Stalemate Delays Trichy-Thanjavur NH Service Road Project
ROADS & HIGHWAYS

Stalemate Delays Trichy-Thanjavur NH Service Road Project

A protracted dispute has stalled the much-needed service road project along the Trichy-Thanjavur National Highway in India. The development, aimed at improving connectivity and easing traffic congestion, has been mired in disagreements between local authorities and the National Highways Authority of India (NHAI).

The NHAI had proposed the construction of a service road to run parallel to the busy highway, but local authorities have raised concerns about land acquisition and environmental impacts.

This stalemate has left commuters and residents frustrated, as the project's potential benefits, including reduced travel time and improved safety, remain unrealized. Efforts to mediate the dispute and find a mutually agreeable solution are ongoing, but progress has been slow.

The Trichy-Thanjavur NH service road project highlights the challenges faced in infrastructure development in India, where balancing the needs of rapid development with local concerns can be a delicate task.

As discussions continue, stakeholders must work together to find a resolution that ensures both infrastructure improvement and environmental responsibility.

A protracted dispute has stalled the much-needed service road project along the Trichy-Thanjavur National Highway in India. The development, aimed at improving connectivity and easing traffic congestion, has been mired in disagreements between local authorities and the National Highways Authority of India (NHAI). The NHAI had proposed the construction of a service road to run parallel to the busy highway, but local authorities have raised concerns about land acquisition and environmental impacts. This stalemate has left commuters and residents frustrated, as the project's potential benefits, including reduced travel time and improved safety, remain unrealized. Efforts to mediate the dispute and find a mutually agreeable solution are ongoing, but progress has been slow. The Trichy-Thanjavur NH service road project highlights the challenges faced in infrastructure development in India, where balancing the needs of rapid development with local concerns can be a delicate task. As discussions continue, stakeholders must work together to find a resolution that ensures both infrastructure improvement and environmental responsibility.

Next Story
Products

TOTO India Launches Premium G & L Showers with Sleek Faucet Range

TOTO India has launched its G Shower and L Shower series, alongside an expanded range of GT, LH, and Pull-Out lavatory faucets. The collection blends advanced technology, refined aesthetics, and everyday comfort, staying true to TOTO’s philosophy of creating spaces that are both beautiful and functional. The G Shower series delivers the 3Rs of showering: Relaxing, Refreshing, and Revitalizing. Features include the Calming Shawl spray mode, Warm Spa technology, and multiple overhead and hand-shower options across eight finishes. The L Shower complements this with easy-to-use controls sui..

Next Story
Infrastructure Energy

Hero Future Energies Secures Funding for 120 MW Hybrid Project

Hero Future Energies (HFE), through its SPV Clean Renewable Energy Hybrid Three, has secured Rs 19.08 billion in funding from the State Bank of India (lead) and Canara Bank. The funds will be used to develop and construct HFE’s 120 MW renewable energy hybrid project at Kurnool, Andhra Pradesh. The project, contracted with SJVN, integrates wind, solar, and storage technologies to deliver reliable peak power. With a 21-year repayment period, the funding ensures timely execution and the commencement of commercial operations. The financial closure demonstrates continued lender confidence in..

Next Story
Infrastructure Energy

IOC GPS Renewables Raises Rs 8.36 billion Debt for Compressed Biogas Plants

IOC GPS Renewables Private Limited (IGRPL), a joint venture between IndianOil Corporation  and GPS Renewables, has raised Rs 8.36 billion (approx. US$ 95 million) in debt financing from Indian Bank to execute nine Compressed Biogas (CBG) projects across India.   The funding is the largest single-bank debt raise in the CBG sector and the first fully non-recourse financing in India for these projects. The plants—four in Haryana, three in Uttar Pradesh, one each in Chhattisgarh and Andhra Pradesh—will each produce 15 tonnes of CBG per day using paddy straw as feedstock. All nin..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?