+
Sikkim government seeks bid for electrical works
POWER & RENEWABLE ENERGY

Sikkim government seeks bid for electrical works

Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. 

Key Dates

Event

Date & Time 

Deadline for Submission of Bid

20.04.2023 at 1600 Hours (IST)


Date & Time of Opening of Technical Part of Bid

21.04.2023 at 1100 Hours (IST)


Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.

Brief description of scope of work: 

The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :

11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:

i. 11Kv 3 phase, transmission line on DOG conductor.

ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.

iii. Capacity addition of Distribution Sub- stations of following capacities:

a)63KVA

b)100 KVA

c)200KVA

d)315KVA

iv. Extension of 3 phase, 5 wire L.T.

Distribution line.

v. Conversion of overhead L.T. Distribution

line into Ariel Bunch cable(3x50+1x35+1x16) system.

The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. 

Bid opening place: Conference Hall, Top Floor, Kazi Road, Power Deptt

Essential details:

Project Estimated Value: ₹ 26,91,00,000

Product Category: Electrical Works

Form of Contract: FOI

Bid Validity (Days): 180 

Period of Work: 730 days 

Tender ID - 2023_EPDsi_635_1

Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-II

Payment mode: Offline


Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. Key DatesEventDate & Time Deadline for Submission of Bid20.04.2023 at 1600 Hours (IST)Date & Time of Opening of Technical Part of Bid21.04.2023 at 1100 Hours (IST)Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.Brief description of scope of work: The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:i. 11Kv 3 phase, transmission line on DOG conductor.ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.iii. Capacity addition of Distribution Sub- stations of following capacities:a)63KVAb)100 KVAc)200KVAd)315KVAiv. Extension of 3 phase, 5 wire L.T.Distribution line.v. Conversion of overhead L.T. Distributionline into Ariel Bunch cable(3x50+1x35+1x16) system.The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. Bid opening place: Conference Hall, Top Floor, Kazi Road, Power DepttEssential details:Project Estimated Value: ₹ 26,91,00,000 Product Category: Electrical Works Form of Contract: FOIBid Validity (Days): 180 Period of Work: 730 days Tender ID - 2023_EPDsi_635_1Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-IIPayment mode: Offline

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App