Sharika Wins Rs 77 Million Cable Contract From UPPTCL
POWER & RENEWABLE ENERGY

Sharika Wins Rs 77 Million Cable Contract From UPPTCL

Sharika Enterprises Ltd has announced that the Uttar Pradesh government-owned UP Power Transmission Corporation Ltd (UPPTCL) has awarded it a contract worth Rs 77.3 million for the design, engineering, manufacture and supply of 132KV, 630 mm² single-core aluminium conductor corrugated aluminium-sheathed XLPE cables.

Based in Noida, Sharika Enterprises operates in the trading and distribution industry and specialises in power transmission and smart-grid engineering projects.

Key Contract Details The turnkey order from UPPTCL covers the complete design, engineering, manufacture and supply of the 132KV cables, as well as cable laying, jointing, terminations, testing and commissioning of an underground section of the 132KV DC Sonik–Sarain Katiyan/Murtazanagar line, spanning around 1.7 km.

The contract is expected to be completed within nine months. Sharika noted that the order is not linked to any related parties, underscoring its ability to secure major government projects independently.

Share Price Update Sharika Enterprises Ltd’s share price closed at Rs 14.82, down 1.33 per cent (Rs 0.20) on 12 November at 3:30 PM IST. The stock touched a high of Rs 15.59 during the day and opened at the same level, with an intraday low of Rs 14.82. The company’s market capitalisation stands at Rs 641.7 million, with a price-to-earnings ratio of 132.36 and no current dividend yield. Over the past 52 weeks, the stock has traded between Rs 23.98 and Rs 12.05.

Sharika Enterprises Ltd has announced that the Uttar Pradesh government-owned UP Power Transmission Corporation Ltd (UPPTCL) has awarded it a contract worth Rs 77.3 million for the design, engineering, manufacture and supply of 132KV, 630 mm² single-core aluminium conductor corrugated aluminium-sheathed XLPE cables. Based in Noida, Sharika Enterprises operates in the trading and distribution industry and specialises in power transmission and smart-grid engineering projects. Key Contract Details The turnkey order from UPPTCL covers the complete design, engineering, manufacture and supply of the 132KV cables, as well as cable laying, jointing, terminations, testing and commissioning of an underground section of the 132KV DC Sonik–Sarain Katiyan/Murtazanagar line, spanning around 1.7 km. The contract is expected to be completed within nine months. Sharika noted that the order is not linked to any related parties, underscoring its ability to secure major government projects independently. Share Price Update Sharika Enterprises Ltd’s share price closed at Rs 14.82, down 1.33 per cent (Rs 0.20) on 12 November at 3:30 PM IST. The stock touched a high of Rs 15.59 during the day and opened at the same level, with an intraday low of Rs 14.82. The company’s market capitalisation stands at Rs 641.7 million, with a price-to-earnings ratio of 132.36 and no current dividend yield. Over the past 52 weeks, the stock has traded between Rs 23.98 and Rs 12.05.

Next Story
Real Estate

RBI Rate Cut Boosts Confidence Across Housing Market

Industry Context and Market DynamicsThe real estate industry has welcomed the RBI’s rate cut as a timely boost to affordability and demand. With home prices having risen steadily across major markets, even a marginal reduction in interest rates meaningfully strengthens purchasing power, especially for first-time and mid-income buyers.Ashish Jerath, President – Sales & Marketing, Smartworld Developers, observes:“The RBI’s 25-basis-point cut, bringing the repo rate down to 5.25%, is a timely boost for the real estate sector. Lower interest rates reduce borrowing costs, enabling homeb..

Next Story
Infrastructure Transport

BMC Resumes Rs 170 Billion Road Works, Targets 80 per cent By Jan 2026

Following the withdrawal of the southwest monsoon in October, the Brihanmumbai Municipal Corporation (BMC) has restarted work on 645 roads—covering 297.49 kilometres—under its large-scale concretisation programme. Data shows that more than 60 per cent of the resumed works are located in the western suburbs. Officials said the civic body aims to complete concretisation on 80 per cent of the roads where fresh work has begun by January 2026. Launched in 2022, the Rs 170 billion project seeks to concretise 700 kilometres of roads across Mumbai. All civil works were halted during the monsoon ..

Next Story
Infrastructure Urban

India Pushes Digital Shift In Urban Land Mapping

The Department of Land Resources (DoLR) under the Ministry of Rural Development has convened a National Symposium on NAKSHA – the National Geospatial Knowledge-based Land Survey of Urban Habitations – to advance India’s transition to modern, technology-driven land mapping. Speaking at the inaugural session, Secretary Manoj Joshi underscored the urgent need to move revenue departments away from outdated, tape-based methods and rough hand-drawn sketches. He stressed that adopting latitude–longitude-based digital mapping and GIS-linked registration systems is essential for economic stabi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App