Relaying 500 roads in Chennai in 15 days
ROADS & HIGHWAYS

Relaying 500 roads in Chennai in 15 days

In preparation for the impending Northeast monsoon, the Greater Chennai Corporation (GCC) has embarked on an ambitious mission to rejuvenate 500 roads across the city by October 10. This initiative aims to provide relief to residents in expanded areas, including Manapakkam, Mugalivakkam, Ramapuram, Porur, and Madipakkam, which have been marred by craters, potholes, and road sink-ins.

Chief Engineer of GCC, S Rajendiran, revealed that significant progress has already been made, with nearly 100 roads having been re-laid since September 20. However, sporadic rainfall has posed challenges to road relaying efforts. Rajendiran explained, "We face challenges in transporting hot mix to the core city areas in the morning due to restrictions on heavy vehicles. Meanwhile, rainfall occurs at night. Hence, we are utilizing sunny days to rehabilitate up to 500 roads before the monsoon arrives."

In preparation for road repairs, the corporation has initiated a campaign, in collaboration with the police, to remove parked and abandoned vehicles from the designated areas. "We are covering up to 20 kilometers each day as part of this drive. Additionally, we are conducting patchwork on 713 crores worth of roads, which is slated for completion prior to the onset of the monsoon season," Rajendiran stated.

The concerted efforts by the GCC underscore the commitment to enhancing Chennai's infrastructure and ensuring the safety and convenience of its residents, particularly in the face of the approaching monsoon.

In preparation for the impending Northeast monsoon, the Greater Chennai Corporation (GCC) has embarked on an ambitious mission to rejuvenate 500 roads across the city by October 10. This initiative aims to provide relief to residents in expanded areas, including Manapakkam, Mugalivakkam, Ramapuram, Porur, and Madipakkam, which have been marred by craters, potholes, and road sink-ins. Chief Engineer of GCC, S Rajendiran, revealed that significant progress has already been made, with nearly 100 roads having been re-laid since September 20. However, sporadic rainfall has posed challenges to road relaying efforts. Rajendiran explained, We face challenges in transporting hot mix to the core city areas in the morning due to restrictions on heavy vehicles. Meanwhile, rainfall occurs at night. Hence, we are utilizing sunny days to rehabilitate up to 500 roads before the monsoon arrives. In preparation for road repairs, the corporation has initiated a campaign, in collaboration with the police, to remove parked and abandoned vehicles from the designated areas. We are covering up to 20 kilometers each day as part of this drive. Additionally, we are conducting patchwork on 713 crores worth of roads, which is slated for completion prior to the onset of the monsoon season, Rajendiran stated. The concerted efforts by the GCC underscore the commitment to enhancing Chennai's infrastructure and ensuring the safety and convenience of its residents, particularly in the face of the approaching monsoon.

Next Story
Resources

ULCCS Showcases Cooperative Model at UN Symposium

Uralungal Labour Contract Co-operative Society (ULCCS) showcased its community-led development model at the United Nations Headquarters in New York, where it participated as a panellist at the International Symposium on Cooperative Financial Institutions held on 28–29 May 2026.Jointly organised by the United Nations Department of Economic and Social Affairs (UN DESA), the International Cooperative Banking Association (ICBA), and the International Cooperative Alliance (ICA), the symposium was held under the theme ‘Fuelling Inclusive and Equitable Growth’ and brought together policymakers,..

Next Story
Infrastructure Transport

Delhi Airport to Finalise 20-Year Master Plan

Delhi International Airport Ltd (DIAL) is finalising a 20-year master plan to guide long term infrastructure and operational development at Indira Gandhi International Airport, an official said. The operator expects the plan to reflect changes in the airline industry, shifts in the competitive landscape and evolving infrastructure requirements across terminals, airside and support services. The official said the document is likely to be ready in the next two to two-and-a-half months as the operator moves through planning stages. The plan will be prepared after consultations with airport users ..

Next Story
Real Estate

Aadhar Housing Finance Targets Rs 500 bn AUM By FY29

Aadhar Housing Finance has set a target to raise its asset under management to Rs 500 billion (bn) by the end of FY29, aiming to achieve this over the next three financial years through an 18-20 per cent loan growth trajectory. The firm focuses on the low-income segment with a ticket size of less than Rs 1.5 million (mn) and has relied on that segment to drive expansion. The company closed FY26 with an AUM of Rs 305.71 bn, reflecting the expansion in recent years, and it reported a net profit rise of 22 per cent to Rs 11.08 bn. Management indicated that gross non-performing assets stood at 1.0..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->