Assam Announces Rs 1.5 bn Flood Mitigation Project For Jorabat
ROADS & HIGHWAYS

Assam Announces Rs 1.5 bn Flood Mitigation Project For Jorabat

Assam Chief Minister Himanta Biswa Sarma announced a Rs 1.5 billion (Rs 1.5 bn) flood mitigation project for Jorabat during the Budget Session of the state legislative assembly. The Detailed Project Report for the proposed Guwahati Ring Road has earmarked the funding specifically for flood control works in Jorabat and consultants have been instructed to prepare technical designs. The consultants have also been asked to secure approval from the Indian Institute of Technology Guwahati to ensure the quality and effectiveness of the measures.

The chief minister said recent flash floods had inundated several localities and disrupted traffic, highlighting the need for permanent engineering measures rather than temporary relief. The initiative is intended to provide a long-term solution to recurring flash floods and reduce risk once the works are completed. The chief minister expressed confidence that the project would substantially lower the incidence of flash flooding in the area.

Addressing traffic congestion, the government noted that Jorabat has become one of Assam's busiest transport corridors due to its position on the Assam–Meghalaya border and increasing vehicular movement. To ease congestion the state has proposed widening the Digaru–Narangi road into a four-lane highway to provide an alternative approach for vehicles travelling from Jagiroad and nearby areas to Guwahati and to reduce pressure on the Jorabat junction. The chief minister urged legislators from the Dimoria and Dispur constituencies to support land acquisition and other requirements for the road expansion.

The measures form part of a broader plan to strengthen urban infrastructure across the Guwahati metropolitan region, combining improved transport connectivity with better drainage systems and climate-resilient design. Implementation will follow finalisation of designs, technical approvals and necessary land arrangements to enable construction. Officials indicated the package aims to integrate flood control with transport upgrades to deliver durable benefits for residents and commuters.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Assam Chief Minister Himanta Biswa Sarma announced a Rs 1.5 billion (Rs 1.5 bn) flood mitigation project for Jorabat during the Budget Session of the state legislative assembly. The Detailed Project Report for the proposed Guwahati Ring Road has earmarked the funding specifically for flood control works in Jorabat and consultants have been instructed to prepare technical designs. The consultants have also been asked to secure approval from the Indian Institute of Technology Guwahati to ensure the quality and effectiveness of the measures. The chief minister said recent flash floods had inundated several localities and disrupted traffic, highlighting the need for permanent engineering measures rather than temporary relief. The initiative is intended to provide a long-term solution to recurring flash floods and reduce risk once the works are completed. The chief minister expressed confidence that the project would substantially lower the incidence of flash flooding in the area. Addressing traffic congestion, the government noted that Jorabat has become one of Assam's busiest transport corridors due to its position on the Assam–Meghalaya border and increasing vehicular movement. To ease congestion the state has proposed widening the Digaru–Narangi road into a four-lane highway to provide an alternative approach for vehicles travelling from Jagiroad and nearby areas to Guwahati and to reduce pressure on the Jorabat junction. The chief minister urged legislators from the Dimoria and Dispur constituencies to support land acquisition and other requirements for the road expansion. The measures form part of a broader plan to strengthen urban infrastructure across the Guwahati metropolitan region, combining improved transport connectivity with better drainage systems and climate-resilient design. Implementation will follow finalisation of designs, technical approvals and necessary land arrangements to enable construction. Officials indicated the package aims to integrate flood control with transport upgrades to deliver durable benefits for residents and commuters.

Next Story
Infrastructure Transport

Uttar Pradesh Accelerates National Highway Projects

Uttar Pradesh Chief Minister Yogi Adityanath met Union Road Transport and Highways Minister Nitin Gadkari to review National Highway and road infrastructure projects. Officials from the National Highways Authority of India presented progress updates and proposals. Ministers directed acceleration of land acquisition, forest clearances, utility shifting and other formalities to expedite delivery. Officials said that since 2014 about 10,204 kilometres of National Highway projects have been awarded and nearly 9,329 kilometres completed, with 606 kilometres approved and 1,010 kilometres completed b..

Next Story
Infrastructure Transport

NHAI Completes Repairs at 33 of 40 Spots Along Gurugram NH-48

The National Highways Authority of India has rectified 33 of 40 deficient locations along an 11km stretch of the Delhi–Gurugram NH-48 corridor, following a joint inspection by the authority, the Municipal Corporation of Gurugram and the Gurugram Metropolitan Development Authority. The audit identified damaged footpaths, crash barriers, inadequate lane markings and poor sanitation at multiple points between Rajiv Chowk and Signature Towers. Repairs and maintenance works have been carried out over May and June as part of the exercise. The report noted broken crash barriers and roadside litteri..

Next Story
Infrastructure Urban

Mankhurd Maharashtra Nagar Flyover To Open By August 2027

The Brihanmumbai Municipal Corporation has said the Mankhurd-Maharashtra Nagar flyover will be operational by August 2027, as part of measures to ease congestion in the eastern suburbs. The structure will provide a direct link from the T Junction on the Sion-Panvel highway to the existing Ghatkopar-Mankhurd Link Road. The T Junction is one of the major traffic choke points in the eastern suburbs and records heavy flows of vehicles travelling to and from Navi Mumbai and Pune. Motorists currently spend more than 15 minutes at the signal during peak periods, according to civic data, prompting the..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement