NHAI MLFF Tolling Lifts Net Revenue to Rs. 5.39 bn
ROADS & HIGHWAYS

NHAI MLFF Tolling Lifts Net Revenue to Rs. 5.39 bn

The National Highways Authority of India (NHAI) recorded net toll revenue of Rs. 5.39 bn through its multi-lane free flow (MLFF) barrier-less tolling system during the May-October period of 2026. The revenue was generated across seven operational fee plazas, representing a 19.84 per cent increase over the corresponding pre-MLFF period in 2025.

The seven plazas generated Rs. 5.39 bn in cumulative net revenue, compared with Rs. 4.5 bn during the equivalent period before the MLFF system was introduced. The comparison excludes Nemili and Chenasamudram fee plazas, which became operational in November 2026 and were therefore not part of the May-October assessment.

NHAI launched the barrier-less tolling system at Choryasi Fee Plaza in Gujarat on May 1, 2026. The system was subsequently operationalised at Mundka, Daulatpura, Gharaunda, Manoharpura, Shahjahanpur and Paranur fee plazas, taking the number of operational locations covered by the assessment to seven.

Under the MLFF arrangement, vehicles pass through tolling points without conventional barriers. The system enables toll transactions to be recorded as vehicles move through the fee plazas, while the revenue performance is measured against the earlier operating model. NHAI said transaction volumes had also registered significant growth during the period.

The authority assessed the cumulative performance of the seven plazas as of October 31, 2026. It said the results showed a 19.84 per cent increase in net revenue compared with the corresponding pre-MLFF baseline. Nemili and Chenasamudram, which went live in November, were not included in the reported revenue comparison and will form part of subsequent performance assessments.

The National Highways Authority of India (NHAI) recorded net toll revenue of Rs. 5.39 bn through its multi-lane free flow (MLFF) barrier-less tolling system during the May-October period of 2026. The revenue was generated across seven operational fee plazas, representing a 19.84 per cent increase over the corresponding pre-MLFF period in 2025. The seven plazas generated Rs. 5.39 bn in cumulative net revenue, compared with Rs. 4.5 bn during the equivalent period before the MLFF system was introduced. The comparison excludes Nemili and Chenasamudram fee plazas, which became operational in November 2026 and were therefore not part of the May-October assessment. NHAI launched the barrier-less tolling system at Choryasi Fee Plaza in Gujarat on May 1, 2026. The system was subsequently operationalised at Mundka, Daulatpura, Gharaunda, Manoharpura, Shahjahanpur and Paranur fee plazas, taking the number of operational locations covered by the assessment to seven. Under the MLFF arrangement, vehicles pass through tolling points without conventional barriers. The system enables toll transactions to be recorded as vehicles move through the fee plazas, while the revenue performance is measured against the earlier operating model. NHAI said transaction volumes had also registered significant growth during the period. The authority assessed the cumulative performance of the seven plazas as of October 31, 2026. It said the results showed a 19.84 per cent increase in net revenue compared with the corresponding pre-MLFF baseline. Nemili and Chenasamudram, which went live in November, were not included in the reported revenue comparison and will form part of subsequent performance assessments.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

JSW Motors Signs MoU with ARAI for Vehicle Development

JSW Motors, the passenger vehicle arm of JSW Group, has signed a memorandum of understanding (MoU) with the Automotive Research Association of India (ARAI) for technical collaboration on the design, validation and localisation of new energy vehicles (NEVs). The agreement is intended to create technical foundations for vehicles designed for Indian operating conditions. The companies will work on vehicle engineering and technical baselines, testing, validation and performance assessment, according to JSW Motors. Their programme will also cover advanced driver assistance systems (ADAS), battery s..

Next Story
Infrastructure Urban

Karnataka Offers Support for Toyota Expansion Plans

Karnataka Chief Minister D K Shivakumar assured Toyota Motor Corporation of the state government’s support for expanding its manufacturing operations during a meeting with the company’s senior leadership in Japan. The discussions covered higher production, new mobility solutions and further investment in Karnataka, as Toyota looks to increase vehicle production capacity to 1 mn in the near future. Shivakumar was accompanied by M B Patil, Karnataka’s Minister for Large and Medium Industries and Infrastructure Development. The Toyota delegation was led by Masakazu Yoshimura, the company’..

Next Story
Infrastructure Transport

Railways to Begin Bullet Train Trial on Surat-Bilimora Section

Indian Railways will begin a trial run of its bullet train service on the 50 km Surat-Bilimora section by May 2027. The section is part of the Mumbai-Ahmedabad high-speed rail corridor and is expected to provide the first operational segment of the project. The trial will use an indigenous trainset capable of travelling at 280 km per hour. Railway Ministry sources said the first section of the corridor, extending from Surat to Vapi, is scheduled to become operational by the end of 2027. The planned trial marks a step towards introducing high-speed rail services on the corridor, which connects ..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code