+
Open House on Steel Import to be Held by Ministry of Steel on 26th Dec
Steel

Open House on Steel Import to be Held by Ministry of Steel on 26th Dec

An open house will be conducted by the Ministry of Steel between 11 AM to 5 PM on 26th December in Steel Room, 3rd Floor, GPOA- 3, Netaji Nagar in New Delhi to discuss issues related to the import of steel.

Any issues or grievances faced by companies and associations related to these topics may be aired here. As logistic challenges prevent walk-in participation, only one representative of an organisation is permitted into the event.

To take part in the Open House and get a specific time slot on the date, send an e-mail to tech-steel@nic.in. While writing the e-mail, the following information may be included:

1. Company/Association Name 2. Issues related to Steel Import Monitoring System/SARAL Steel Import Monitoring System/Quality Control Order Exemption 3. Participant Name and Designation (No Third Party Representation Allowed) 4. Reference of Steel Import Monitoring System/SARAL Steel Import Monitoring System/Quality Control Order Exemption Application (if any) 5. Type of Industry and Product 6. Maximum 50 Word Description of Issue 7. Mobile Number and Email of Participant.

Any company or association having issues related to Steel Import Monitoring System/SARAL Steel Import Monitoring System/Quality Control Order Exemption should send their request to the specified e-mail by 6 PM on 22nd December to get their desired time slot.

An open house will be conducted by the Ministry of Steel between 11 AM to 5 PM on 26th December in Steel Room, 3rd Floor, GPOA- 3, Netaji Nagar in New Delhi to discuss issues related to the import of steel. Any issues or grievances faced by companies and associations related to these topics may be aired here. As logistic challenges prevent walk-in participation, only one representative of an organisation is permitted into the event. To take part in the Open House and get a specific time slot on the date, send an e-mail to tech-steel@nic.in. While writing the e-mail, the following information may be included: 1. Company/Association Name 2. Issues related to Steel Import Monitoring System/SARAL Steel Import Monitoring System/Quality Control Order Exemption 3. Participant Name and Designation (No Third Party Representation Allowed) 4. Reference of Steel Import Monitoring System/SARAL Steel Import Monitoring System/Quality Control Order Exemption Application (if any) 5. Type of Industry and Product 6. Maximum 50 Word Description of Issue 7. Mobile Number and Email of Participant. Any company or association having issues related to Steel Import Monitoring System/SARAL Steel Import Monitoring System/Quality Control Order Exemption should send their request to the specified e-mail by 6 PM on 22nd December to get their desired time slot.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App