Sikkim government seeks bid for electrical works
POWER & RENEWABLE ENERGY

Sikkim government seeks bid for electrical works

Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. 

Key Dates

Event

Date & Time 

Deadline for Submission of Bid

20.04.2023 at 1600 Hours (IST)


Date & Time of Opening of Technical Part of Bid

21.04.2023 at 1100 Hours (IST)


Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.

Brief description of scope of work: 

The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :

11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:

i. 11Kv 3 phase, transmission line on DOG conductor.

ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.

iii. Capacity addition of Distribution Sub- stations of following capacities:

a)63KVA

b)100 KVA

c)200KVA

d)315KVA

iv. Extension of 3 phase, 5 wire L.T.

Distribution line.

v. Conversion of overhead L.T. Distribution

line into Ariel Bunch cable(3x50+1x35+1x16) system.

The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. 

Bid opening place: Conference Hall, Top Floor, Kazi Road, Power Deptt

Essential details:

Project Estimated Value: ₹ 26,91,00,000

Product Category: Electrical Works

Form of Contract: FOI

Bid Validity (Days): 180 

Period of Work: 730 days 

Tender ID - 2023_EPDsi_635_1

Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-II

Payment mode: Offline


Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. Key DatesEventDate & Time Deadline for Submission of Bid20.04.2023 at 1600 Hours (IST)Date & Time of Opening of Technical Part of Bid21.04.2023 at 1100 Hours (IST)Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.Brief description of scope of work: The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:i. 11Kv 3 phase, transmission line on DOG conductor.ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.iii. Capacity addition of Distribution Sub- stations of following capacities:a)63KVAb)100 KVAc)200KVAd)315KVAiv. Extension of 3 phase, 5 wire L.T.Distribution line.v. Conversion of overhead L.T. Distributionline into Ariel Bunch cable(3x50+1x35+1x16) system.The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. Bid opening place: Conference Hall, Top Floor, Kazi Road, Power DepttEssential details:Project Estimated Value: ₹ 26,91,00,000 Product Category: Electrical Works Form of Contract: FOIBid Validity (Days): 180 Period of Work: 730 days Tender ID - 2023_EPDsi_635_1Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-IIPayment mode: Offline

Related Stories

Gold Stories

Next Story
Infrastructure Urban

KONE Opens India's First Digital Experience Centre in Pune

KONE, a global elevator and escalator manufacturer, has inaugurated its first Digital Experience Centre (DEC) in India, located in Pune. The facility aims to showcase how artificial intelligence (AI), connectivity and data-driven technologies can enhance customer experiences and improve building operations.The centre was inaugurated by Jussi Herlin, Executive Vice Chair, KONE Corporation; Philippe Delorme, President and CEO, KONE; and Nandan Nilekani, Co-founder and Chairman of the Board, Infosys.Designed as an interactive customer environment, the facility demonstrates digital solutions cover..

Next Story
Infrastructure Urban

CII GreenCo Launches Circularity Guidelines for Indian Industry

The Confederation of Indian Industry (CII) GreenCo Council has launched the CII GreenCo Circularity Guidelines – Pilot Version at the 17th CII GreenCo Waste & Resource Management Summit 2026 in Chennai. The initiative aims to strengthen resource efficiency, waste reduction and circular economy practices across Indian manufacturing and process industries.The guidelines introduce a structured framework with circularity indices covering raw materials, consumables, packaging and other resource inputs. These indicators will help industries assess existing practices, identify opportunities to ..

Next Story
Infrastructure Energy

Global Electronics Association Launches IPC-1783-CO2E Standard

The Global Electronics Association has introduced IPC-1783-CO2E, a new international standard aimed at improving consistency, transparency and comparability in product carbon footprint reporting across the electronics manufacturing industry.The standard, titled International Standard for Data Collection and Reporting of CO2 Equivalent (CO2e) Emissions for the Electronics Manufacturing Supply Chain, provides industry-specific guidance for collecting, estimating and reporting carbon emissions data.With increasing regulatory requirements and customer expectations, electronics manufacturers face c..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code