
Researchers develop fully Perovskite tandem solar cell

Rs 18 Billion River Link Plan to Tackle Water Woes
The state government has unveiled an ambitious intra-state river linking programme to address persistent challenges in water management, such as flooding, water scarcity, and agricultural demand.Scheduled for phased implementation from 2025–26 to 2029–30, the initiative carries an estimated cost of Rs 18 billion. Led by the Department of Water Resources, the project aims to improve irrigation, mitigate flood risks, and ensure reliable access to drinking water across the state.According to sources, six key projects are planned to connect water-surplus river basins with deficit regions. Thes..

Driverless Metro Line Set to Launch in Bengaluru by August
Metro operations between RV Road and Bommasandra on Bengaluru’s Yellow Line are expected to commence in August, with safety inspections currently underway. The Commissioner of Metro Railway Safety (CMRS) began a comprehensive inspection on Tuesday, which included a motor trolley examination of the tracks.This 18.8-kilometre stretch, which connects South Bengaluru to the Electronic City IT hub, marks India’s first deployment of CBTC (Communication-Based Train Control) driverless train technology on the Namma Metro network. Due to the advanced system, there is heightened scrutiny of speed re..

Hindustan Zinc Reclaims 13 Hectares of Industrial Land with TERI
Hindustan Zinc Limited, India’s leading integrated zinc producer, has achieved a new sustainability milestone by reclaiming 7 hectares of industrial land under Phase 2 of its restoration project with The Energy and Resources Institute (TERI). This brings the total reclaimed area to 13 hectares at the Chanderiya Lead Zinc Smelter in Rajasthan.The project, which began in August 2024, uses Mycorrhiza technology to convert Jarofix-laden wasteland into dense greenbelts. Following the success of Phase 1, which covered 6.25 hectares and saw 11,000 native plants planted, Phase 2 has added 15,000 sap..