Solmacher Signs Huawei Deal For 40 MWh BESS In Maldives
POWER & RENEWABLE ENERGY

Solmacher Signs Huawei Deal For 40 MWh BESS In Maldives

Solmacher Solar Energy has signed an agreement with Huawei Digital Power for the supply of a 40 MWh battery energy storage system (BESS) and utility and commercial and industrial inverters for a smart microgrid project in the Maldives. The contract covers equipment and integration services for the Royal Rosewood Resort Island project, which is intended to combine onshore renewable generation with storage and existing thermal generation. The companies positioned the project as a step towards larger-scale renewable deployment for resort and island energy systems.

The microgrid will combine a 16 megawatt peak (MWp) solar farm, a 40 MWh BESS and diesel generators (DGs) and is expected to be the largest project of its kind in the Maldives. The system design aims to enable more than 70 per cent of the energy demand at the resort island to be met through renewable energy sources while ensuring continuous supply when solar output varies. Project planners included inverter capacity to manage grid stability and the transition between solar, storage and DGs.

The agreement covers supply of Huawei Digital Power's energy storage and inverter solutions to support the integration of solar generation with energy storage and existing diesel generation. The technical scope includes system control, power conversion and installation services to enable coordinated operation across generation and storage assets. Operators will be able to use stored energy to smooth peaks and reduce reliance on diesel during daylight and evening demand cycles.

The memorandum was signed by Wassim Ayoubi, founder and managing director of Solmacher Solar Energy, and Wang Qiang, managing director of Huawei Digital Power for the Multi-GCC Representative Office, formalising the commercial terms and delivery timetable. Project backers expect the deployment to bolster resilience and reduce fuel consumption for the resort island's power supply. The initiative adds to a growing pipeline of grid?scale storage projects serving tourism and island communities in South Asia.

Solmacher Solar Energy has signed an agreement with Huawei Digital Power for the supply of a 40 MWh battery energy storage system (BESS) and utility and commercial and industrial inverters for a smart microgrid project in the Maldives. The contract covers equipment and integration services for the Royal Rosewood Resort Island project, which is intended to combine onshore renewable generation with storage and existing thermal generation. The companies positioned the project as a step towards larger-scale renewable deployment for resort and island energy systems. The microgrid will combine a 16 megawatt peak (MWp) solar farm, a 40 MWh BESS and diesel generators (DGs) and is expected to be the largest project of its kind in the Maldives. The system design aims to enable more than 70 per cent of the energy demand at the resort island to be met through renewable energy sources while ensuring continuous supply when solar output varies. Project planners included inverter capacity to manage grid stability and the transition between solar, storage and DGs. The agreement covers supply of Huawei Digital Power's energy storage and inverter solutions to support the integration of solar generation with energy storage and existing diesel generation. The technical scope includes system control, power conversion and installation services to enable coordinated operation across generation and storage assets. Operators will be able to use stored energy to smooth peaks and reduce reliance on diesel during daylight and evening demand cycles. The memorandum was signed by Wassim Ayoubi, founder and managing director of Solmacher Solar Energy, and Wang Qiang, managing director of Huawei Digital Power for the Multi-GCC Representative Office, formalising the commercial terms and delivery timetable. Project backers expect the deployment to bolster resilience and reduce fuel consumption for the resort island's power supply. The initiative adds to a growing pipeline of grid?scale storage projects serving tourism and island communities in South Asia.

Related Stories

Gold Stories

Next Story
Real Estate

WSB Real Estate Partners Exits Six Housing Investments

WSB Real Estate Partners recently announced the successful exit of six residential investments across Bengaluru, Mumbai Metropolitan Region (MMR) and National Capital Region (NCR), delivering an average internal rate of return (IRR) of 19–21 per cent and an overall investment return of 1.4 times.The real estate-focused investment firm invested approximately Rs 7 billion across six mid-affordable housing projects over the past four years. All six investments were fully repaid between April and November 2026, several months ahead of their original investment tenures.WSB collaborated with sever..

Next Story
Infrastructure Transport

Aluminium Industry Seeks Policy Support for Rs 4 Trillion Investment

The Aluminium Association of India (AAI) has recently urged the government to introduce supportive policy measures to safeguard the sector’s proposed Rs 4 trillion investment pipeline. The association highlighted the need for a predictable policy framework to strengthen domestic manufacturing, expand production capacity and reduce import dependence.AAI submitted its recommendations for the Union Budget 2027-28 to the Ministries of Finance, Commerce and Industry, and Mines, along with the Department for Promotion of Industry and Internal Trade (DPIIT).India’s aluminium demand is projected t..

Next Story
Technology

ABB Unveils Intelligent Motor to Accelerate Industrial AI Adoption

ABB recently launched Intelleqt, which it describes as the world’s first low-voltage motor with factory-integrated intelligence, at the SPS trade fair in Germany. Designed to deliver real-time operational insights from its first rotation, the motor enables industrial operators to integrate equipment-level data into existing digital platforms while retaining full ownership of their data.The launch addresses growing challenges in scaling artificial intelligence (AI) across industrial operations, particularly data quality and availability. According to Deloitte, while 84 per cent of manufacture..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code