Sikkim government seeks bid for electrical works
POWER & RENEWABLE ENERGY

Sikkim government seeks bid for electrical works

Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. 

Key Dates

Event

Date & Time 

Deadline for Submission of Bid

20.04.2023 at 1600 Hours (IST)


Date & Time of Opening of Technical Part of Bid

21.04.2023 at 1100 Hours (IST)


Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.

Brief description of scope of work: 

The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :

11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:

i. 11Kv 3 phase, transmission line on DOG conductor.

ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.

iii. Capacity addition of Distribution Sub- stations of following capacities:

a)63KVA

b)100 KVA

c)200KVA

d)315KVA

iv. Extension of 3 phase, 5 wire L.T.

Distribution line.

v. Conversion of overhead L.T. Distribution

line into Ariel Bunch cable(3x50+1x35+1x16) system.

The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. 

Bid opening place: Conference Hall, Top Floor, Kazi Road, Power Deptt

Essential details:

Project Estimated Value: ₹ 26,91,00,000

Product Category: Electrical Works

Form of Contract: FOI

Bid Validity (Days): 180 

Period of Work: 730 days 

Tender ID - 2023_EPDsi_635_1

Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-II

Payment mode: Offline


Energy and power department- Government of Sikkim has released a tender for 11 kv downstream connectivity works of mangan, gyalshing and Soreng districts of Sikkim state under revamped reforms-based and results-linked, distribution sector scheme. Key DatesEventDate & Time Deadline for Submission of Bid20.04.2023 at 1600 Hours (IST)Date & Time of Opening of Technical Part of Bid21.04.2023 at 1100 Hours (IST)Bidding will be conducted through national open competitive e-procurement.  The bidding document is available online  for downloading on https://sikkimtender.gov.in  16.03.2023 to 20.04.2023.Brief description of scope of work: The scope of work under the subject package includes site survey, planning, design, engineering, assembly manufacturing, testing, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning and documentation of all items/material, required to complete the following works in Gangtok, Pakyong, Namchi & Mangan district of Sikkim which inter-alia include :11 KV Downstream connectivity at Gyalshing, Soreng & Mangan:i. 11Kv 3 phase, transmission line on DOG conductor.ii. 11 KV, 120sqmm, XLPE insulated armoured cable with Aluminium conductor from 11KV feeder panel to OH line.iii. Capacity addition of Distribution Sub- stations of following capacities:a)63KVAb)100 KVAc)200KVAd)315KVAiv. Extension of 3 phase, 5 wire L.T.Distribution line.v. Conversion of overhead L.T. Distributionline into Ariel Bunch cable(3x50+1x35+1x16) system.The tender seeks electrical work worth Rs 26,91,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 180 days, and it will be an open bidding process. The bid submission period began on April 1, 2023 and will end on May 2, 2023. Bid opening place: Conference Hall, Top Floor, Kazi Road, Power DepttEssential details:Project Estimated Value: ₹ 26,91,00,000 Product Category: Electrical Works Form of Contract: FOIBid Validity (Days): 180 Period of Work: 730 days Tender ID - 2023_EPDsi_635_1Tender Ref. No.:85/RDSS/WORK/POWER/GOS/ACE-IIPayment mode: Offline

Next Story
Infrastructure Energy

BMW Industries partners with IOCL for PNG supply at Bokaro plant

BMW Industries has entered into a strategic partnership with Indian Oil Corporation (IOCL) for the supply of Piped Natural Gas (PNG), reinforcing its commitment to adopting cleaner and more efficient energy sources for its operations.The agreement was signed at the Eastern Region Pipelines (ERPL) headquarters in Kolkata. The partnership is expected to support the company’s upcoming manufacturing facility in Bokaro by facilitating the use of natural gas as a primary energy source.According to the company, the adoption of PNG will help enhance operational efficiency while also contributing to ..

Next Story
Real Estate

Bombay Realty Secures RERA for Three ICC Tower in South Mumbai

Bombay Realty, the real estate arm of Bombay Dyeing and part of the Wadia Group, has received Real Estate Regulatory Authority (RERA) certification for Three ICC – Wing A, the latest luxury residential tower at Island City Center in Mumbai’s Dadar.The RERA registration marks a key milestone in the development timeline and reinforces the company’s focus on regulatory transparency, timely project delivery, and high construction standards.Following the success of One ICC and Two ICC, the upcoming Three ICC tower represents the next phase of the Island City Center development. The project ai..

Next Story
Infrastructure Energy

Flender launches India’s largest wind gearbox test rig in Walajabad

Flender has inaugurated a 13.5 MW wind turbine gearbox test rig at its Walajabad facility near Chennai, marking the largest installation of its kind in India. The new facility is expected to strengthen the company’s manufacturing and testing capabilities while supporting the growing demands of the wind power sector in both domestic and global markets.The test rig was inaugurated on March 5 in the presence of Andreas Evertz, Group CEO, Flender; Lars Wiegemann, Vice President Wind Gears, Flender; and Vinod Shetty, CEO, Flender India, along with key industry customers and stakeholders.The insta..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement