Sikkim government seeks bid for electrical works
POWER & RENEWABLE ENERGY

Sikkim government seeks bid for electrical works

Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. 

Key Dates

Event

Date & Time 

Deadline for Submission of Bid

20.04.2023 at 1600 Hours (IST)


Date & Time of Opening of Technical Part of Bid

21.04.2023 at 1100 Hours (IST)


Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.

Brief description of scope of work: 

The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :

11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:

i. 11Kv 3 phase, transmission line on DOG conductor.

ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.

iii. Capacity addition of Distribution Sub- stations of following capacities:

a)63KVA

b)100 KVA

c)200KVA

d)315KVA

iv. Extension of 3 phase, 5 wire L.T.

Distribution line.

v. Conversion of overhead L.T. Distribution

line into Ariel Bunch cable(3x50+1x35+1x16) system.

The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. 

Bid opening place: Conference Hall, Top Floor, Kazi Road, Power Deptt

Essential details:

Project Estimated Value: ₹ 26,91,00,000

Product Category: Electrical Works

Form of Contract: FOI

Bid Validity (Days): 180 

Period of Work: 730 days 

Tender ID - 2023_EPDsi_635_1

Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-II

Payment mode: Offline


Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. Key DatesEventDate & Time Deadline for Submission of Bid20.04.2023 at 1600 Hours (IST)Date & Time of Opening of Technical Part of Bid21.04.2023 at 1100 Hours (IST)Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.Brief description of scope of work: The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:i. 11Kv 3 phase, transmission line on DOG conductor.ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.iii. Capacity addition of Distribution Sub- stations of following capacities:a)63KVAb)100 KVAc)200KVAd)315KVAiv. Extension of 3 phase, 5 wire L.T.Distribution line.v. Conversion of overhead L.T. Distributionline into Ariel Bunch cable(3x50+1x35+1x16) system.The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. Bid opening place: Conference Hall, Top Floor, Kazi Road, Power DepttEssential details:Project Estimated Value: ₹ 26,91,00,000 Product Category: Electrical Works Form of Contract: FOIBid Validity (Days): 180 Period of Work: 730 days Tender ID - 2023_EPDsi_635_1Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-IIPayment mode: Offline

Next Story
Infrastructure Energy

Vedanta Aluminium Uses 1.57 bn Units of Green Energy in FY25

Vedanta Aluminium, India’s largest aluminium producer, recently reported consumption of 1.57 billion units of renewable energy in FY25, marking a significant milestone in its 2030 decarbonisation roadmap. The company also achieved an 8.96 per cent reduction in greenhouse gas (GHG) emissions intensity compared to FY21, reinforcing its leadership in India’s low-carbon manufacturing transition. During FY25, Vedanta Aluminium expanded its renewable energy portfolio through long-term power purchase agreements, strengthening its strategy to source nearly 1,500 MW of renewable power over the lon..

Next Story
Real Estate

Oberoi Group to Develop Luxury Resort at Makaibari Tea Estate

EIH Limited, the flagship company of The Oberoi Group, has announced the signing of a management agreement to develop an Oberoi luxury resort at the iconic Makaibari Tea Estate in Darjeeling. The project marks a key milestone in the Group’s long-term strategy of creating distinctive hospitality experiences in rare and environmentally significant locations. Established in 1859, Makaibari is one of the world’s oldest tea estates and is globally recognised for its Himalayan landscape, primary forests and exceptional biodiversity. Spread across 1,236 acres, the estate houses one of the world..

Next Story
Real Estate

GHV Infra Secures Rs 1.09 Bn EPC Order in Jamshedpur

GHV Infra Projects Ltd, a fast-growing EPC company in India’s infrastructure and construction sector, has recently secured a Rs 1.09 billion work order in Jamshedpur, Jharkhand. Awarded by a reputed group entity, the contract covers end-to-end civil construction, mechanical, electrical and plumbing (MEP) systems, along with high-quality finishing works for a large building development. The project will be executed over a 30-month period, with defined benchmarks for quality, safety and timely delivery. The order strengthens GHV Infra’s footprint in Jamshedpur, a key industrial hub known fo..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App