L&T wins contracts for buildings and factories biz
Real Estate

L&T wins contracts for buildings and factories biz

The Buildings & Factories Business of L&T Construction has secured an order to construct a new Medical College & Hospital at Golaghat, Assam from the Government of Assam on an engineering, procurement and construction (EPC) Basis. The facility will include a 430-bed teaching hospital, an academic block to cater to an annual intake of 100 nos., an autopsy block, a private ward, hostel and residential facilities. The project is to be executed as per NMC norms and in 36 months. The total built up area will be 9.44 lakh sq. ft.

The scope of work involves piling, civil structure, finishes and allied MEP services including supply, installation, testing and commissioning of medical gas piping, modular OT, etc., and external development works including area development works.

The business has also secured an order from a prestigious client to construct commercial office space at Bengaluru with an approximate built-up area of 10 Lakh Sq. ft. The project scope includes design and builds civil works for the composite structure of 3B+G+12 floors. The project is envisaged to be designed, coordinated and monitored digitally using BIM “Build & Collaboration module” and must be completed in 12 months.

Further, the business has also secured add-on orders for various ongoing projects in the segments of airports, public spaces, factories, office spaces and data centres.


The Buildings & Factories Business of L&T Construction has secured an order to construct a new Medical College & Hospital at Golaghat, Assam from the Government of Assam on an engineering, procurement and construction (EPC) Basis. The facility will include a 430-bed teaching hospital, an academic block to cater to an annual intake of 100 nos., an autopsy block, a private ward, hostel and residential facilities. The project is to be executed as per NMC norms and in 36 months. The total built up area will be 9.44 lakh sq. ft. The scope of work involves piling, civil structure, finishes and allied MEP services including supply, installation, testing and commissioning of medical gas piping, modular OT, etc., and external development works including area development works. The business has also secured an order from a prestigious client to construct commercial office space at Bengaluru with an approximate built-up area of 10 Lakh Sq. ft. The project scope includes design and builds civil works for the composite structure of 3B+G+12 floors. The project is envisaged to be designed, coordinated and monitored digitally using BIM “Build & Collaboration module” and must be completed in 12 months. Further, the business has also secured add-on orders for various ongoing projects in the segments of airports, public spaces, factories, office spaces and data centres.

Next Story
Infrastructure Transport

Buying a TBM?

Tunnel-boring machines (TBMs) are increasingly being used in India for metro, rail and other infrastructure projects. Choosing the right TBM is vital to work efficiently, speedily and safely. Here’s a guide on how to make the right choice.Geological compatibilityTBMs are specifically designed and customised to suit the unique geological and geotechnical conditions of the area where tunnelling will take place. So, an extensive and thorough geotechnical investigation is conducted prior to the machine’s design and fabrication. “The tunnelling company accurately compiles soil sampling f..

Next Story
Real Estate

Kitchen Dynamics

Modular kitchen design trends lean towards sustainability, smart technology integration, minimalist aesthetics and multifunctional spaces, says Rajkumar Kumawat, Founder and Principal Architect, Rajkumar Architects.Noticeable designs“A shift towards warm minimalism, where clean lines are balanced with tactile finishes such as fluted wood, brushed metals and muted stone surfaces, is a noticeable trend,” says Harkaran Singh Boparai, Founder and Principal Architect, Harkaran Boparai Studio. “Also, matte lacquers in deep, earthy tones are replacing gloss finishes, bringing a s..

Next Story
Real Estate

Redevelopment Rush

Mumbai is on the cusp of an urban transformation, driven by the pressing need to replace ageing, unsafe buildings with modern, high-density developments. The scale and pace of redevelopment across the city is unprecedented – and yet fraught with complexity.Redevelopment has become a defining strategy for urban renewal in Mumbai. One of the most challenging aspects is the displacement it entails – residents are often required to vacate their homes and live in transit accommodations until the new structures are ready. This raises valid concerns: Will the transit housing meet our needs? Will ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?