Engineered Flooring
Products

Engineered Flooring

Lamiwood has launched Holz Parket engineered hardwood flooring with patented Valinge 2G locking technology from Sweden. The floors are available in 15 mm thickness with 4 mm of wood top layer in different patterns and designs in engineered flooring like chevron, herringbone and long planks. Its...

Lamiwood has launched Holz Parket engineered hardwood flooring with patented Valinge 2G locking technology from Sweden. The floors are available in 15 mm thickness with 4 mm of wood top layer in different patterns and designs in engineered flooring like chevron, herringbone and long planks. Its three-layer construction with click locking does not need any sub-floor, plywood base, nails, staples or glue. It comes with dent-proof, scratch-resistance, fire-proof and cigarette butt-resistant. Holz Parket hardwood flooring features real wood brushed surface with variation is grains and real wood variation.Contact: Lamiwood. Mobile: (0) 99995 00117.Website: www.lamiwood.in

Next Story
Infrastructure Transport

Hyderabad Metro Phase 2 DPRs Near Completion

Telangana Chief Secretary K. Ramakrishna Rao announced that the Detailed Project Reports (DPRs) for Phase-II (Part B) of the Hyderabad Metro Rail project are in their final stages. These reports will be reviewed at the upcoming Hyderabad Airport Metro Limited (HAML) board meeting before being submitted for state approval and eventually forwarded to the Central government.The corridors being finalised include JBS–Medchal (24.5 km), JBS–Shamirpet (22 km), and Shamshabad–Future City (40 km). Meanwhile, the state is awaiting central clearance for Phase-II Part A, which includes five corridor..

Next Story
Infrastructure Transport

DPRs for Hyderabad Metro Phase 2B Near Completion

The Detailed Project Reports (DPRs) for Phase-II (Part B) of the Hyderabad Metro Rail are nearing completion, Telangana Chief Secretary K. Ramakrishna Rao said. These DPRs will soon be reviewed by the board of Hyderabad Airport Metro Limited (HAML), after which they will be sent for state approval before being submitted to the Central government.The reports cover three key corridors: JBS–Medchal (24.5 km), JBS–Shamirpet (22 km), and Shamshabad–Future City (40 km). Meanwhile, the state is still awaiting central clearance for Phase-II Part A, which includes five corridors spanning 76.4 km ..

Next Story
Infrastructure Transport

Kanpur, Agra Metro Corridor-1 to Finish by Dec 2025

Metro rail construction in Kanpur and Agra is advancing steadily, with Corridor-1 in both cities slated for completion by December 2025.In Kanpur, the 6.7-kilometre underground stretch from Kanpur Central to Moti Jheel is now fully completed. Overall, 72 per cent of work on Corridor-1—stretching from IIT Kanpur to Naubasta—is done, and the remaining work remains on schedule to wrap up by year-end. Currently, a 15-kilometre section of the Kanpur Metro is already operational.Simultaneously, the Agra Metro’s 14.27-kilometre Corridor-1—from Sikandra to Taj East Gate—has reached 52 per ce..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?