Assam Announces Rs 1.5 bn Flood Mitigation Project For Jorabat
ROADS & HIGHWAYS

Assam Announces Rs 1.5 bn Flood Mitigation Project For Jorabat

Assam Chief Minister Himanta Biswa Sarma announced a Rs 1.5 billion (Rs 1.5 bn) flood mitigation project for Jorabat during the Budget Session of the state legislative assembly. The Detailed Project Report for the proposed Guwahati Ring Road has earmarked the funding specifically for flood control works in Jorabat and consultants have been instructed to prepare technical designs. The consultants have also been asked to secure approval from the Indian Institute of Technology Guwahati to ensure the quality and effectiveness of the measures.

The chief minister said recent flash floods had inundated several localities and disrupted traffic, highlighting the need for permanent engineering measures rather than temporary relief. The initiative is intended to provide a long-term solution to recurring flash floods and reduce risk once the works are completed. The chief minister expressed confidence that the project would substantially lower the incidence of flash flooding in the area.

Addressing traffic congestion, the government noted that Jorabat has become one of Assam's busiest transport corridors due to its position on the Assam–Meghalaya border and increasing vehicular movement. To ease congestion the state has proposed widening the Digaru–Narangi road into a four-lane highway to provide an alternative approach for vehicles travelling from Jagiroad and nearby areas to Guwahati and to reduce pressure on the Jorabat junction. The chief minister urged legislators from the Dimoria and Dispur constituencies to support land acquisition and other requirements for the road expansion.

The measures form part of a broader plan to strengthen urban infrastructure across the Guwahati metropolitan region, combining improved transport connectivity with better drainage systems and climate-resilient design. Implementation will follow finalisation of designs, technical approvals and necessary land arrangements to enable construction. Officials indicated the package aims to integrate flood control with transport upgrades to deliver durable benefits for residents and commuters.

Assam Chief Minister Himanta Biswa Sarma announced a Rs 1.5 billion (Rs 1.5 bn) flood mitigation project for Jorabat during the Budget Session of the state legislative assembly. The Detailed Project Report for the proposed Guwahati Ring Road has earmarked the funding specifically for flood control works in Jorabat and consultants have been instructed to prepare technical designs. The consultants have also been asked to secure approval from the Indian Institute of Technology Guwahati to ensure the quality and effectiveness of the measures. The chief minister said recent flash floods had inundated several localities and disrupted traffic, highlighting the need for permanent engineering measures rather than temporary relief. The initiative is intended to provide a long-term solution to recurring flash floods and reduce risk once the works are completed. The chief minister expressed confidence that the project would substantially lower the incidence of flash flooding in the area. Addressing traffic congestion, the government noted that Jorabat has become one of Assam's busiest transport corridors due to its position on the Assam–Meghalaya border and increasing vehicular movement. To ease congestion the state has proposed widening the Digaru–Narangi road into a four-lane highway to provide an alternative approach for vehicles travelling from Jagiroad and nearby areas to Guwahati and to reduce pressure on the Jorabat junction. The chief minister urged legislators from the Dimoria and Dispur constituencies to support land acquisition and other requirements for the road expansion. The measures form part of a broader plan to strengthen urban infrastructure across the Guwahati metropolitan region, combining improved transport connectivity with better drainage systems and climate-resilient design. Implementation will follow finalisation of designs, technical approvals and necessary land arrangements to enable construction. Officials indicated the package aims to integrate flood control with transport upgrades to deliver durable benefits for residents and commuters.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code