Ahmedabad City Square to Feature 175-Metre Tower
Real Estate

Ahmedabad City Square to Feature 175-Metre Tower

Ahmedabad Municipal Corporation (AMC) has issued a tender for Ahmedabad City Square, a proposed landmark on Sindhu Bhavan Road estimated to cost Rs. 5.7 bn. The project will include a 175-metre tower modelled on Dubai’s Jumeirah Skyline and is intended to give Ahmedabad a new identity through public, cultural and commercial facilities.

The development will have lower-ground and upper-ground levels. The lower ground will include shops and an art gallery, while the upper ground will feature an urban plaza, food kiosks at all four corners, a garden, food court, water fountain and an amphitheatre with seating for 310 people.

A two-storey restaurant will be developed at a height of about 40 metres in the tower, with seating for approximately 1,200 people. Above it, a terrace-deck café will accommodate around 200 people, with about 6,485 square metres of circular construction planned for the facility at the same height.

The top of the tower will have a sky deck and skywalk at an estimated height of 175 metres, providing panoramic views of Ahmedabad. The viewing gallery will accommodate around 75 people at a time, while a large digital screen extending between 40 metres and 175 metres will support continuous advertisements.

The project will also include three basements reaching about 15 metres below ground level, with parking for 1,500 vehicles. A further 450 vehicles will be accommodated on the corporation’s plot opposite the site. AMC issued the tender on 25 October 2026 and plans an orientation meeting, along with two pre-bid meetings, before finalising the contractor. Once awarded, the work is scheduled for completion within 42 months, or 3.5 years.

Ahmedabad Municipal Corporation (AMC) has issued a tender for Ahmedabad City Square, a proposed landmark on Sindhu Bhavan Road estimated to cost Rs. 5.7 bn. The project will include a 175-metre tower modelled on Dubai’s Jumeirah Skyline and is intended to give Ahmedabad a new identity through public, cultural and commercial facilities. The development will have lower-ground and upper-ground levels. The lower ground will include shops and an art gallery, while the upper ground will feature an urban plaza, food kiosks at all four corners, a garden, food court, water fountain and an amphitheatre with seating for 310 people. A two-storey restaurant will be developed at a height of about 40 metres in the tower, with seating for approximately 1,200 people. Above it, a terrace-deck café will accommodate around 200 people, with about 6,485 square metres of circular construction planned for the facility at the same height. The top of the tower will have a sky deck and skywalk at an estimated height of 175 metres, providing panoramic views of Ahmedabad. The viewing gallery will accommodate around 75 people at a time, while a large digital screen extending between 40 metres and 175 metres will support continuous advertisements. The project will also include three basements reaching about 15 metres below ground level, with parking for 1,500 vehicles. A further 450 vehicles will be accommodated on the corporation’s plot opposite the site. AMC issued the tender on 25 October 2026 and plans an orientation meeting, along with two pre-bid meetings, before finalising the contractor. Once awarded, the work is scheduled for completion within 42 months, or 3.5 years.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

DMRC Invites Bids for Solar-Linked BESS Power Procurement

Delhi Metro Rail Corporation (DMRC) has invited bids for renewable energy from an Inter-State Transmission System (ISTS)-connected generating plant combining a solar photovoltaic (PV) system with a co-located Battery Energy Storage System (BESS). The procurement will be conducted through competitive bidding followed by an e-reverse auction. The last date for submitting online bids is December 10, 2026, at 3 PM. DMRC will open the technical bids on December 11, 2026, at 3 PM. The opening of financial bids and the e-reverse auction will be scheduled after completion of the technical evaluation. ..

Next Story
Infrastructure Energy

Solar Growth May Slow Beyond FY28 on Awards, Grid Constraints

India’s solar capacity growth could face headwinds beyond FY28 as slower renewable energy project awards, delays in signing power agreements and transmission constraints threaten expansion, according to a report by Yes Securities. Near-term additions remain supported by a construction pipeline exceeding 150 GW and rising rooftop installations, but weaker award activity could affect capacity additions and industry volumes in FY29 and FY30. Solar capacity additions nearly doubled to 44.61 GW in FY26 from 23.83 GW in FY25. Installations remained strong in the first half of FY27, when 21 GW of s..

Next Story
Infrastructure Transport

India’s First High-Speed Rail Service to Begin in 2027

India’s first high-speed rail service will commence in 2027, with the Surat-Vapi section of the Mumbai-Ahmedabad High-Speed Rail corridor scheduled to open first, Railway Minister Ashwini Vaishnaw said. The remaining sections to Mumbai will be opened in phases. Vaishnaw said 456 km of pier work and 371 km of viaduct construction had been completed by September. About 600,000 noise barriers had been installed along a 299 km stretch, while 9,300 overhead equipment masts had been erected across a 206 km viaduct. Four mountain tunnels have been excavated, and 5 km of the 21 km Maharashtra tunnel..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code