TCIL seeks bids for a 25 MW solar project in Mauritius
POWER & RENEWABLE ENERGY

TCIL seeks bids for a 25 MW solar project in Mauritius

A 25 MW grid-connected solar power project in Mauritius with a corresponding transmission line up to the point of dispatch to the grid has been put out to bid by Telecommunications Consultants India (TCIL), a Government of India enterprise.

Additionally, for a year, the project's operation and maintenance (O&M) must be under the control of the winning bidder.

The bids must be submitted by April 28, 2023. The day of the opening of bids will be used.

The purpose of this tender is to find a partner willing to collaborate with TCIL only on the aforementioned project.

Within ten days of receiving the letter of award, the winning bidder must provide a performance security deposit equal to 5% of the total contract value.

Bidders must have prior experience as an engineering, procurement, and construction (EPC) partner, management EPC partner, or sub-EPC partner in solar installations that have been connected to the grid and successfully completed within the last seven years in order to participate in the bidding process.

The successful completion of one similar project with a capacity of at least 17.5 MW, two projects with a capacity of at least 12.5 MW, or three projects with a capacity of at least 10 MW during the previous seven years is required of bidders.

Also read:
During FY 22-23, SECI sees a 59% increase in RE power trading
First floating solar project in Rajasthan commissioned by Oriana Power


A 25 MW grid-connected solar power project in Mauritius with a corresponding transmission line up to the point of dispatch to the grid has been put out to bid by Telecommunications Consultants India (TCIL), a Government of India enterprise. Additionally, for a year, the project's operation and maintenance (O&M) must be under the control of the winning bidder. The bids must be submitted by April 28, 2023. The day of the opening of bids will be used. The purpose of this tender is to find a partner willing to collaborate with TCIL only on the aforementioned project. Within ten days of receiving the letter of award, the winning bidder must provide a performance security deposit equal to 5% of the total contract value. Bidders must have prior experience as an engineering, procurement, and construction (EPC) partner, management EPC partner, or sub-EPC partner in solar installations that have been connected to the grid and successfully completed within the last seven years in order to participate in the bidding process. The successful completion of one similar project with a capacity of at least 17.5 MW, two projects with a capacity of at least 12.5 MW, or three projects with a capacity of at least 10 MW during the previous seven years is required of bidders. Also read: During FY 22-23, SECI sees a 59% increase in RE power trading First floating solar project in Rajasthan commissioned by Oriana Power

Next Story
Infrastructure Urban

Coal Ministry Achieves Milestones under Special Campaign 5.0

The Ministry of Coal and its Public Sector Undertakings (PSUs) have achieved notable milestones under the Special Campaign 5.0, focusing on cleanliness, operational efficiency, and sustainability across the coal sector. During the implementation phase from 2–31 October 2025, over 1,205 sites were cleaned, covering 68,04,087 sq ft, nearing the target of 82,51,511 sq ft. Scrap disposal of 5,813 MT against a target of 8,678 MT generated Rs 228.7 million in revenue. In addition, 1,11,248 physical and 30,331 electronic files were reviewed, with 74,123 weeded out or closed. Key initiatives showc..

Next Story
Infrastructure Energy

Vesting Orders Issued for Three Coal Blocks under Commercial Auctions

The Ministry of Coal’s Nominated Authority has issued vesting orders for three coal blocks under commercial coal block auctions on 23 October 2025. The Coal Mine Development and Production Agreements (CMDPAs) for these mines were earlier signed on 21 August 2025. The three blocks include Rajgamar Dipside (Deavnara), Tangardihi North, and Mahuagarhi. Of these, two are partially explored while one is fully explored, with a combined peak rated capacity of around 1 MTPA and geological reserves of approximately 1,484.41 million tonnes. These mines are expected to generate annual revenue of abou..

Next Story
Infrastructure Urban

TEC, IIT-Hyderabad Partner to Boost 6G and Telecom Standards

The Telecommunication Engineering Centre (TEC), technical arm of the Department of Telecommunications (DoT), has signed a Memorandum of Understanding (MoU) with the Indian Institute of Technology Hyderabad (IIT Hyderabad) for joint research and technical collaboration in advanced telecom technologies and standardisation. The partnership focuses on developing India-specific standards and test frameworks for next-generation networks, including 6G, Artificial Intelligence (AI), and Non-Terrestrial Networks (NTNs). It also aims to enhance India’s participation in international standardisation f..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?