Ditch Witch’s microtrencher attachment for mini skid steers
Equipment

Ditch Witch’s microtrencher attachment for mini skid steers

Ditch Witch’s new MT164 Microtrencher attachment, the company’s first SK-series stand-on skid steer compatible unit, is engineered to create clean, narrow trenches for compact cable installation in one pass.

The attachment uses a standard hydraulic plunge to provide variable depth control and can trench up to 2 inches wide and down to 16 inches deep. This allows contractors to cut deep enough to get through a standard-sized curb.

The saw can be placed on the left, right or center of the plate and used in a push or pull application depending on the jobsite. The “push or pull” design eliminates the need to remove the saw from the ground, the company says, creating minimal ground disturbance and a cleaner finish.

The attachment can be equipped with various blades including standard carbide-tipped blades and Ditch Witch PDC blades with diamond-embedded carbide.

The HX75 vacuum excavator can be attached to the microtrencher to suck up spoils and dirt, reducing labor expenses and creating efficiency, Ditch Witch says. If the vacuum excavator is not available, other dust control methods should be used.

Ditch Witch’s new MT164 Microtrencher attachment, the company’s first SK-series stand-on skid steer compatible unit, is engineered to create clean, narrow trenches for compact cable installation in one pass. The attachment uses a standard hydraulic plunge to provide variable depth control and can trench up to 2 inches wide and down to 16 inches deep. This allows contractors to cut deep enough to get through a standard-sized curb. The saw can be placed on the left, right or center of the plate and used in a push or pull application depending on the jobsite. The “push or pull” design eliminates the need to remove the saw from the ground, the company says, creating minimal ground disturbance and a cleaner finish. The attachment can be equipped with various blades including standard carbide-tipped blades and Ditch Witch PDC blades with diamond-embedded carbide. The HX75 vacuum excavator can be attached to the microtrencher to suck up spoils and dirt, reducing labor expenses and creating efficiency, Ditch Witch says. If the vacuum excavator is not available, other dust control methods should be used.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?