+
Asia’s longest flyover in Nagpur unveiled by Union Minister Nitin Gadkari
ROADS & HIGHWAYS

Asia’s longest flyover in Nagpur unveiled by Union Minister Nitin Gadkari

In a ground-breaking moment for infrastructure, Union Minister Nitin Gadkari inaugurated Asia's longest double-decker flyover, which also features the continent's first four-tier structure.

The engineering marvel near Gaddigodam Gurudwara on National Highway, integrates four different levels of transit, with a Metro line at the top, followed by a flyover, a railway track beneath it, and finally, a road at the base at a single location.

The 5.6 km double-decker Kamptee Road flyover from LIC Square to Automotive Square, constructed by Maha Metro and National Highway Authority of India (NHAI) at a cost of Rs.5.73 billion now surpasses the earlier record held by Nagpur's 3.14 km Wardha Road flyover.

Gadkari highlighted the potential of adopting ultra-reinforced concrete technology, which is widely used in Singapore and Malaysia, for upcoming infrastructure projects. He emphasised that NHAI has invested between Rs13 billion and Rs14 billion in Nagpur's three major flyovers – Kamptee Road, Wardha Road and Pardi.

The minister also lauded Nagpur Metro for setting a new benchmark in Metro construction, achieving costs of Rs.3.5 billion per km, which is significantly lower than those in other Indian cities. This flyover stands as a testament to modern engineering, blending innovation and functionality to address the growing needs of urban transit.

Your next big infra connection is waiting at RAHSTA 2025 – Asia’s Biggest Roads & Highways Expo, Jio World Convention Centre, Mumbai. Don’t miss out!

In a ground-breaking moment for infrastructure, Union Minister Nitin Gadkari inaugurated Asia's longest double-decker flyover, which also features the continent's first four-tier structure.The engineering marvel near Gaddigodam Gurudwara on National Highway, integrates four different levels of transit, with a Metro line at the top, followed by a flyover, a railway track beneath it, and finally, a road at the base at a single location.The 5.6 km double-decker Kamptee Road flyover from LIC Square to Automotive Square, constructed by Maha Metro and National Highway Authority of India (NHAI) at a cost of Rs.5.73 billion now surpasses the earlier record held by Nagpur's 3.14 km Wardha Road flyover.Gadkari highlighted the potential of adopting ultra-reinforced concrete technology, which is widely used in Singapore and Malaysia, for upcoming infrastructure projects. He emphasised that NHAI has invested between Rs13 billion and Rs14 billion in Nagpur's three major flyovers – Kamptee Road, Wardha Road and Pardi.The minister also lauded Nagpur Metro for setting a new benchmark in Metro construction, achieving costs of Rs.3.5 billion per km, which is significantly lower than those in other Indian cities. This flyover stands as a testament to modern engineering, blending innovation and functionality to address the growing needs of urban transit.

Next Story
Real Estate

Mumbai Records 11,230 Property Deals in August 2025

Mumbai’s property market remained resilient in August 2025, with 11,230 property registrations recorded under the Brihanmumbai Municipal Corporation (BMC) jurisdiction, according to data released by Knight Frank India. While this marks a 3 per cent year-on-year (YoY) decline compared to 11,631 registrations in August 2024, activity stayed robust despite the marginal dip.On a month-on-month (MoM) basis, registrations fell 11 per cent from 12,579 deals in July 2025, indicating seasonal moderation. However, the city’s stamp duty collections still reached Rs 10 billion, reflecting a 6 per cent..

Next Story
Infrastructure Transport

68 Jammu-Katra Trains Cancelled Amid Rain Damage

Jammu and Katra railway services remain severely affected as Northern Railway announced the cancellation of 68 trains—both incoming and outgoing—until 30 September, due to extensive track damage caused by heavy rains and flash floods. Meanwhile, 24 trains are scheduled to resume operations gradually.The Jammu railway division has experienced a complete halt in services for the past eight days, following track misalignment and breaches at several points along the Pathankot–Jammu section. Torrential rainfall since 26 August led to widespread flooding and damage, stranding hundreds of passe..

Next Story
Infrastructure Transport

Bangalore Metro MD Reviews Reach 6 and Phase 2A Progress

Bangalore Metro Rail Corporation Limited (BMRCL) Managing Director, Dr J Ravishankar, IAS, conducted inspections of key metro corridors on 29 and 30 August, reviewing the progress of Reach 6 (Pink Line) and Phase 2A (Blue Line).On 30 August, the inspection covered Reach 6, a 21.39-km corridor stretching from Kalena Agrahara to Nagawara, with 18 stations. This stretch is part of Phase 2 of the Bangalore Metro project. Dr Ravishankar assessed the status of civil works, finishing, track laying, and system integration between Kalena Agrahara and MG Road.Earlier, on 29 August, the MD inspected Phas..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?