Citywide Coastal Road to relieve traffic on the Sion Panvel Expressway
ROADS & HIGHWAYS

Citywide Coastal Road to relieve traffic on the Sion Panvel Expressway

The City and Industrial Development Corporation's (CIDCO) proposal for a coastal road from Jalmarg (Sector 16 Kharghar) to Sector 11 in the CBD and a balance link between Sector 15 CBD and the water transport terminal in Nerul has been approved by the Maharashtra Coastal Zone Management Authority (MCZMA) to relieve traffic on the Sion-Panvel Expressway. The primary route connecting Navi Mumbai and Mumbai will be the Mumbai Trans Harbour Link with Sewri Nhava connector.

The construction of the Kharghar Coastal Road link will allow for the easiest and fastest access between the ICP Business Centre and the Navi Mumbai International Airport as well as South and Central Mumbai. It will support Navi Mumbai's expansion as a rival business district to south Mumbai.

The project site is located inside the Coastal Regulation Zone, as well as Areas IA, IB, II, and IVB. 9.679 km of the proposed route is made up of the current road, or 2.986 km. The planned road combines both of the alternatives—a stilt-on-road and a ground-level road proposed via reclamation. It is a part of the development plan for Navi Mumbai.

However, the MCZMA has established 20 requirements. Additionally, because the project entails chopping down mangroves, CIDCO will need to obtain a previous approval from the Bombay High Court. Additionally, the development body will need to get a no objection certificate from the Fisheries Commissioner and proactively take suitable steps to decrease and offset the road's impact on nearby fishing.

Also read:
Nariman Point–Cuffe Parade Bridge receives two bidders
Expansion of Virar Dahanu railway to begin


The City and Industrial Development Corporation's (CIDCO) proposal for a coastal road from Jalmarg (Sector 16 Kharghar) to Sector 11 in the CBD and a balance link between Sector 15 CBD and the water transport terminal in Nerul has been approved by the Maharashtra Coastal Zone Management Authority (MCZMA) to relieve traffic on the Sion-Panvel Expressway. The primary route connecting Navi Mumbai and Mumbai will be the Mumbai Trans Harbour Link with Sewri Nhava connector. The construction of the Kharghar Coastal Road link will allow for the easiest and fastest access between the ICP Business Centre and the Navi Mumbai International Airport as well as South and Central Mumbai. It will support Navi Mumbai's expansion as a rival business district to south Mumbai. The project site is located inside the Coastal Regulation Zone, as well as Areas IA, IB, II, and IVB. 9.679 km of the proposed route is made up of the current road, or 2.986 km. The planned road combines both of the alternatives—a stilt-on-road and a ground-level road proposed via reclamation. It is a part of the development plan for Navi Mumbai. However, the MCZMA has established 20 requirements. Additionally, because the project entails chopping down mangroves, CIDCO will need to obtain a previous approval from the Bombay High Court. Additionally, the development body will need to get a no objection certificate from the Fisheries Commissioner and proactively take suitable steps to decrease and offset the road's impact on nearby fishing.Also read: Nariman Point–Cuffe Parade Bridge receives two bidders Expansion of Virar Dahanu railway to begin

Next Story
Resources

Haworth India Hosts Women’s Leadership Panel Series

Haworth India marked International Women’s Day by hosting a leadership roundtable series titled ‘Give to Gain’, bringing together senior women leaders from architecture and design firms, corporates and project management consultancies. The series has been conducted in Delhi and Mumbai, with upcoming sessions scheduled in Bengaluru and Hyderabad on 27 March 2026. Structured as moderated panel discussions followed by audience interaction, the initiative examined the business impact of women’s leadership and the role of inclusive workplaces in supporting professional growth. Manish Khan..

Next Story
Real Estate

Max Estates Secures RERA For Max One Project

Max Estates has secured RERA approval (UPRERA No.: UPRERAPRJ9759) for its Max One development around Max Towers in Sector 16B, Noida, bringing renewed progress to a project previously stalled following the insolvency of its earlier developer. Spread across around 10 acres with an estimated development potential of about 2.5 million sq ft, Max One is planned as an integrated mixed-use campus combining serviced residences, premium offices, retail spaces and a private club. The project is expected to generate total sales potential of about Rs 20 billion along with an estimated annuity rental inc..

Next Story
Real Estate

Hindware Introduces Starc Smart Wall Mount Toilet

Hindware has introduced the Starc Smart Wall-Mount Toilet under its Hindware Italian Collection, designed to combine automation, hygiene and contemporary bathroom aesthetics. The model features automatic flushing, sensor-based seat opening and closing, and remote-controlled functions. It also includes an oscillating water spray and warm air dryer for cleaning, along with a self-cleaning nozzle designed to maintain hygiene. Additional features include adjustable heated seating, customisable water temperature and pressure settings, a foot-touch flush system and an LCD control interface. The wa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement