+
Torrent Power implements green hydrogen pilot project for CGD network
POWER & RENEWABLE ENERGY

Torrent Power implements green hydrogen pilot project for CGD network

Torrent Power announced that it is currently engaged in a pilot initiative to combine green hydrogen with natural gas in the city gas distribution (CGD) network. The pilot project is taking place in Gorakhpur, Uttar Pradesh, and is expected to be completed within eight months, as stated by the company.

In their official statement, Torrent Power stated, "We are in the process of implementing a pilot project to introduce green hydrogen blending into the CGD network. This significant milestone in our venture into the green hydrogen business in India utilises an alkaline electrolyser to blend 2.5 per cent green hydrogen (GH2) into the CGD network."

Green hydrogen, or GH2, is created through the electrolysis of water using renewable energy sources. By integrating GH2 into the existing natural gas supply, a gradual shift toward a cleaner and more sustainable energy mix can be achieved.

Torrent Power holds a prominent position in the power sector of the country, being one of the largest companies involved in the entire power value chain, which includes generation, transmission, and distribution. 

Torrent Power announced that it is currently engaged in a pilot initiative to combine green hydrogen with natural gas in the city gas distribution (CGD) network. The pilot project is taking place in Gorakhpur, Uttar Pradesh, and is expected to be completed within eight months, as stated by the company.In their official statement, Torrent Power stated, We are in the process of implementing a pilot project to introduce green hydrogen blending into the CGD network. This significant milestone in our venture into the green hydrogen business in India utilises an alkaline electrolyser to blend 2.5 per cent green hydrogen (GH2) into the CGD network.Green hydrogen, or GH2, is created through the electrolysis of water using renewable energy sources. By integrating GH2 into the existing natural gas supply, a gradual shift toward a cleaner and more sustainable energy mix can be achieved.Torrent Power holds a prominent position in the power sector of the country, being one of the largest companies involved in the entire power value chain, which includes generation, transmission, and distribution. 

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App