rs 69.69..

Next Story
Infrastructure Transport

Toll At Kharegaon Likely As Highway Upgrade Nears Completion

A section of the highway at Kharegaon has undergone an upgrade and is approaching completion, and authorities have indicated plans for a toll to be introduced once works finish. The project has focused on strengthening the carriageway, improving drainage and upgrading intersections to enhance safety and capacity. Officials have said the toll will be used to recover construction costs and fund ongoing maintenance. The upgrade included resurfacing of the pavement, widening of certain stretches and installation of modern signage and lighting to reduce accident risk. Contractors completed most ma..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement