BEML Emerges as Lowest Bidder for Bangalore Metro Rolling Stock Tender
RAILWAYS & METRO RAIL

BEML Emerges as Lowest Bidder for Bangalore Metro Rolling Stock Tender

According to sources from the Metro, the rolling stock tender for 72 coaches (12 six-car train sets) was opened on Friday, and BEML has emerged as the lowest bidder. These tenders were initiated by BMRCL in April last year as a contingency plan in case the contracted Chinese firm CRCC failed to deliver the promised 216 coaches for the RV Road to Bommasandra Line.

A reliable source from the Metro stated, "BEML (L-1) has submitted a bid of Rs 106 million per car, while ALSTOM (L-2), the second-place bidder, has quoted Rs 140.2 million per car." It is worth noting that this rate is higher than BEML's recent quote of Rs 77.4 million per car for the 318 cars required for the Underground corridor (Reach-6), ORR (Phase-2A), and Airport Line (Phase-2B).

In December 2019, BMRCL signed a contract worth Rs 15.78 billion with CRCC for 216 coaches, to be delivered by their subsidiary Nanjing Puzhen. However, the Chinese company encountered difficulties in establishing a factory at Sri City in Andhra Pradesh for coach manufacturing.

When asked about the outcome of the back-up tender, considering that the original contract is still in effect, BMRCL MD Anjum Parwez stated, "We need to decide whether to proceed based on the rates quoted by the L1 bidder in this tender and the previous tender for 318 coaches, which was opened recently."

According to sources from the Metro, the rolling stock tender for 72 coaches (12 six-car train sets) was opened on Friday, and BEML has emerged as the lowest bidder. These tenders were initiated by BMRCL in April last year as a contingency plan in case the contracted Chinese firm CRCC failed to deliver the promised 216 coaches for the RV Road to Bommasandra Line. A reliable source from the Metro stated, BEML (L-1) has submitted a bid of Rs 106 million per car, while ALSTOM (L-2), the second-place bidder, has quoted Rs 140.2 million per car. It is worth noting that this rate is higher than BEML's recent quote of Rs 77.4 million per car for the 318 cars required for the Underground corridor (Reach-6), ORR (Phase-2A), and Airport Line (Phase-2B). In December 2019, BMRCL signed a contract worth Rs 15.78 billion with CRCC for 216 coaches, to be delivered by their subsidiary Nanjing Puzhen. However, the Chinese company encountered difficulties in establishing a factory at Sri City in Andhra Pradesh for coach manufacturing. When asked about the outcome of the back-up tender, considering that the original contract is still in effect, BMRCL MD Anjum Parwez stated, We need to decide whether to proceed based on the rates quoted by the L1 bidder in this tender and the previous tender for 318 coaches, which was opened recently.

Next Story
Real Estate

AI: The New Recruit

From getting ideas to evaluating designs, presenting concepts to clients and tracking projects, artificial intelligence (AI) is helping architects work better and faster.“AI allows architects to spend more time doing what only they can do: think critically, synthesise complexity and design with intent,” says Dikshu C Kukreja, Managing Principal, CP Kukreja Architects. “Every minute reclaimed from repetitive processes can be invested in creativity, contextual understanding, interdisciplinary collaboration and innovation – the qualities that define meaningful architecture.”To read the ..

Next Story
Real Estate

Redevelopment 2.0

In 2017, Mumbai identified 160,000 ageing buildings due for structural audit. Close to half of these were in the Western Suburbs. Redeveloping the oldest and structurally weakest of these would help unlock new housing, much needed given the city’s growing population density and constant developed area of 437.7 sq km. At 30,600 people per sq km in 2024, Mumbai’s density was almost thrice that of Gurugram, and 60 per cent higher than Bengaluru’s.Essentially, Mumbai’s realty market has demand. It has capital. It has realty development potential.Fast forward to 2026. Mumbai has 1,094 regis..

Next Story
Technology

Cost intelligence will become a strategic contributor to project success

As India's construction industry accelerates its digital transformation, integrated platforms, AI and connected data are becoming essential to improving cost certainty, project efficiency and sustainability. Ravi Kumar, Sales Director – India, RIB Software India, shares how digital workflows are reshaping project planning, commercial management and decision-making across the construction value chain.India's construction sector is embracing digital technologies at an unprecedented pace. From your perspective, what are the biggest shifts driving this transformation and how is RIB Software enab..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement