Tata Power Green commissions 225 MW hybrid power project for Mumbai
POWER & RENEWABLE ENERGY

Tata Power Green commissions 225 MW hybrid power project for Mumbai

Tata Power Green Energy (TPGEL) has commissioned a 225MW hybrid power project in Rajasthan, as per reports. The power generated from the project will be supplied to Tata Power, Mumbai Distribution under a Power Purchase Agreement (PPA), valid for a period of 25 years, to fulfil its Renewable Purchase Obligation (RPO).

With the addition of 225 MW of hybrid power to Tata Power, Mumbai Distribution customers’ revised power supply portfolio will be rising to 38% non-carbon power. Against the yearly requirement of nearly 5,200 MUs annually the non-carbon supply will be approximately 2,000 MUs.

Tata Power Green Energy (TPGEL) has commissioned a 225MW hybrid power project in Rajasthan, as per reports. The power generated from the project will be supplied to Tata Power, Mumbai Distribution under a Power Purchase Agreement (PPA), valid for a period of 25 years, to fulfil its Renewable Purchase Obligation (RPO). With the addition of 225 MW of hybrid power to Tata Power, Mumbai Distribution customers’ revised power supply portfolio will be rising to 38% non-carbon power. Against the yearly requirement of nearly 5,200 MUs annually the non-carbon supply will be approximately 2,000 MUs.

Next Story
Infrastructure Urban

Welspun Enterprises Wins 910 MLD Panjrapur WTP Contract

Welspun Enterprises (WEL), the infrastructure and energy arm of Welspun World, has secured a major contract from the Brihanmumbai Municipal Corporation (BMC) to design, build and operate a 910 million litres per day (MLD) Water Treatment Plant (WTP) at Panjrapur, Maharashtra.Valued at approximately Rs 31.45 billion, the project encompasses end-to-end civil, mechanical, electrical and instrumentation works, including the construction of a treated water sump and pumping station. Of the total value, nearly Rs 11.56 billion is allocated to Operations & Maintenance (O&M), with an additional..

Next Story
Infrastructure Energy

Mitsubishi Power Wins Boiler Upgrade Contract for O Mon 1 Plant

Mitsubishi Power, a power solutions brand of Mitsubishi Heavy Industries, (MHI), has been awarded a contract to support the oil-to-natural-gas fuel conversion at the O Mon 1 Thermal Power Plant in Can Tho, southern Vietnam. As the OEM of the plant’s existing boiler, Mitsubishi Power will supply key equipment—including new gas burners—and implement a selective catalytic reduction (SCR) system to reduce NOx emissions and help the plant meet stricter environmental standards.The O Mon 1 facility includes two 330 MW units that commenced operations in 2009 and 2015, with all major equipment or..

Next Story
Equipment

Liebherr’s 10,000th XPower Wheel Loader Joins BERGER’s Fleet

BERGER Rohstoffe GmbH has welcomed the 10,000th Liebherr XPower wheel loader to its operations at the Schlag granite quarry in Passau. The milestone machine, officially handed over at Liebherr’s Bischofshofen plant in May 2025, underscores the long-standing partnership between BERGER, Liebherr, and the Beutlhauser Group. Equipped with Liebherr’s signature power-split travel drive, the new L 580 XPower is already delivering strong results under demanding quarry conditions.At the Schlag quarry, BERGER Rohstoffe processes approximately 200,000 tonnes of Bayerwald granite annually into high-qu..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement