+
Bids for DPR consultant for integrated bus terminal in Nagercoil
ROADS & HIGHWAYS

Bids for DPR consultant for integrated bus terminal in Nagercoil

The Tamil Nadu Urban Infrastructure Financial Services (TNUIFSL) has invited consultants to submit bids for the preparation of a detailed project report (DPR) for the construction of a modern integrated bus terminal for the Nagercoil City Municipal Corporation.

The chosen consultant will be responsible for preparing the DPR based on the site assessment, technical, financial, environmental, and social aspects, which will include detailed designs and drawings (structural, architectural, and working drawings). Carrying out necessary traffic surveys, proposing necessary infrastructures such as skywalks, cross over bridges, approach roads, and others, carrying out necessary investigations to design and construct basic infrastructure such as road network, passenger amenities, water supply, and allied works are also part of the job.

The final date for bid submission is May 3, 2023.

Also Read

The Tamil Nadu Urban Infrastructure Financial Services (TNUIFSL) has invited consultants to submit bids for the preparation of a detailed project report (DPR) for the construction of a modern integrated bus terminal for the Nagercoil City Municipal Corporation.The chosen consultant will be responsible for preparing the DPR based on the site assessment, technical, financial, environmental, and social aspects, which will include detailed designs and drawings (structural, architectural, and working drawings). Carrying out necessary traffic surveys, proposing necessary infrastructures such as skywalks, cross over bridges, approach roads, and others, carrying out necessary investigations to design and construct basic infrastructure such as road network, passenger amenities, water supply, and allied works are also part of the job.The final date for bid submission is May 3, 2023.Also ReadCement demand is seen rising 8-9% in FY24Green flag for new airport at Sabarimala

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code