Model road with intelligent transport system to be developed in Noida
ROADS & HIGHWAYS

Model road with intelligent transport system to be developed in Noida

A model road with an intelligent transport system will be developed in Noida near Sector 71 on the lines of megacities across the globe. According to the traffic volume, the Authority will convert a 4 km-long stretch on the Master Plan 3 road into a model road zone with sensor-based signals to allow the movement of vehicles and pedestrians.

The officials told the media that the project could be extended to other parts of the city if successful.

The model road was one of the three projects Noida Authority CEO cleared on Tuesday.

Almost Rs 30 crore is going to be spent giving shape to the three projects, the others being a dog park in Sector 137 and a waste-to-wonder park on the green belt close to the Mahamaya flyover.

As per the officials, the tender document of the model road project is being finalised and will be launched within a short time. The Authority will also install public address systems at regular intervals across the stretch, Wi-Fi enabled.

Automated reflectors will also be put up that will be starting to glow in the night if a pedestrian tries to cross the road.

Facading will be done on both ends of the road, and commuters will be told in advance that they will shortly get into the model road zone to give a different feel.

The officials told the media that the wide walkways would be set up with two crossings for pedestrians on the way. Both sides will be having a tree cover and a cycle track to encourage cyclists and e-bike users.

The maximum amount of money will be utilised to build the waste-to-wonder park that will exhaust Rs 15 crore, while the model road will be developed at the cost of Rs 12 crore.

A dog park is going to be set up at the cost of Rs 3 crore. Officials told the media that the dog park and the waste-to-wonder park would be developed on the public-private partnership model while sharing the details and that the Authority would provide the land to the interested agencies and seek a share in their revenues in return.

Image Source


Also read: India's first green and safe highway to be developed in Rajasthan

A model road with an intelligent transport system will be developed in Noida near Sector 71 on the lines of megacities across the globe. According to the traffic volume, the Authority will convert a 4 km-long stretch on the Master Plan 3 road into a model road zone with sensor-based signals to allow the movement of vehicles and pedestrians. The officials told the media that the project could be extended to other parts of the city if successful. The model road was one of the three projects Noida Authority CEO cleared on Tuesday. Almost Rs 30 crore is going to be spent giving shape to the three projects, the others being a dog park in Sector 137 and a waste-to-wonder park on the green belt close to the Mahamaya flyover. As per the officials, the tender document of the model road project is being finalised and will be launched within a short time. The Authority will also install public address systems at regular intervals across the stretch, Wi-Fi enabled. Automated reflectors will also be put up that will be starting to glow in the night if a pedestrian tries to cross the road. Facading will be done on both ends of the road, and commuters will be told in advance that they will shortly get into the model road zone to give a different feel. The officials told the media that the wide walkways would be set up with two crossings for pedestrians on the way. Both sides will be having a tree cover and a cycle track to encourage cyclists and e-bike users. The maximum amount of money will be utilised to build the waste-to-wonder park that will exhaust Rs 15 crore, while the model road will be developed at the cost of Rs 12 crore. A dog park is going to be set up at the cost of Rs 3 crore. Officials told the media that the dog park and the waste-to-wonder park would be developed on the public-private partnership model while sharing the details and that the Authority would provide the land to the interested agencies and seek a share in their revenues in return. Image Source Also read: India's first green and safe highway to be developed in Rajasthan

Next Story
Building Material

Cement Makers Positive on H2 Demand Outlook

The leading cement producers have posted high single-digit volume growth and better sales realisation in the July–September quarter, setting a positive tone for the second half of FY26. Companies are upbeat on demand prospects, supported by a strong housing sector and continued government spending on major infrastructure projects. UltraTech, Ambuja Cement, Shree Cement, Dalmia Bharat and Nuvoco Vistas recorded revenue growth of up to 18 per cent in the September quarter. The rise was driven by firm realisations, softer input costs and an increased share of premium products. With coal price..

Next Story
Infrastructure Urban

Odisha Targets Role as MSME Hub for Eastern India

Odisha has set its sights on becoming the MSME gateway of eastern India, Chief Minister Mohan Charan Majhi said at the Odisha Industrial Conclave 2025, organised by Laghu Udyog Bharati (LUB). Calling the state a land of possibilities, he noted that Odisha has emerged as a leading destination for micro, small and medium enterprises.He said that reforms such as the Go-Swift single-window system now allow project approvals within a day. Odisha has also invested 6.1 per cent of its GDP in infrastructure development, which is expected to further accelerate industrial and MSME growth.Majhi emphasise..

Next Story
Infrastructure Energy

Coal Ministry Eases Process for Exploration and GR Approvals

The Ministry of Coal has introduced a simplified approval mechanism for exploration programmes and Geological Reports (GRs) for coal and lignite blocks. The reform aims to accelerate exploration activity, reduce procedural delays and strengthen India’s preparedness for rising energy demand.Under the revised process, reports prepared by Notified Accredited Prospecting Agencies (APAs) and peer-reviewed by another accredited agency no longer require approval from the committee set up in January 2022. This marks a major shift towards faster, more transparent and technology-driven exploration.By ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App