BEML Emerges as Lowest Bidder for Bangalore Metro Rolling Stock Tender
RAILWAYS & METRO RAIL

BEML Emerges as Lowest Bidder for Bangalore Metro Rolling Stock Tender

According to sources from the Metro, the rolling stock tender for 72 coaches (12 six-car train sets) was opened on Friday, and BEML has emerged as the lowest bidder. These tenders were initiated by BMRCL in April last year as a contingency plan in case the contracted Chinese firm CRCC failed to deliver the promised 216 coaches for the RV Road to Bommasandra Line.

A reliable source from the Metro stated, "BEML (L-1) has submitted a bid of Rs 106 million per car, while ALSTOM (L-2), the second-place bidder, has quoted Rs 140.2 million per car." It is worth noting that this rate is higher than BEML's recent quote of Rs 77.4 million per car for the 318 cars required for the Underground corridor (Reach-6), ORR (Phase-2A), and Airport Line (Phase-2B).

In December 2019, BMRCL signed a contract worth Rs 15.78 billion with CRCC for 216 coaches, to be delivered by their subsidiary Nanjing Puzhen. However, the Chinese company encountered difficulties in establishing a factory at Sri City in Andhra Pradesh for coach manufacturing.

When asked about the outcome of the back-up tender, considering that the original contract is still in effect, BMRCL MD Anjum Parwez stated, "We need to decide whether to proceed based on the rates quoted by the L1 bidder in this tender and the previous tender for 318 coaches, which was opened recently."

According to sources from the Metro, the rolling stock tender for 72 coaches (12 six-car train sets) was opened on Friday, and BEML has emerged as the lowest bidder. These tenders were initiated by BMRCL in April last year as a contingency plan in case the contracted Chinese firm CRCC failed to deliver the promised 216 coaches for the RV Road to Bommasandra Line. A reliable source from the Metro stated, BEML (L-1) has submitted a bid of Rs 106 million per car, while ALSTOM (L-2), the second-place bidder, has quoted Rs 140.2 million per car. It is worth noting that this rate is higher than BEML's recent quote of Rs 77.4 million per car for the 318 cars required for the Underground corridor (Reach-6), ORR (Phase-2A), and Airport Line (Phase-2B). In December 2019, BMRCL signed a contract worth Rs 15.78 billion with CRCC for 216 coaches, to be delivered by their subsidiary Nanjing Puzhen. However, the Chinese company encountered difficulties in establishing a factory at Sri City in Andhra Pradesh for coach manufacturing. When asked about the outcome of the back-up tender, considering that the original contract is still in effect, BMRCL MD Anjum Parwez stated, We need to decide whether to proceed based on the rates quoted by the L1 bidder in this tender and the previous tender for 318 coaches, which was opened recently.

Related Stories

Gold Stories

Next Story
Real Estate

LML Realty Sells Out Jhirka Valley Industrial Park in Haryana

LML Realty, the real estate arm of LML Group, recently announced the complete sell-out of its Jhirka Valley Industrial Park in Haryana, with over 1.17 million sq ft of industrial space acquired by more than 50 companies. With utilities and internal infrastructure in place, the company has commenced plot handovers, enabling buyers to begin construction and establish their operations.The industrial park has attracted companies across diverse sectors, including chemicals, metals and alloys, textiles, electrical equipment, energy, logistics, construction, polymers and engineering. Key buyers inclu..

Next Story
Real Estate

WSB Real Estate Partners Exits Six Housing Investments

WSB Real Estate Partners recently announced the successful exit of six residential investments across Bengaluru, Mumbai Metropolitan Region (MMR) and National Capital Region (NCR), delivering an average internal rate of return (IRR) of 19–21 per cent and an overall investment return of 1.4 times.The real estate-focused investment firm invested approximately Rs 7 billion across six mid-affordable housing projects over the past four years. All six investments were fully repaid between April and November 2026, several months ahead of their original investment tenures.WSB collaborated with sever..

Next Story
Infrastructure Transport

Aluminium Industry Seeks Policy Support for Rs 4 Trillion Investment

The Aluminium Association of India (AAI) has recently urged the government to introduce supportive policy measures to safeguard the sector’s proposed Rs 4 trillion investment pipeline. The association highlighted the need for a predictable policy framework to strengthen domestic manufacturing, expand production capacity and reduce import dependence.AAI submitted its recommendations for the Union Budget 2027-28 to the Ministries of Finance, Commerce and Industry, and Mines, along with the Department for Promotion of Industry and Internal Trade (DPIIT).India’s aluminium demand is projected t..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code