Vehicle Scrappage Policy and Road Safety Initiatives
ROADS & HIGHWAYS

Vehicle Scrappage Policy and Road Safety Initiatives

As on 30 January 2026 the ministry reported 129 registered vehicle scrapping facilities are operational across 21 States and union territories and that 430,306 vehicles have been scrapped. The Department of Expenditure has allocated Rs 20 billion (bn) under the Special Assistance to States for Capital Investment scheme for 2025–26 and smaller allocations are expressed in million (mn) amounts.

Lump sum incentives to States range from Rs 100 mn to Rs 2 bn linked to tax concessions. States qualify for graded per vehicle incentives for government vehicles of Rs 50,000 to Rs 150,000 and for non government vehicles of Rs 5,000 to Rs 20,000 based on volumes scrapped at facilities. Automated Testing Station incentives are Rs 50 mn to Rs 90 mn with 25 per cent linked to award of work and 75 per cent to operationalisation.

A statutory Cashless Treatment for Road Accident Victims scheme was notified in May 2025 with guidelines setting process flows and stakeholder roles. The scheme provides treatment cover up to Rs 0.15 mn per victim subject to a maximum of seven days and allows stabilisation and treatment for up to 24 hours in non life threatening cases and up to 48 hours in life threatening cases at designated hospitals. Reimbursements will be routed through the Motor Vehicle Accident Fund funded by general insurers and budgetary support for uninsured cases and the scheme will be implemented using electronic Detailed Accident Report and TMS 2.0 platforms.

Road safety measures include mandatory audits at all stages by third party auditors, designation of a Road Safety Officer at each regional office and issuance of signage guidelines for expressways and national highways. Short term rectification of black spots will use markings, signages and crash barriers while long term measures include geometric and junction improvements. Electronic monitoring rules for enforcement on high risk corridors have been promulgated, provisions for ambulances with paramedical staff at toll plazas have been made and the Rah Veer reward for Good Samaritans has been increased to Rs 25,000 from Rs 5,000, the ministry said.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

As on 30 January 2026 the ministry reported 129 registered vehicle scrapping facilities are operational across 21 States and union territories and that 430,306 vehicles have been scrapped. The Department of Expenditure has allocated Rs 20 billion (bn) under the Special Assistance to States for Capital Investment scheme for 2025–26 and smaller allocations are expressed in million (mn) amounts. Lump sum incentives to States range from Rs 100 mn to Rs 2 bn linked to tax concessions. States qualify for graded per vehicle incentives for government vehicles of Rs 50,000 to Rs 150,000 and for non government vehicles of Rs 5,000 to Rs 20,000 based on volumes scrapped at facilities. Automated Testing Station incentives are Rs 50 mn to Rs 90 mn with 25 per cent linked to award of work and 75 per cent to operationalisation. A statutory Cashless Treatment for Road Accident Victims scheme was notified in May 2025 with guidelines setting process flows and stakeholder roles. The scheme provides treatment cover up to Rs 0.15 mn per victim subject to a maximum of seven days and allows stabilisation and treatment for up to 24 hours in non life threatening cases and up to 48 hours in life threatening cases at designated hospitals. Reimbursements will be routed through the Motor Vehicle Accident Fund funded by general insurers and budgetary support for uninsured cases and the scheme will be implemented using electronic Detailed Accident Report and TMS 2.0 platforms. Road safety measures include mandatory audits at all stages by third party auditors, designation of a Road Safety Officer at each regional office and issuance of signage guidelines for expressways and national highways. Short term rectification of black spots will use markings, signages and crash barriers while long term measures include geometric and junction improvements. Electronic monitoring rules for enforcement on high risk corridors have been promulgated, provisions for ambulances with paramedical staff at toll plazas have been made and the Rah Veer reward for Good Samaritans has been increased to Rs 25,000 from Rs 5,000, the ministry said.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement